Drawing for ULTRAGATE

USPTO serial 79186809

ULTRAGATE

Reviewed by CopyMark Law Group

Reg. 5366697Status 404
Filing date
Status date
Registration date
Jan 2, 2018
Examiner
KAJUBI, ELIZABETH N
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ULTRAGATE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Patricia Smink Rogowski

Patricia Smink Rogowski Panitch Schwarze Belisario & Nadel LLP2005 Market Street, Suite 2200Philadelphia, PA 19103UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Instruments and cables for electricity, namely, electric cables; apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, namely, electric switches, switches for current, current transformers, accumulators, electric capacitors, electric regulators, electric controllers; energy technology systems for conducting, switching, transforming, accumulating, regulating and controlling electricity, namely, combinations of inverters, voltage transformers, disconnection units for DC and AC side, and temperature sensors; energy technology systems for conducting, switching, transforming, accumulating, regulating and controlling electricity, namely, combinations of inverters, voltage transformers, low voltage distributors, medium voltage switchgears, disconnection units for DC and AC side, and temperature sensors; apparatus and instruments for the measurement and analysis of electricity, namely, electric meters; electric power supplies; electric mains monitoring apparatus; current transformers; inverters, in particular solar and photovoltaic inverters; battery inverters; rectifiers; inverter units; frequency transformers; converters, electric; voltage converters; direct current-to-direct current converters; ac voltage converters; electricity transformers; batteries; electric and electrical storage batteries; electric and electronic measuring apparatus, namely meters for measuring electricity, and measuring sensors and measurement transducers; commutators; electric switches; electric breaker switches; electric cables and wires; electrical circuits and circuit boards; electrical and electronic circuits, in particular for energy technology apparatus and energy technology installations; energy technology systems comprised of meters, computers and displays, for analysing and monitoring energy technology apparatus and energy technology installations, in particular solar, photovoltaic and energy supply installations; apparatus and systems, in particular energy technology systems, for analysing and monitoring voltages and current flows, comprised of voltage meters and electric current meters; energy technology systems comprised of temperature sensors, for analysing and monitoring the temperature of energy technology apparatus and energy technology installations, for analysing solar, photovoltaic and energy supply installations; protective systems for energy technology apparatus and energy technology installations including solar, photovoltaic and energy supply installations, comprising apparatus for analysing and monitoring energy technology apparatus and energy technology installations, namely, surge protectors and voltage meters, apparatus for analysing and monitoring voltages and current flows, namely, voltage meters, electric current meters; voltage and frequency protection apparatus, namely, voltage meters and surge protectors for energy technology apparatus and energy technology installations, including solar, photovoltaic and energy supply installations; voltage monitor modules; voltage surge protectors; electric power generation main monitoring modules, comprising voltage meters and electric current meters; electrical power controllers; mains connection boxes, in particular for inverters; power packs in the nature of batteries; power packs in the nature of transformers; electricity distribution boxes; electrical distribution boxes; power distribution panels; generator connector boxes; computer hardware and peripheral devices and electronic assemblies, in particular microprocessors; solar and photovoltaic modules and replacement parts therefor; solar collectors for power generation, and replacement parts therefor; electronic data loggers, in particular for capturing and transmitting data from energy technology apparatus and installations, in particular solar, photovoltaic and energy supply installations; optical display devices; electric displays, namely, computer screens and touch-screens, in particular for inverters; data processing apparatus, in particular electric data processing apparatus; computer software and computer evaluation software for controlling inverters in energy technology apparatus and energy technology installations, in particular solar, photovoltaic and energy supply installations; software for controlling and managing energy technology apparatus and installations; software for presenting data from energy technology apparatus and installations; software for providing access to information on the internet in the field of energy technology; voltage meters, voltage regulators, and electric current meters for collecting, transmitting and evaluating data from solar, photovoltaic and energy supply installations; parts and accessories for measuring and regulating devices in the nature of voltage meters, voltage regulators and electric current meters; all of the aforesaid goods expressly excluding coordinate measuring apparatus and parts therefor, and software in the field of coordinate measuring technologySECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 24, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Sep 24, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 9, 2025ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jun 27, 2025INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jun 12, 2025INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jun 12, 2025INPCINVALIDATION PROCESSED—
Mar 19, 2025INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 19, 2024C71TCANCELLED SECTION 71—
Jan 2, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 13, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 27, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 29, 2018CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
May 19, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 4, 2018CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Apr 12, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 12, 2018FIMPFINAL DISPOSITION PROCESSED—
Apr 2, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 2, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 8, 2017OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 17, 2017GPNXNOTIFICATION PROCESSED BY IB—
Oct 25, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 25, 2017OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 17, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 17, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 4, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 4, 2017OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 27, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 11, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 21, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 21, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 21, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 21, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 21, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 21, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 23, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 23, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 18, 2017ALIEASSIGNED TO LIE—
Dec 19, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 19, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 2, 2016ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 2, 2016REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 9, 2016RFNTREFUSAL PROCESSED BY IB—
Jun 21, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 21, 2016RFRRREFUSAL PROCESSED BY MPU—
Jun 21, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 20, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 13, 2016DOCKASSIGNED TO EXAMINER—
May 24, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
May 20, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 19, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance