Drawing for ENIOS-GT

USPTO serial 79187165

ENIOS-GT

Reviewed by CopyMark Law Group

Reg. 5356987Status 404
Filing date
Status date
Registration date
Dec 19, 2017
Examiner
LAVACHE, LINDA M
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ENIOS-GT?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Sarah M. Stemer

Sarah M. Stemer Lerner Greenberg Stemer LLP2445 Hollywood BoulevardHollywood, FL 33020UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Railway material, namely, materials of metal for railway construction; metallic materials for railway tracks, namely, toothed racks of metal; fish plates, namely, metal rails; ropes of metal; chains, tension links and clamps of metal; belt stretchers of metal; shims of metal; railway points; wire ropes, in particular telpher cablesSECTION 71 - CANCELLED—
012Parts of cable cars, funicular railcars, chairlifts and ski lifts, namely, pulleys, pulley disks being brake discs, drag rollers, idlers being idler arms, all for aerial ropeways; mobile equipment for cable cars and ski lifts, namely, suspension arms for cable cars, T bars for ski lifts; load cables and pulling ropes specially adapted for cable cars, funicular railcars and ski lifts; pulleys and cable clamps specially adapted for cable cars; vehicle bumpers and vehicle running boards; anti-skid chains for vehicles; non-skid devices for vehicle tires, namely, anti-skid studs and textile covers for vehicle tires; railway bogies for wagons; springs for vehicles, namely, vehicle suspension springs, shock absorbing springs for vehicles; buffers for railway rolling stock; couplings and trailer hitches for land vehicles; vehicle brake segments and vehicle brake linings; brake discs for vehicles; brakes and brake shoes for vehicles; vehicle parts, namely, shock absorbers; torsion bars for vehicles; vehicle suspension springs; treads for vehicles for retreading tires; vehicle parts, namely, windshield wipers; structural parts of land vehicles, namely, sheaves, rails, clamps, rollers, fan belts, chains, pulleys, ropes, hangers, drives, driving chains for land vehicles; vehicle wheel tires and inner tubes for pneumatic tires; pneumatic tiresSECTION 71 - CANCELLED—
017Goods of rubber or plastics, namely, plastic padding for impact protection, rubber hoses for industrial applications; belt stretchers of plastics, namely, flexible tubes of plastic; shock absorbers of rubber, namely, vibration and shock absorbing rubber buffers for industrial machinery; stops of rubber, being clamping mechanisms to stop torque for pulleys, conveyors, belt drivesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 25, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jun 25, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Jun 6, 2025INNTTOTAL INVALIDATION PROCESSED BY THE IB—
May 22, 2025INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 21, 2025INPCINVALIDATION PROCESSED—
Mar 5, 2025INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 5, 2024C71TCANCELLED SECTION 71—
Dec 19, 2022REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 16, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 1, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 11, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 28, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 27, 2018FIMPFINAL DISPOSITION PROCESSED—
Mar 19, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 19, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 1, 2017OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 23, 2017ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Nov 8, 2017OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 8, 2017OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 3, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 3, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 13, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Aug 28, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 9, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 9, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 9, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 18, 2017ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 18, 2017REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 3, 2017CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 30, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 5, 2017RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jun 5, 2017ALIEASSIGNED TO LIE—
Nov 25, 2016CNSLLETTER OF SUSPENSION MAILED—
Nov 23, 2016CNSLSUSPENSION LETTER WRITTEN—
Nov 2, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 2, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 2, 2016TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 2, 2016RFNTREFUSAL PROCESSED BY IB—
Jun 14, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 13, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 13, 2016RFRRREFUSAL PROCESSED BY MPU—
Jun 13, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 12, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 8, 2016DOCKASSIGNED TO EXAMINER—
Jun 8, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 2, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance