USPTO serial 79194552
ECOTAP
Reviewed by CopyMark Law Group
Reg. 5215810Status 739Renewal
- Filing date
- Status date
- Registration date
- Jun 6, 2017
- Examiner
- CORNWELL, ANDREA B
- Law office
- Historical data usage
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with ECOTAP?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*
Plus Government fees of $650
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Klaus P. Stoffel
Klaus P. Stoffel Lucas & Mercanti, LLP100 South Jefferson RoadSuite 202Whippany, NJ 07981Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | [ power supply systems comprised of power supplies, inverters for power supplies; ] electricity grids in the nature of apparatus and instruments for distributing electric current, for use by electric utilities; [ photovoltaic solar modules for production of electricity; ] [ photovoltaic installations, namely, photovoltaic cells and modules, photovoltaic inverters, photovoltaic systems that convert sunlight into electric and thermal energy; ] [ electrical transformers, generator transformers, distribution transformers, power transformers, regulating transformers, phase- shifting transformers, rectifier transformers; electrical coils, capacitors; accumulators; switching devices, namely, high-frequency switching power supplies, electrical switches; ] [ off-circuit tap changers for electrical power transformers, on-load tap changers for electrical power transformers; ] computers, computer hardware; computer software for actuating, controlling, monitoring and testing electric networks and electric installations and for securing and improving the energy quality of public, private, and industrial power supply systems; measuring equipment, namely, instruments for measuring temperature, pressure, voltage, amperage, wattage, electrical resistance, capacitance, electrical impedance; controlling equipment, namely, electrical controllers, electric control devices for energy management, electric control panels; [ monitoring equipment, namely, electronic devices for monitoring unwanted gas production and energy consumption; ] apparatus and instruments in the nature of installations, equipment and computer software for conducting, distributing, switching, converting, storing, and controlling of electric current, namely, electrical generators, power supply systems, electricity grids, photovoltaic solar modules, photovoltaic installations, electrical transformers, electrical coils, capacitors, accumulators, electrical switching devices, on-load tap changers, and electric sensors; installations and equipment, namely, electrical controllers, electrical sensors, monitoring devices, and computer software, all for influencing, operating, controlling, monitoring and checking of drives, electric motors, wind turbines, wind parks, electrical generators, and technical and electrical installations, equipment and devices in the nature of power supply systems, electricity grids, photovoltaic solar modules, photovoltaic installations, electrical transformers, electrical coils, capacitors, accumulators, electrical switching devices, on-load tap changers, off-circuit tap changers, and electric sensors; installations, equipment and computer software for ensuring and improving of the power quality of public, private and industrial power supply systems and electricity grids, namely, sensors for measuring electricity distribution, electrical controllers; [ installations, equipment and computer software for power factor correction by means of electrical coils and/or capacitors, and for uninterruptible power supply, namely, electric power converters, electrical power distribution panels, inverters for power supply; sensors for detecting and measuring temperature, filling level, flow, speed, acceleration, mechanical tension, deformation, bending, elongation, shear, torsion, pressure, moisture, surface waves, sound, vibrations, electromagnetic radiation, light, microwaves, electric current, electric voltage, electric energy, electric power, electric impedance, electric power factor, phase shift and dissolved gas analysis; ] computer hardware and computer software for evaluating and visualising of data, information and signals, and for controlling of industrial processes [ ; structural component parts and component assemblies for the aforesaid goods ] | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by REINHAUSEN GMBH
- Other trademarks owned by Maschinenfabrik Reinhausen GmbH
- Other trademarks owned by Maschinenfabrik Reinhausen GmbH
- Other trademarks owned by Maschinenfabrik Reinhausen GmbH
- Other trademarks in Class 009
- Similar marks named ECOTAP
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 29, 2026 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Oct 22, 2026 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Sep 24, 2026 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Aug 20, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 6, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 25, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jun 18, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 6, 2026 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Feb 26, 2026 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 9, 2026 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 9, 2026 | INPC | INVALIDATION PROCESSED | — |
| Jan 7, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 7, 2026 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jan 7, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 7, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 6, 2025 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 6, 2024 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Dec 6, 2024 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Dec 5, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 19, 2024 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jan 27, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 29, 2023 | PUM2 | OFFICE ACTION ISSUED POU2 | — |
| Dec 20, 2023 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jun 26, 2023 | PUM1 | OFFICE ACTION ISSUED POU1 | — |
| Jun 24, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 5, 2023 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jun 6, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 10, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 10, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 28, 2017 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 14, 2017 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 14, 2017 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 6, 2017 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 6, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 21, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 21, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 1, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 13, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 3, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 3, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 3, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 3, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 3, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 27, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 27, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 19, 2017 | ALIE | ASSIGNED TO LIE | — |
| Dec 23, 2016 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 25, 2016 | RFNP | REFUSAL PROCESSED BY IB | — |
| Nov 4, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 4, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 4, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 3, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 2, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 31, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 31, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 27, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |