Drawing for ACTIVE GAS INHIBITION SYSTEM

USPTO serial 79184261

ACTIVE GAS INHIBITION SYSTEM

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
—
Examiner
PHILLIPS, WENDELL SHARMAN
Law office
TMO LAW OFFICE 110 - EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ACTIVE GAS INHIBITION SYSTEM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Measuring equipment; control equipment; monitoring equipment; transformers electricity; electric coils; switching devices; sensors; computers; on-load tap-changers on transformers and coils; software; mechanical, electromechanical, electrical, electronic and sensor-based measuring equipment, control equipment and monitoring equipment; equipment and computer software for actuating, controlling, monitoring and testing electric networks and electric installations, transformers, coils, switching devices, on-load tap-changers on transformers and coils, and motor-drives for on-load tap-changers on transformers and coils; equipment and computer software for securing and improving the energy quality of public, private and industrial power supply systems; installations and computer software for conducting, transforming, accumulating or controlling electric energy, power, current and voltage; installations and computer software for influencing and controlling power supply systems and electric networks, and for securing and improving quality of supply in power supply systems and electric networks; individual parts and assemblies for the aforesaid goodsSECTION 70 - CANCELLED—
037Assembly, commissioning (putting into service), inspection, maintenance, repair and overhaul of power supply systems, electric networks and electric and technical systems and equipment, measuring equipment, control equipment, monitoring equipment, transformers, coils, switching devices, sensors, computers, on-load tap-changers on transformers and coils, motor-drives for on-load tap-changers on transformers and coils, and equipment for actuating, controlling, monitoring and testing transformers, coils, switching devices, electric networks and electric installations; assembly, commissioning (putting into service), inspection, maintenance, repair and overhaul of equipment for actuating, controlling, monitoring and testing on-load tap-changers on transformers and coils; assembly, commissioning (putting into service), inspection, maintenance, repair and overhaul of equipment for actuating, controlling, monitoring and testing motor-drives for on-load tap-changers on transformers and coils; assembly, commissioning (putting into service), inspection, maintenance, repair and overhaul of equipment for securing and improving the energy quality of public, private and industrial power supply systems, and installations for conducting, transforming, accumulating or controlling electric energy, power, current and voltage; assembly, commissioning (putting into service), inspection, maintenance, repair and overhaul of installations for influencing and controlling power supply systems and electric networks, and for securing and improving quality of supply in power supply systems and electric networksSECTION 70 - CANCELLED—
042Engineering, consultancy, research, technical project studies, quality control and technical surveying; engineering, consultancy, research, technical project studies, quality control and technical surveying in connection with power supply systems, electric networks and electric and technical systems and equipment, with measuring equipment, control equipment, monitoring equipment, transformers, coils, switching devices, sensors, computers, on-load tap-changers on transformers and coils, with motor-drives for on-load tap-changers on transformers and coils, with equipment for actuating, controlling, monitoring and testing transformers, coils, switching devices, electric networks and electric installations, on-load tap-changers on transformers and coils, and motor-drives for on-load tap-changers on transformers and coils, with equipment for securing and improving the energy quality of public, private and industrial power supply systems, with installations for conducting, transforming, accumulating or controlling electric energy, power, current and voltage, and with installations for influencing and controlling power supply systems and electric networks, and for securing and improving quality of supply in power supply systems and electric networks; planning, design, installation, updating, commissioning, inspection, maintenance, repair and overhaul of computer software; consultancy in connection with computer softwareSECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 19, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 27, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 10, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 10, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 3, 2017FINTFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 18, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 18, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 1, 2017OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Aug 16, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 16, 2017OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 18, 2016MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Oct 18, 2016ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
May 14, 2016RFNTREFUSAL PROCESSED BY IB—
Mar 22, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 22, 2016RFRRREFUSAL PROCESSED BY MPU—
Mar 19, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 18, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 15, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 11, 2016DOCKASSIGNED TO EXAMINER—
Mar 11, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 10, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance