Drawing for INTENERGY

USPTO serial 79194541

INTENERGY

Reviewed by CopyMark Law Group

Reg. 5278831Status 707Renewal
Filing date
Status date
Registration date
Sep 5, 2017
Examiner
PARK, JENNY K
Law office
—

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with INTENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $299*

Plus Government fees of $650

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Prakash NAMA

121 Moore StPrinceton, NJ 08540UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009[ Electricity distribution consoles; electrical distribution boxes; electricity cell switches; electricity inverters; integrated circuits chips; silicon epitaxial slice, namely, silicon epitaxial wafers; polycrystalline silicon, namely, polycrystalline silicon chips; semiconductor device, namely, semiconductor devices used to provide a fixed voltage drop over a wide range of current; electricity junction boxes; ] monocrystalline silicon, namely, monocrystalline silicon chips; [ distribution device for high voltage explosion protection, namely, circuit overload protector device; power station automatization installation, namely, transformers; lightning arresters; chargers for electric batteries; galvanic cells; electric accumulators; ] solar batteriesACTIVE—
011[ Lighting apparatus for vehicles; lighting apparatus and installations; gas lighters, namely, utility lighters for lighting grills, fireplaces and candles; electric cooking utensils, namely, baking ovens; solar furnaces; air conditioning installations; solar collectors for heating; solar water heater; heaters for baths; pocket warmers, namely, non-electric chemically, activated heating packets for warming hands ]SECTION 71 - CANCELLED—
019[ Gypsum board; concrete building elements, namely, concrete blocks, bricks, posts, slabs and panels; refractory construction materials, not of metal; floors, not of metal; building materials, not of metal, namely, wall, hardwood, decking, wood, particle boards; illuminant paving blocks, not of metal; roofing, not of metal, incorporating solar cells; prefabricated buildings, not of metal; building glass; building materials, namely, coatings of tar coatings for use on roofs, walls and pavement ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 5, 2026REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Sep 5, 2026REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Sep 5, 2026REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
May 14, 2026RNWLINTERNATIONAL REGISTRATION RENEWED—
Apr 19, 2025INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Mar 1, 2025INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Feb 27, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Feb 26, 2025XXCRGENERIC MADRID TRANSACTION CREATED—
Dec 24, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 23, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 23, 2024NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Apr 23, 202471.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Apr 23, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 29, 2023ES71TEAS SECTION 71 RECEIVED—
May 28, 2021CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jan 26, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 16, 2017FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 15, 2017FIMPFINAL DISPOSITION PROCESSED—
Dec 5, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 17, 2017CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Oct 13, 2017CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Sep 5, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 20, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 31, 2017NPUBNOTICE OF PUBLICATION—
May 10, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 9, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 8, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 8, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 25, 2016RFNTREFUSAL PROCESSED BY IB—
Nov 10, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 10, 2016RFRRREFUSAL PROCESSED BY MPU—
Nov 8, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 7, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 4, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 31, 2016DOCKASSIGNED TO EXAMINER—
Oct 31, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 27, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance