USPTO serial 79182717
C
Reviewed by CopyMark Law Group
Reg. 5262893Status 404
- Filing date
- Status date
- Registration date
- Aug 15, 2017
- Examiner
- CORWIN, KEVIN SCOTT
- Law office
- Historical data usage
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with C?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
SE-451 18 UDDEVALLA, SE
SE-451 18 UDDEVALLA, SE
SE-451 18 UDDEVALLA, SE
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jessica S. Sachs
Jessica S. Sachs Harness, Dickey & Pierce, P.L.C.5445 Corporate DriveSuite 200Troy, MI 48098Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Ventilation duct cleaning machines; starters for motors ] | SECTION 71 - CANCELLED | — |
| 009 | [ Electric and electronic apparatus, instruments and installations for electrical power generation and distribution, monitoring, analysis and control, namely, electrical switchboards and distribution boards, automation systems primarily composed of electrical power distribution units, electrical power generation units and industrial automation controls for ships, offshore installations, and industrial applications; Electric and electronic apparatus for the control and automation of apparatus, instruments and installations, namely, electrical switchboards and distribution boards, automation systems primarily composed of electrical power distribution units, electrical power generation units and industrial automation controls for ships, offshore installations, and industrial applications; Electric and electronic switching and control apparatus, namely, electrical switchboards and distribution boards, automation systems primarily composed of electrical power distribution units, electrical power generation units and industrial automation controls for ships, offshore installations, and industrial applications; automated apparatus for monitoring, analysis and control, namely, electrical switchboards and distribution boards, automation systems primarily composed of electrical power distribution units, electrical power generation units and industrial automation controls for ships, offshore installations, and industrial applications; apparatus for electronic data transfer, namely, automation systems primarily composed of electrical power distribution units, electrical power generation units for electrical distribution, pump and valve control for engine room plants for ships, offshore installations and industrial installations for the marine, offshore and industrial fields; electric switches, namely, cord, motor and installation protection switches; electric switches and fuses for the protection against transient voltage; temperature sensitive electric relays; time sensitive electric relays; protective electric relays; coupling boxes, electric; electric power distribution apparatus; current distribution boards of metal or insulated materials; transformers; apparatus for current and frequency conversion; distribution switchboards; main and emergency switchboards; ] monitoring and control system, namely, [ electrical switchboards and distribution boards, ] automation systems primarily composed of electrical power distribution units, [ electrical power generation units and industrial automation controls for ships, offshore installations, and industrial applications; control cabinets specifically adapted for electrical switchboards and distribution boards, automation systems primarily composed of electrical power distribution units, electrical power generation units ] and industrial automation controls for ships, offshore installations, [ and industrial applications; ] control cabinets specifically adapted for HVAC systems; [ Automated apparatus for monitoring, analysis and control, namely, electrical switchboards and distribution boards, ] automation systems primarily composed of electrical power distribution units, [ electrical power generation units ] and industrial automation controls for ships, offshore installations, [ and industrial applications; electrical apparatus for electrical power distribution; control apparatus for lighting ] | SECTION 70 - CANCELLED | — |
| 011 | [ Apparatus, equipment, devices, and installations for lighting, namely, interior and exterior lighting installations and fixtures for marine, offshore and industrial applications; Computerized and non-computerized automation apparatus, devices, and installations for lighting, namely, interior and exterior lighting installations and fixtures for marine, offshore and industrial applications;] HVAC units; air handling installations; ventilating fans for commercial and industrial use adapted for marine, offshore and industrial applications; refrigeration units for cooling air and groceries on ships and offshore installations in the marine, offshore, and industrial fields; Dampers, namely, control devices used in air ducts to regulate and control the flow of air and pressure and fire dampers used to prevent fire from spreading; Air ventilation apparatus and instruments; Devices for supply and exhaust of air, consisting of valves, ventilation fan grills and diffusers, used on ships, offshore installations and industrial installations for the marine, offshore and industrial fields; air conditioning systems; air filtration installations; air filtration installations, namely, air filters for use with HVAC apparatus in the marine, offshore, and industrial fields | SECTION 70 - CANCELLED | — |
| 017 | [ Rubber, gutta-percha, gum, asbestos, mica; plastics in extruded form for use in manufacture; packing and insulating materials; stopping materials, namely, traditional and cryogenic insulating materials for vessels, marine gas cargo tanks, pipeworks, and cryogenic cargo pipelines; non-metallic flexible pipes; Insulation for Industrial and marine construction, namely, sprayed foams and polyuria coatings for cryogenic pipe and cargo tanks for the marine and industrial fields; insulation for the marine field, offshore field and industrial fields, namely, mineral fibre insulation for bulkheads, deckheads, system pipework exhaust and HVAC systems; fire insulation, namely, mineral fibre insulation for bulkheads, deckheads, system pipework exhaust and HVAC systems; acoustic insulation; thermal insulation; insulation for pipes and tanks ] | SECTION 71 - CANCELLED | — |
| 035 | [ Cost analysis ] | SECTION 7(e) - CANCELLED | — |
| 037 | [ Construction services for ships, offshore installations and industrial installations; repair services for equipment for heating, ventilation, air-conditioning and refrigeration (HVACR) systems; repair services for equipment related to electrical power generation and distribution, monitoring, analysis and control; repair services for cargo containment systems related to tank insulation on LNG, LPG and LEG tanks; repair services for cargo containment systems related to pipe insulation on LNG, LPG and LEG cargo loading and unloading systems; repair services for equipment related to architectural outfitting; repair services for structural and service insulation systems; shipbuilding; installation, maintenance and repair of equipment for refrigeration, heating, ventilation and air-conditioning; installation, repair and maintenance of thermal, fire and acoustic insulation; refurbishment, namely, retrofit of HVAC systems, electrical systems, automation systems and insulation on existing ships, offshore installations and industrial installations in the marine, offshore and industrial fields; construction supervision; construction of interior accommodation; shipyard services, namely, maintenance and repair of ships; installation of electrical and electronic systems, switchboards and control systems; installation, maintenance and repair of electrical distribution and automation systems; conversion, repair, maintenance, cleaning and retrofitting of electrical and automation units; Installation and repair of insulation in the marine, offshore, and industrial fields; inspection of shipbuilding and shipbuilding projects; inspection of thermal, fire and acoustic insulation in the course of construction of ships cargo tanks and associated pipeworks ] | SECTION 71 - CANCELLED | — |
| 040 | [ Manufacture of thermal, fire and acoustic insulation for the marine, offshore, and industrial fields to the order and/or specification of others ] | SECTION 71 - CANCELLED | — |
| 042 | [ Scientific and technological services and research and design relating thereto, namely, assessment services for engineered insulation systems, HVAC systems, electrical systems and automation systems, for the marine, offshore and industrial fields; Scientific and technological services and research and design relating thereto, namely, assessment services for energy efficiency in the marine, offshore, and industrial fields; industrial analysis services, namely, scientific research and development, namely, research and development of HVAC systems, insulation, electrical systems, automation systems, and energy efficiency solutions for the marine, offshore, and industrial fields; design and development of computer hardware and software; engineering services; Technological project studies, namely, technology research for HVAC systems, insulation, electrical systems, automation systems, and energy efficiency in the marine, offshore, and industrial fields; Technological project management services for ships, offshore installations and industrial installations, for the marine, offshore and industrial fields; technological consultancy and planning of building construction in the marine, offshore and industrial fields; ship design services; ship architectural services; ship engineering services; services in connection with operation of ships, namely, design and development of automation equipment and electrical equipment; development, installation, update and maintenance of computer software; architectural project management; quality control services for others; Conducting engineering surveys; environmental monitoring services, namely, environmental testing and inspection services and engineering services in the field of environmental compliance; quality control for others, namely, project commissioning of heating, ventilation, air-conditioning and refrigeration (HVACR) systems; quality control for others, namely, project commissioning for equipment related to electrical power generation onboard and distribution, monitoring, analysis and control thereof, for the marine field, offshore field and industrial markets; scientific research, namely, scientific life cycle analysis; energy conservation studies, namely, research in the field of energy; consultancy and drafting of architectural and engineering-based technological projects relating to sustainability and energy efficiency; drafting of equipment-based projects for the purpose of energy efficiency and energy savings; technological planning and consulting services in the field of renewable energy resources, namely, engineering battery driven propulsion for ships; scientific services, namely, scientific research and development related to air conditioning, water equipment, generation and cogeneration from primary and renewable sources and the integration thereof and as part of integrated solutions for heating and cooling; technical inspection services, namely, technology supervision and inspection of ships, offshore installations and industrial installations, and preparation of technical inspection reports related thereto, for the marine, offshore and industrial fields; conducting scientific feasibility studies in the field of insulation, HVAC, electric and automation engineering; engineering; design engineering; engineering and design support services, namely, consulting in the field of engineering and consulting in the field of design and development of engineering processes; electrical engineering services for equipment related to electrical power generation and distribution, monitoring, analysis and control; information and consultancy relating to all the aforementioned services; architectural planning services; inspection of equipment for refrigeration, heating, ventilation and air-conditioning; supervision, namely, quality control services for others; inspection of onboard installations, namely, HVAC, electrical and automation systems, as well as insulation; scientific research, namely, creating solutions to optimize ships operation by means of optimized design, software and products for fluid machinery systems, heating ventilation and air conditioning, power generation and propulsion solutions ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Callenberg Group AB
- Other trademarks owned by Callenberg Group AB
- Other trademarks owned by Callenberg Group AB
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 017
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named C
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 5, 2026 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Mar 5, 2026 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 7, 2025 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 1, 2025 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Oct 1, 2025 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| May 24, 2025 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 24, 2024 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Sep 24, 2024 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Sep 23, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 24, 2024 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Aug 15, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jul 26, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 17, 2018 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Apr 16, 2018 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 22, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 5, 2017 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 5, 2017 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 15, 2017 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 16, 2017 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Aug 16, 2017 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Aug 16, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 15, 2017 | EXPT | EXPARTE APPEAL TERMINATED | — |
| Aug 15, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 30, 2017 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 30, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 30, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 10, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 25, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 22, 2017 | EXPT | EXPARTE APPEAL TERMINATED | — |
| Apr 19, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 19, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 19, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 17, 2017 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Apr 17, 2017 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Apr 17, 2017 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Apr 17, 2017 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Oct 17, 2016 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 17, 2016 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 17, 2016 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 15, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 15, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 10, 2016 | ALIE | ASSIGNED TO LIE | — |
| Sep 2, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 26, 2016 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 4, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 4, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 4, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 3, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 1, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 25, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 25, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 23, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |