Drawing for RPM BELGIUM VANDEX GROUP

USPTO serial 79185311

RPM BELGIUM VANDEX GROUP

Reviewed by CopyMark Law Group

Reg. 5188775Status 404
Filing date
Status date
Registration date
Apr 25, 2017
Examiner
SEVERSON, JUSTIN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with RPM BELGIUM VANDEX GROUP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Alex Patel

ALEX PATEL PATEL & ALMEIDA, P.C.16830 VENTURA BLVD.SUITE 360ENCINO, CA 91436

Goods and services

ClassDescriptionStatusFirst use
001Chemical preparations in the form of paste and coatings for the waterproofing of floor tiles and paving (except paints); chemical preparations in the form of pastes and coatings for the protection of floor tiles and paving from deterioration caused by weather influences and chemical influences; chemical products based on polymers and synthetic resins used in laying industrial flooring; mastics (synthetic resins as a raw material) based on prepolymers; emulsions for the smoothing of cement-bound floors; chemical products (except paints) for waterproofing of floors, roofs and walls; adhesives used in the building industrySECTION 71 - CANCELLED—
002Paints, pastes, coatings and varnishes for floors; coatings (paints) with a polymer or pre-polymer base used to protect against atmospheric and chemical influences and acting preventively against corrosion; mastic (natural resins) with a polymer and prepolymer base for weatherstripping or glueing; emulsions for leveling and removing dust from floors; top coatings made of polyurethaneSECTION 71 - CANCELLED—
017Weatherstripping compositions; mastic for weatherstripping; insulating paints and varnishes; products for waterproofing of floors, roofs and walls; polyurethane insulation materials for constructionSECTION 71 - CANCELLED—
019Floors of synthetic material with a high chemical resistance; industrial floorings (not of metal); seamless cement floors; bitumen; cement and bituminous coatings for floors and roofs; polyurethane materials with insulating properties; roof coverings, not of metal; mortar for buildingSECTION 71 - CANCELLED—
037Construction, maintenance and repair services; services in the areas of project development construction; technical consultancy for construction; civil engineering services (onshore and offshore), particularly in the areas of sealing and amongst others for protecting buildings, monuments, masonry and constructions of concrete (such as roads, tunnels, bridges, runways, silos) against humidity and other environmental influences; professional consultancy for construction and civil engineering services (onshore and offshore), particularly in the area of sealing and amongst others for protecting buildings, monuments, masonry and constructions of concrete (such as roads, tunnels, bridges, runways, silos) against humidity and other environmental influences; supervision (control of) civil engineering projectsSECTION 71 - CANCELLED—
042Professional consultancy in the field of project development; technical project studies for construction projects; design services for construction projectsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 23, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jul 23, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Aug 24, 2024INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jul 31, 2024INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 31, 2024INPCINVALIDATION PROCESSED—
Jul 11, 2024INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 10, 2023C71TCANCELLED SECTION 71—
Jun 10, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 25, 2022REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 1, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 1, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 31, 2017FIMPFINAL DISPOSITION PROCESSED—
Jul 25, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 25, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 7, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 7, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 3, 2017GPNXNOTIFICATION PROCESSED BY IB—
Jan 18, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 18, 2017OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 18, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 4, 2017PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 15, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 5, 2016ACECAMENDMENT FROM APPLICANT ENTERED—
Dec 5, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 22, 2016ALIEASSIGNED TO LIE—
Nov 3, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 19, 2016RFNTREFUSAL PROCESSED BY IB—
May 3, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 3, 2016RFRRREFUSAL PROCESSED BY MPU—
May 3, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 2, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 27, 2016RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Apr 27, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 26, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 18, 2016DOCKASSIGNED TO EXAMINER—
Apr 1, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 28, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 24, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance