USPTO serial 79194014
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Claudia W. Stangle
Claudia W. Stangle Leydig, Voit & Mayer, Ltd.180 N. Stetson AveSuite 4900Chicago, IL 60601| Class | Description | Status | First use |
|---|---|---|---|
| 009 | POWER SUPPLY SYSTEMS COMPRISING POWER SUPPLIES, POWER INVERTERS, POWER CABLES, SWITCHING DEVICES AND ELECTRICAL TRANSFORMERS; POWER SUPPLY NETWORKS IN THE NATURE OF ELECTRIC POWER NETWORKS COMPRISING POWER SUPPLIES, POWER SWITCHES AND POWER CONNECTORS FOR DISTRIBUTION OF ELECTRICITY BY ELECTRIC UTILITIES; PHOTOVOLTAIC SOLAR MODULES FOR PRODUCTION OF ELECTRICITY; PHOTOVOLTAIC INSTALLATIONS, NAMELY, PHOTOVOLTAIC CELLS AND MODULES, PHOTOVOLTAIC INVERTERS, PHOTOVOLTAIC SYSTEMS THAT CONVERT SUNLIGHT INTO ELECTRIC AND THERMAL ENERGY; ELECTRICAL TRANSFORMERS, GENERATOR TRANSFORMERS, DISTRIBUTION TRANSFORMERS, POWER TRANSFORMERS, REGULATING TRANSFORMERS, PHASE-SHIFTING TRANSFORMERS, RECTIFIER TRANSFORMERS; ELECTRIC COILS, ELECTRICAL CONDENSERS; ACCUMULATORS; ELECTRIC SWITCHES; ELECTRICAL POWER SWITCHING DEVICES, NAMELY, OFF-CIRCUIT TAP CHANGERS AND ON-LOAD TAP CHANGERS; ELECTRIC SENSORS; COMPUTERS, COMPUTER HARDWARE; COMPUTER SOFTWARE FOR ACTUATING, CONTROLLING, MONITORING AND TESTING ELECTRIC NETWORKS AND ELECTRIC INSTALLATIONS AND FOR SECURING AND IMPROVING THE ENERGY QUALITY OF PUBLIC, PRIVATE, AND INDUSTRIAL POWER SUPPLY SYSTEMS; MEASURING EQUIPMENT, NAMELY, INSTRUMENTS FOR MEASURING TEMPERATURE, PRESSURE, VOLTAGE, AMPERAGE, WATTAGE, ELECTRICAL RESISTANCE, CAPACITANCE, REACTIVE POWER, DISSIPATION FACTOR, POWER FACTOR, PHASE SHIFT AND ELECTRICAL IMPEDANCE; CONTROLLING EQUIPMENT, NAMELY, ELECTRICAL CONTROLLERS, ELECTRIC CONTROL DEVICES FOR ENERGY MANAGEMENT, ELECTRIC CONTROL PANELS; MONITORING EQUIPMENT, NAMELY, ELECTRONIC DEVICES FOR MONITORING UNWANTED GAS PRODUCTION, ENERGY CONSUMPTION AND EXCESSIVE DEVIATIONS IN TEMPERATURE, PRESSURE, VOLTAGE, AMPERAGE, WATTAGE, ELECTRICAL RESISTANCE, CAPACITANCE, REACTIVE POWER, DISSIPATION FACTOR, POWER FACTOR, PHASE SHIFT AND ELECTRICAL IMPEDANCE; INSTALLATIONS AND EQUIPMENT FOR CONDUCTING, DISTRIBUTING, SWITCHING, CONVERTING, STORING, INFLUENCING AND CONTROLLING OF ELECTRICITY, NAMELY, POWER SUPPLY SYSTEMS COMPRISING POWER SUPPLIES, POWER CONNECTORS, ELECTRICITY GRIDS COMPRISING ELECTRIC WIRES AND CABLES, SUBSTATIONS, TRANSFORMERS AND SWITCHES, PHOTOVOLTAIC SOLAR MODULES, PHOTOVOLTAIC INSTALLATIONS COMPRISING PHOTOVOLTAIC SOLAR MODULES FOR PRODUCTION OF ELECTRICITY, ELECTRICAL TRANSFORMERS, ELECTRIC COILS, CAPACITORS, ACCUMULATORS, ELECTRICAL SWITCHING DEVICES, TAP CHANGERS AND ELECTRIC SENSORS; COMPUTER SOFTWARE FOR USE IN OPERATING, CONTROLLING, MONITORING AND CHECKING OF ELECTRICAL INSTALLATIONS, EQUIPMENT AND DEVICES, NAMELY, POWER SUPPLY SYSTEMS, POWER SUPPLY NETWORKS, SOLAR MODULES, PHOTOVOLTAIC INSTALLATIONS, WIND TURBINES, WIND PARKS, ELECTRICAL TRANSFORMERS, ELECTRICAL GENERATORS, ELECTRIC COILS, ELECTRICAL CONDENSERS, ACCUMULATORS, SWITCHING DEVICES, ELECTRIC SENSORS, ELECTRIC MOTORS, DRIVES AND TAP CHANGERS; ELECTRICAL EQUIPMENT, NAMELY, POWER SUPPLY SYSTEMS COMPRISING POWER SUPPLIES, POWER SWITCHES AND POWER CONNECTORS, ELECTRICITY GRIDS COMPRISING ELECTRIC WIRES AND CABLES, SUBSTATIONS, TRANSFORMERS AND SWITCHES, PHOTOVOLTAIC SOLAR MODULES, PHOTOVOLTAIC INSTALLATIONS COMPRISING PHOTOVOLTAIC SOLAR MODULES FOR PRODUCTION OF ELECTRICITY, ELECTRICAL TRANSFORMERS, ELECTRIC COILS, CAPACITORS, ACCUMULATORS, ELECTRICAL SWITCHING DEVICES, TAP CHANGERS AND ELECTRIC SENSORS, ALL FOR USE IN ENSURING AND IMPROVING OF THE POWER QUALITY OF PUBLIC, PRIVATE AND INDUSTRIAL POWER SUPPLY SYSTEMS AND POWER SUPPLY NETWORKS, IN POWER FACTOR CORRECTION BY MEANS OF ELECTRIC COILS AND ELECTRICAL CONDENSERS AND IN UNINTERRUPTIBLE POWER SUPPLY; COMPUTER SOFTWARE FOR MONITORING AND CONTROL OF ELECTRICAL GENERATORS, POWER SUPPLY SYSTEMS, ELECTRICITY GRIDS, PHOTOVOLTAIC SOLAR MODULES, PHOTOVOLTAIC INSTALLATIONS, ELECTRICAL TRANSFORMERS, ELECTRIC COILS, CAPACITORS, ACCUMULATORS, ELECTRICAL SWITCHING DEVICES, TAP CHANGERS AND ELECTRIC SENSORS, ALL FOR USE IN ENSURING AND IMPROVING OF THE POWER QUALITY OF PUBLIC, PRIVATE AND INDUSTRIAL POWER SUPPLY SYSTEMS AND POWER SUPPLY NETWORKS, IN POWER FACTOR CORRECTION BY MEANS OF ELECTRIC COILS AND ELECTRICAL CONDENSERS AND IN UNINTERRUPTIBLE POWER SUPPLY; ELECTRIC SENSORS FOR DETECTION AND MEASUREMENT OF TEMPERATURE, FILLING LEVEL, FLOW, SPEED, ACCELERATION, MECHANICAL TENSION, DEFORMATION, BENDING, ELONGATION, SHEAR, TORSION, PRESSURE, MOISTURE, SURFACE WAVES, SOUND, VIBRATIONS, ELECTROMAGNETIC RADIATION, LIGHT, MICROWAVES, ELECTRIC CURRENT, ELECTRIC VOLTAGE, ELECTRIC ENERGY, ELECTRIC POWER, ELECTRIC IMPEDANCE, ELECTRIC POWER FACTOR, PHASE SHIFT AND DISSOLVED GAS CONCENTRATION; COMPUTER HARDWARE AND COMPUTER SOFTWARE FOR EVALUATING AND VISUALISING OF DATA, INFORMATION AND SIGNALS AND FOR CONTROLLING OF INDUSTRIAL PROCESSES; STRUCTURAL COMPONENTS PARTS AND COMPONENT ASSEMBLIES FOR THE AFORESAID GOODS | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 24, 2026 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Aug 20, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 6, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 18, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 14, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| May 1, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 1, 2026 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| May 1, 2026 | EWOR | TEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED | — |
| May 1, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 1, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 1, 2026 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| May 1, 2026 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Dec 21, 2024 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Dec 21, 2024 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Dec 20, 2024 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Oct 7, 2024 | PR75 | POST REGISTRATION ACTION MAILED - SEC. 71 & 15 | — |
| Oct 7, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 12, 2024 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jan 27, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 20, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 10, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 30, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 2, 2018 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Sep 7, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 7, 2018 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 22, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 22, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 20, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 20, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 19, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 5, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 5, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 22, 2017 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 22, 2017 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 15, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 31, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 6, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 6, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 6, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 17, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 17, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 18, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 18, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 16, 2017 | ALIE | ASSIGNED TO LIE | — |
| Feb 3, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 25, 2016 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 7, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 7, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 7, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 6, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 25, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 21, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 21, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 20, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |