USPTO serial 79192152
CUBIPOD
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Aug 8, 2017
- Examiner
- YOUNG, THOMAS PAUL
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with CUBIPOD?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $1,300
Owner
SOCIEDAD ANONIMA TRABAJOS Y OBRAS (SATO)
ES
Other trademarks owned by SOCIEDAD ANONIMA TRABAJOS Y OBRAS (SATO)
SOCIEDAD ANONIMA TRABAJOS Y OBRAS (SATO)
Madrid, ES
Other trademarks owned by SOCIEDAD ANONIMA TRABAJOS Y OBRAS (SATO)
SOCIEDAD ANONIMA TRABAJOS Y OBRAS (SATO)
ES
Other trademarks owned by SOCIEDAD ANONIMA TRABAJOS Y OBRAS (SATO)
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Justin R. Young
Justin R. Young DTL Ltd134 N. LaSalle St.Suite 1050Chicago, IL 60602Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction of civil engineering structures, namely, [ bridges, roads, railways, ] ports, [ airports, ] [ dams, and containment dams ] with concrete units; Services for the construction of [ buildings and ] infrastructures, namely, consultancy services in the field of construction, construction management and supervision of construction works, providing information in the field of building and construction of [ bridges, roads, railways, ] ports, [ airports, ] [ dams, containment dams ] [ and bridges, and rental of construction machinery and equipment; Rental of construction and building demolition tools, machines and equipment; Repair and maintenance of buildings and masonry structures, providing information on repair of bridges, roads, railways, ports, airports, [ dams, containment dams, ] and cleaning services for interior and exterior surfaces of buildings ] ; services for installation during the construction of [ bridges, roads, railways, ] ports, [ airports, ] [ dams, containment dams, ] namely, installation of masonry walls and concrete structures | ACTIVE | — |
| 042 | Consultancy and research services in the fields of civil engineering, [ railway system engineering, aeronautical engineering, and naval architecture engineering, namely, ] consultancy and research regarding civil engineering technology, design, and planning; [ Technical project studies, namely, technical research in the fields of environmental protection and quality control ] [ ; Urban planning and consultancy in the field of architecture; Planning of construction projects, namely, planning of buildings and infrastructure systems for buildings; Testing and geological analyses in the nature of conducting geological surveys; Design of engineering building systems, namely, infrastructure systems for buildings; Structural engineering services, namely, analysis of the structural behavior of building materials; Civil engineering research on the construction of buildings or urban planning; Development of computer programs designed for use in construction and engineering; Environmental testing and inspection services, namely, measuring environmental conditions in civil engineering structures; Conducting engineering surveys ] | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SOCIEDAD ANONIMA TRABAJOS Y OBRAS (SATO)
- Other trademarks owned by SOCIEDAD ANONIMA TRABAJOS Y OBRAS (SATO)
- Other trademarks owned by SOCIEDAD ANONIMA TRABAJOS Y OBRAS (SATO)
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named CUBIPOD
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 9, 2026 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Nov 9, 2026 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Oct 19, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 25, 2026 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Aug 8, 2026 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Mar 12, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Apr 17, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 18, 2025 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Feb 14, 2025 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 13, 2025 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Feb 5, 2025 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jan 16, 2025 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Jan 16, 2025 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Dec 18, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 17, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 12, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 5, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 17, 2024 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Apr 17, 2024 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Mar 25, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 17, 2023 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Aug 8, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 29, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 27, 2017 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Nov 27, 2017 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Nov 23, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 8, 2017 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 8, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 23, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 23, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 3, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 10, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 10, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 10, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 10, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 10, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 7, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 7, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 7, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 4, 2016 | RFNP | REFUSAL PROCESSED BY IB | — |
| Oct 14, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 14, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 4, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 3, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 1, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 27, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 27, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 26, 2016 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Sep 22, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |