USPTO serial 79190986
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Bradley M. Stohry
Bradley M. Stohry Reichel Stohry Dean LLP525 S. Meridian St., Suite 1A2Indianapolis, IN 46225UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and apparatus for generating electricity, namely, solar-powered electricity generators; turbines, not for land vehicles, in particular, vertical axis turbines, horizontal axis turbines; turbines, not for land vehicles, for power generation; pumps, in particular, solar-powered electric pumps, compressed air pumps, water pumps for use in motors and engines; machines in the nature of drives, motors and gears for orientating solar panels; component parts for electric generators and turbines for generating electricity, in particular, towers, masts, housings, casings, cowlings, transmission shafts, universal joints, transmissions, clutches | SECTION 71 - CANCELLED | — |
| 009 | Computer firmware and software for operating apparatus and machines generating electricity; computer hardware, in particular, data processing and data communication apparatus for the use with apparatus and machines generating electricity; blank electronic, digital, optical and magnetic storage media; electronic control and management apparatus, namely, electronic control devices for energy management, in particular for managing the collection and use of energy; apparatus in the nature of electric meters and sensors, in particular for measuring luminescence, frequency, inclination, upward gradient, downward gradient, acceleration, vibration, position, height, magnetic flux density and consumption of sunlight; apparatus in the nature of electric meters and sensors for automatic solar tracking; apparatus for converting solar radiation to electricity, in particular, photovoltaic solar modules, solar panels, solar energy collectors in the nature of photovoltaic cells, solar cells, solar batteries, inverters; apparatus in the nature of electric batteries, accumulators and batteries for storage of electrical energy | SECTION 71 - CANCELLED | — |
| 011 | Solar thermal-based power plants; solar thermal installations, namely, solar thermal modules | SECTION 71 - CANCELLED | — |
| 037 | Erection, installation, servicing, maintenance for control systems for photovoltaic power generation systems; erection, installation, servicing, maintenance and repair of solar power plants, solar power generation systems, solar power collection systems, turbines for power generation, vertical axis turbines, vertical axis machines, horizontal axis turbines, horizontal axis machines, solar powered systems, solar power propulsion systems except for land vehicles, solar powered machines, solar powered turbines, solar thermal installations, components, parts and fittings therefor; consultancy and information in connection with all the aforesaid services | SECTION 71 - CANCELLED | — |
| 040 | Production of electricity from renewable sources; custom manufacture of power plants, power generation systems, solar power collection systems from renewable sources, turbines for power generation, vertical axis turbines, vertical axis machines, horizontal axis turbines, horizontal axis machines, solar powered systems, solar power propulsion systems except for land vehicles, solar powered machines, solar powered turbines, solar thermal installations, components, parts and fittings therefor; consultancy and information in connection with all the aforesaid services | SECTION 71 - CANCELLED | — |
| 042 | Design and development of and scientific research, testing and analysis and technological services, all relating to power plants, power generation systems, power collection systems, turbines for power generation, vertical axis turbines, vertical axis machines, horizontal axis turbines, horizontal axis machines, solar powered systems, solar power propulsion systems except for land vehicles, solar powered machines, solar powered turbines, solar thermal installations, components, parts and fittings therefor; electronic data storage; development of data storage systems; computer software development, programming and implementation; development of systems for the storage of data; installation, maintenance and updating of computer software | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 14, 2024 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 28, 2024 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 28, 2024 | INPC | INVALIDATION PROCESSED | — |
| Aug 16, 2024 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 15, 2023 | C71T | CANCELLED SECTION 71 | — |
| Jul 2, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 22, 2023 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 22, 2023 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 22, 2023 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 22, 2023 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jun 22, 2023 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Apr 22, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 30, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 18, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 28, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 6, 2017 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 6, 2017 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 30, 2017 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 30, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 14, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 14, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 10, 2017 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 22, 2017 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 22, 2017 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 22, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 9, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 29, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 6, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 6, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 6, 2017 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 3, 2017 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 3, 2017 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 3, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 22, 2016 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 22, 2016 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 10, 2016 | ALIE | ASSIGNED TO LIE | — |
| Oct 28, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 23, 2016 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 7, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 7, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 7, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 6, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 6, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 2, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 2, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 1, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |