Drawing for GARANTELL

USPTO serial 79186340

GARANTELL

Reviewed by CopyMark Law Group

Reg. 5143932Status 708Renewal
Filing date
Status date
Registration date
Feb 21, 2017
Examiner
MIDDLETON, BERNICE L
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with GARANTELL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jessica S. Sachs

Jessica S. Sachs Harness, Dickey & Pierce, P.L.C.5445 Corporate DriveSuite 200Troy, MI 48098

Goods and services

ClassDescriptionStatusFirst use
006[ Common metals and their alloys; building materials of metal, namely, building panels; buildings, transportable, of metal; ] non-electric [ cables and ] wires of common metal; [ pipes and tubes of metal; ] wire mesh; shelf brackets of metal; [ shelf supports of metal other than parts of furniture in the construction industry; ] metal nuts, metal bolts and fasteners, namely, metal bars and chains of metal; wire nets of metal; [ sheet metal; galvanized steel sheets; anti-friction sheet metal; locks of metal, other than electric; lock parts of metal, other than electric; metal shelter structures and transportable buildings of metal; portable shelter structures of metal; metal storage shelters; fences of metal; ] walls panels of metal; metal roofing; fences of metal; metal fence posts; [ structures of metal, namely, metal fence panels; tiles of metal; tiles of metal for building; wainscoting of metal; containers of metal for transport and industrial packaging containers of metal; wire fences; doors, gates, windows and outdoor blinds of metal; ] doors of metal; [ roller doors of metal; door fittings, of metal; pallet racks of metal; ] parts and fittings thereforACTIVE—
037[ Civil construction services of warehouses and industrial plants; building, construction and demolition of modular buildings, shelters and storage facilities; installation, repair and maintenance of energy production and energy transmission industrial plants; warehouse repair and maintenance; construction, installation, repair and maintenance of grills, fences, shelves and storage systems ]SECTION 71 - CANCELLED—
042[ Engineering design services; ] industrial design; design of industrial products; advisory services relating to design of industrial products [ ; engineering services; civil engineering planning services ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 21, 2026REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 16, 2025RNWLINTERNATIONAL REGISTRATION RENEWED—
Jun 20, 2025INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
May 19, 2025INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 19, 2025INPCINVALIDATION PROCESSED—
Mar 2, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 2, 2024NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Jul 2, 2024C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Apr 16, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 29, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 14, 2023ES75TEAS SECTION 71 & 15 RECEIVED—
Feb 21, 2022REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 2, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 2, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 2, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 20, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 1, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 12, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 12, 2017FIMPFINAL DISPOSITION PROCESSED—
May 21, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 21, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 17, 2016GPNXNOTIFICATION PROCESSED BY IB—
Dec 6, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 6, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 30, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 30, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Nov 16, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 3, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 27, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 5, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 5, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 30, 2016ALIEASSIGNED TO LIE—
Sep 21, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 27, 2016RFNTREFUSAL PROCESSED BY IB—
May 6, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 6, 2016RFRRREFUSAL PROCESSED BY MPU—
May 6, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 5, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 3, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 29, 2016DOCKASSIGNED TO EXAMINER—
Apr 29, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 28, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance