Drawing for VESTAS TURBINEPLUS

USPTO serial 79187060

VESTAS TURBINEPLUS

Reviewed by CopyMark Law Group

Reg. 5471831Status 404
Filing date
Status date
Registration date
May 22, 2018
Examiner
FENNESSY, EDWARD JOHN
Law office
TMEG LAW OFFICE 101

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with VESTAS TURBINEPLUS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Windmills, wind power plants, wind turbines, off-shore wind mills, off-shore wind power plants and off-shore wind turbines; parts and accessories for the aforesaid goods in the nature of products developed to upgrade and extend the lifetime of existing wind turbines, namely, mill towers and masts, blades, blade hubs, mill housings, bottom-mounted and floating mill foundations, rotation devices, yaw rings, drip trays, rain gutters and gears all specially adapted for windmills and wind turbines; devices specially adapted for wind turbines and windmills for setting the pitch of the blades, namely, devices for regulating the pitch of the wings or blades by shifting or turning the profile angle of each wing or blade in relation to the rotor blade defined by all the wings and blades; brakes and brake devices for windmills and wind turbines; main shafts for windmills and wind turbines; universal joints for windmills and wind turbines; transmissions for windmills and wind turbines; clutches for windmills and wind turbines and electric generators; cooling devices, namely, cooling radiators for motors and engines, and pumps for cooling engines and for cooling fans of motors and engines; helicopter landing pads for wind turbines in the nature of helidecks sold as an integral component of wind turbines; reserve power supply units in the nature of auxiliary power units for supplying electrical power; structural parts for all the aforesaid goodsSECTION 71 - CANCELLED—
009Electrical, electronic and computer equipment for windmills, wind power plants, wind turbines and other wind-operated machines, in the nature of equipment developed to upgrade existing electrical, electronic and computer equipment for windmills, namely, electrical switches, electronic computers, and computer hardware; control and monitoring equipment, namely, electric control devices for automatically turning on or off the generator and for automatic starting after public power line breakdowns; surge protectors for overvoltage protection against strokes of lightning; microprocessor equipment for controlling and monitoring voltage, frequency, phase conditions, rotor speed, efficiency and thickness of brakes pads, temperature, wind direction and wind speed; vibration and oscillation sensors for installation in windmill housings; watt-hour meters; computer software for the operation, control and maintenance of wind turbines and software to enhance the performance of wind turbines; structural parts for all the aforesaid apparatusSECTION 71 - CANCELLED—
035Commercial advisory services relating to exploitation of wind energy and business advice on optimization and prolongation of energy production from wind turbines, on opportunities and solutions for extending the lifetime of wind turbines, and on optimizing the exploitation of wind turbines by upgrading wind turbine components and by enhanced control of the operation of wind turbines and by enhanced aerodynamic performances; commercial assistance in connection with optimizing energy production and yield from wind turbines and commercial assistance in connection with ensuring continued production and yield from wind turbines beyond expected life timeSECTION 71 - CANCELLED—
037Repair, installation, maintenance and overhaul of machines and machine partsSECTION 71 - CANCELLED—
042Scientific and technological services, namely, scientific and technological research and analysis in the fields of wind energy, wind turbines and wind power plants and new product research and development all in the fields of wind energy, wind turbines and wind power plants and technical analysis, calculations and assessments of and for the improvement of the performance of wind energy and wind turbines; development of new products and of new engineering processes and concepts all aimed at improving the service, maintenance, repair and performance of wind turbines; technological advice and assistance in connection with implementing mechanical parts for wind turbines, implementing computer hardware and software for wind turbines and implementing engineering processes all for optimization and/or prolongation of energy production from wind turbines and third party certification, namely, testing, analysis, and evaluation of wind turbines to determine conformity with certification standards in order for operation beyond designed life time; consultancy and assistance in the field of quality control in connection with improving the monitoring, operation and control of windmills, wind turbines and wind power plants and other renewable energy power plants and quality control for others in the nature of remote monitoring, operation and control of windmills, wind turbines and wind power plants; technical data analysis services and technical inspection services in relation to windmills, wind power plants, wind turbines and other wind-operated machines and their parts and components for purposes of improved operation and production and for enabling operation beyond their design life timeSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 2, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jul 2, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Feb 26, 2026INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jan 27, 2026INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jan 27, 2026INPCINVALIDATION PROCESSED—
Aug 6, 2025INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 6, 2024C71TCANCELLED SECTION 71—
Sep 28, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 8, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 8, 2018FIMPFINAL DISPOSITION PROCESSED—
Aug 22, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 22, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Mar 9, 2018GPNXNOTIFICATION PROCESSED BY IB—
Mar 6, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 6, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 14, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 14, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 14, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 25, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 23, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Jan 23, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 23, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 23, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 17, 2017OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 1, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 1, 2017OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Sep 8, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 16, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 11, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 24, 2017GPNXNOTIFICATION PROCESSED BY IB—
Feb 10, 2017DOCKASSIGNED TO EXAMINER—
Feb 10, 2017ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Feb 10, 2017DOCKASSIGNED TO EXAMINER—
Feb 10, 2017ISSRWITHDRAWN FROM ISSUE - SENIOR ATTORNEY REQUEST—
Feb 9, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 24, 2017DOCKASSIGNED TO EXAMINER—
Jan 17, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 17, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 11, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 11, 2017OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Dec 28, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 15, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 1, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 1, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 1, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 1, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 17, 2016RFNPREFUSAL PROCESSED BY IB—
Jun 2, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 2, 2016RFRRREFUSAL PROCESSED BY MPU—
Jun 2, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 1, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 31, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
May 27, 2016DOCKASSIGNED TO EXAMINER—
May 27, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 26, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance