USPTO serial 79184178
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeffrey B. Sladkus, Esq.
Jeffrey B. Sladkus, Esq. The Sladkus Law Group1827 Powers Ferry RoadBuilding 6, Suite 200Atlanta, GA 30339| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Consultancy in relation to civil engineering construction and supervision of construction work; building construction supervision; plumbing maintenance advisory services; construction management and construction project management; supervision of underwater construction; building construction; construction work relating to laying of foundations; site levelling for building construction purposes; construction of water barrage in the nature of barriers against water floods, embankments, breakwaters, piers, embankments, docks, canal locking structures, canals, dams, foundations for civil engineering structures, piling, drainage systems; marine and underwater construction; underwater construction, installation and repair of embankments, breakwaters, piers, docks, canal locking structures, canals, dams, foundations for civil engineering structures, piling, drainage systems; construction of soil protecting barricades to prevent soil erosion; dredging; underwater dredging; installation of environmental engineering systems; installation, maintenance and repair of marine vessel docking installations, breakwaters, piers, canal locking structures, drainage systems; laying, construction, maintenance and repair of pipes; scaffolding installation; laying and splicing of undersea cables; cleaning of culverts; repair and maintenance of building scaffolds, working and building platforms; installation work, repair and maintenance of water purifying apparatus; repair or maintenance of water pollution control equipment; underwater repair; excavation services; hydraulic construction services, construction of hydraulic installations in the form of drainage systems, breakwaters, canal locking structures ; civil engineering construction of soil barriers for the prevention of inundation of land and buildings by flood water; painting of marine engineering plants; maintenance of marine engineering plants; services for the stabilization of the sea bed by vibratory compaction, injection of cement, injection of grout or insertion of reinforcing bars; services for the stabilization of ground by insertion of reinforcing bars; site clearing for construction purposes; dismantling of engineering plants structures; civil engineering demolition of buildings and engineering plants; construction of electromechanical structures and systems for regulating and containing tidal stream in fragile and highly protected areas of coastline; all of the foregoing services as applied to the fields of flood control, marine engineering, ecological services and environmental restoration | SECTION 71 - CANCELLED | — |
| 042 | Environmental testing; biotechnology testing of laboratory samples; scientific research and advisory services in the field of environmental conservation; professional scientific consultancy relating to marine technology; technical consulting in the field of environmental engineering; environmental monitoring of waste storage areas by testing such areas for presence of contaminants; environmental surveys, namely, environmental testing; scientific research and advisory services relating to environmental pollution detection; scientific research and advisory services in the field of environmental safety; environmental hazard assessment namely, environmental hazard testing; technological scientific advice relating to pollution damage; underwater exploration; marine, aerial and land surveying; scientific and industrial research relating to environmental engineering; scientific research relating to ecology; research relating to marine surveying; water quality control services; underwater structural inspection services; providing a website featuring scientific information relating to geophysical measurement; fluvial, lagoon and marine hydraulic engineering; technical engineering; environmental testing within civil engineering structures; environmental testing, namely, monitoring of events which influence the environment within civil engineering structures; engineering for flood prevention; engineering research; structural engineering services; civil engineering planning services; engineering project studies; scientific analysis of the structural behavior of buildings; design of clean rooms; engineering and computer-aided engineering services; engineering feasibility studies; architectural design of construction projects; scientific research relating to the creation of mobile systems in defense against floods; design of soil barriers in defense against floods; design and development of computer hardware and software for use in systems that defend against floods; software engineering; computer project management services; providing scientific information in the field of technology; research and consultancy services in the field of environmental protection; software development, programming and implementation; technical project studies relating in the field of environmental protection as it relates to dredging; all of the foregoing services as applied to the fields of flood control, marine engineering, ecological services and environmental restoration | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 12, 2026 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Mar 12, 2026 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Oct 18, 2024 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 1, 2024 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Oct 1, 2024 | INPC | INVALIDATION PROCESSED | — |
| Sep 27, 2024 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 26, 2024 | C71T | CANCELLED SECTION 71 | — |
| Jul 11, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 28, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 11, 2017 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 11, 2017 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 11, 2017 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 11, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 25, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 25, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 22, 2017 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Apr 5, 2017 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 5, 2017 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 5, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 18, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 17, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 17, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 17, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 17, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 17, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 17, 2017 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Mar 9, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 9, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 9, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 9, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 9, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 9, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 9, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 2, 2017 | ALIE | ASSIGNED TO LIE | — |
| Feb 16, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 25, 2016 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 11, 2016 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 11, 2016 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 11, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 20, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 20, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 20, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 20, 2016 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 20, 2016 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 14, 2016 | RFNT | REFUSAL PROCESSED BY IB | — |
| Mar 22, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 22, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 22, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 21, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 18, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 14, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 14, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 11, 2016 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Mar 10, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |