USPTO serial 79187153
SONSUB
Reviewed by CopyMark Law Group
Reg. 5178659Status 708Renewal
- Filing date
- Status date
- Registration date
- Apr 11, 2017
- Examiner
- VANSTON, KATHY
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with SONSUB?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,097*
Plus Government fees of $1,950
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Holby M. Abern
Holby M. Abern Neal, Gerber & Eisenberg LLP225 West Randolph StreetSuite 2800Chicago, IL 60606Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Power operated tool, namely, manipulators, torque tools, cutting tools, drilling tools, pulling tools, docking tools and hydraulically-powdered skids for use with remotely operated underwater vehicles (ROV); mobile submergible machines for the launch and recovery of ROV; trench cutting machines; trenching systems comprised of cutting machines, ploughs, water jet cutting machines and chain cutting machines; seabed excavation machines and equipment in the nature of trenchers; power operated anti-flooding and sealing tools for underwater pipelines, in particular, for the application of plugs and seals; machines incorporating separators and filters for the processing of subsea oil, water and natural gas; machines and machine tools for handling and repairing subsea pipelines, in particular, cutting tools, coating removal tools, end preparation tools, weld seam removal tools, subsea lifting frames, pipeline handling/alignment frames, machines for connecting pipelines tubes; power operated tools for piping repair incorporating use of metal repair clamps; hydraulically operated skids used in connection with ROV ] | SECTION 71 - CANCELLED | — |
| 009 | [ Electronic remote controllers for ROV; electronic controllers for ROV and remote machines for construction, installation and maintenance of offshore and subsea equipment, infrastructures and plants; software for offshore and subsea applications, namely, software for control and monitoring of offshore and subsea equipment, infrastructures and plants; electronic simulators for offshore and subsea applications for simulating offshore operations for construction, installation and maintenance of offshore and subsea equipment, infrastructures and plants; electronic crane control systems comprised of computer software and hardware and sensors; electronic pipe lay guidance systems comprised of computer hardware and software and sensors; electronic controller for welding machines; offshore and subsea electronic pipe tracking systems comprised of computer hardware and software and sensors; offshore and subsea electronic monitoring systems comprised of computer hardware and software and sensors for trenching and repair of underwater installation ] | SECTION 71 - CANCELLED | — |
| 011 | [ Underwater installations for the decomposition, filtration, purification and washing of hydrocarbons, gas, petroleum or petroleum fractions which have been collected via production process incorporating separation, pumping and compression ] | SECTION 71 - CANCELLED | — |
| 012 | Underwater remotely operated vehicles (ROV) for underwater monitoring, working and inspecting used in connection with petroleum and natural gas production, autonomous underwater vehicles (AUV) for underwater monitoring, working and inspecting | ACTIVE | — |
| 037 | Construction, installation and maintenance of offshore and subsea equipment, infrastructures and plants; [ construction, installation and maintenance of subsea factories and subsea equipment for extracting and processing oil and natural gas; construction, installation and maintenance of offshore equipment, infrastructures and plants for the production of energy; ] ROV maintenance and ROV maintenance services, namely, ROV upgrading; maintenance of subsea machines and equipment, construction and installation of offshore and subsea equipment incorporating trenching, ploughing, burial, deburial and seabed preparation operations; installation and laying of pipelines and construction of subsea installations incorporating use of ROV's; inspection, maintenance and repair services of offshore and subsea equipment, subsea infrastructures and subsea processing plants [ ; removal services, namely, pipeline, platform and subsea structures decommissioning ] | ACTIVE | — |
| 042 | Testing of offshore and subsea equipment, infrastructures and plants; research and development services for offshore and subsea equipment, infrastructures and plants; engineering for subsea factories, subsea infrastructures and plants and related subsea equipment; surveying conducted with using ROVs | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SAIPEM S.P.A.
- Other trademarks owned by SAIPEM S.P.A.
- Other trademarks owned by SAIPEM S.P.A.
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 012
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named SONSUB
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 11, 2026 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Dec 4, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 4, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 4, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 28, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 11, 2025 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jun 6, 2025 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 14, 2025 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Apr 14, 2025 | INPC | INVALIDATION PROCESSED | — |
| Jan 31, 2025 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 31, 2024 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| May 31, 2024 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| May 28, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 10, 2023 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Oct 3, 2023 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Apr 11, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Aug 4, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 19, 2017 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 19, 2017 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 11, 2017 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 19, 2017 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 19, 2017 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Apr 11, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 26, 2017 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 24, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 11, 2017 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 11, 2017 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 4, 2017 | NPUB | NOTICE OF PUBLICATION | — |
| Dec 20, 2016 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 9, 2016 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Dec 9, 2016 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 9, 2016 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 9, 2016 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 30, 2016 | DMCC | DATA MODIFICATION COMPLETED | — |
| Nov 30, 2016 | ALIE | ASSIGNED TO LIE | — |
| Nov 29, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 28, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 28, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 2, 2016 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 14, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 13, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 13, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 10, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 9, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 8, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 8, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 8, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 2, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |