USPTO serial 79185243
ABL
Reviewed by CopyMark Law Group
Reg. 5273268Status 708Renewal
- Filing date
- Status date
- Registration date
- Aug 29, 2017
- Examiner
- FARRELL,ANNE M
- Law office
- —
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with ABL?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*
Plus Government fees of $650
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Michael Frodsham
Michael Frodsham Workman Nydegger60 East South TempleSuite 1000Salt Lake City, UT 84111Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [ Metal fixing products, namely, bolts, nails, rivets, screws, binding screws of metal for cables, cable clamps of metal, metal cable clips ] | SECTION 71 - CANCELLED | — |
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity; electric apparatus for the distribution of electricity; [ switches, electric; electrical apparatus for commutation; electrical safety switches; ] electric motor protectors; electric couplings; [ electric installation and fixing materials, namely, electric cables; ] electric plugs and sockets and other electric connections/contacts; electric junction boxes; [ conduit boxes for electricity; ] electric connections in the nature of moveable electric sockets; electric plugs; shockproof, electric plugs; electrical wall sockets; [ electric plug in devices, namely, clips; ] plug-in connectors; electrical distributors; electrical power outlet boxes; electric relays; circuit breakers; [ junction boxes for devices; charging stations and chargers, electric; charging stations and chargers, electric, for batteries and accumulators for vehicles, in particular electric vehicles; batteries, electric; electric lighting controls; electric power supplies; data processing equipment, namely, computers; computer software for computers, namely, software for electrical power monitoring, conducting, switching, transforming, accumulating, regulating, distributing and controlling electricity ] | ACTIVE | — |
| 020 | [ Fixing materials of plastic, namely, bolts, nails, rivets, screws, not of metal, Binding screws, not of metal, for cables, non-metal cable clamps, Plastic ducts and couplings for organizing and holding fiber optic and similar cable and wiring, Clips, not of metal, for cables ] | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ABL GmbH
- Other trademarks owned by ABL SURSUM Bayerische Elektrozubehör GmbH & Co. KG
- Other trademarks owned by ABL SURSUM Bayerische Elektrozubehör GmbH & Co. KG
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 020
- Similar marks named ABL
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 1, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Apr 12, 2025 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 2, 2025 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 2, 2025 | INPC | INVALIDATION PROCESSED | — |
| Mar 1, 2025 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Dec 25, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 24, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 24, 2024 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Apr 24, 2024 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Apr 22, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 18, 2023 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Feb 12, 2023 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 29, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Feb 2, 2018 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 19, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 12, 2017 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Dec 12, 2017 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Nov 29, 2017 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 29, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 24, 2017 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 13, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 13, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 7, 2017 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 7, 2017 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 24, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| May 9, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 3, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 2, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 2, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 2, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 2, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 31, 2016 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 31, 2016 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 31, 2016 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 5, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 5, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 30, 2016 | ALIE | ASSIGNED TO LIE | — |
| Sep 21, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 14, 2016 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 1, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Mar 31, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Mar 31, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Mar 30, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Mar 29, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 28, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 28, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Mar 24, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |