Drawing for MATEST

USPTO serial 79196147

MATEST

Reviewed by CopyMark Law Group

Reg. 5331957Status 739Renewal
Filing date
Status date
Registration date
Nov 14, 2017
Examiner
SWAIN, MICHELE LYNN
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with MATEST?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

N. Alexander Nolte

N. Alexander Nolte Nolte Lackenbach Siegel111 Brook Street, Suite 101SCARSDALE, NY 10583UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Testing and quality control devices, material testing apparatus, material testing instruments and machines, all the foregoing being computers and testers for concrete; concrete testing machines; cement testing machines; earth testers; soil moisture meters; steel tape measures; lever scales being steelyards; steelyards lever scales; lever scales steelyards; steel rules for measuring [ ; computer software for computer aided software engineering; computer hardware for use in computer-assisted software engineering; metal compression testing machines; software to control building environmental, access and security systems; electronic access control system for buildings ]ACTIVE—
042[ Design, development and implementation of testing and quality control devices; design, development and implementation of material testing apparatus; design, development and implementation of material testing instruments and machines; design, development and implementation of testers for concrete; design, development and implementation of concrete testing machines; design, development and implementation of cement testing machines; design, development and implementation of earth testers; design, development and implementation of soil moisture meters; design, development and implementation of steel tape measures; design, development and implementation of lever scales being steelyards; design, development and implementation of steelyards lever scales; design, development and implementation of lever scales steelyards; design, development and implementation of steel rules for measuring; design, development and implementation of computer software for computer aided software engineering; design, development and implementation of computer hardware for use in computer-assisted software engineering; design, development and implementation of metal compression testing machines; design, development and implementation of software to control building environmental, access and security systems; design, development and implementation of electronic access control system for buildings; ] calibration services; calibration measuring; calibration of instruments; calibration of machines; maintenance and repair of computer software for computer aided software engineering [ ; maintenance and repair of software to control building environmental, access and security systems ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 12, 2026RNWLINTERNATIONAL REGISTRATION RENEWED—
Jul 26, 2025INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jul 7, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Jul 7, 2025INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jul 7, 2025XXCRGENERIC MADRID TRANSACTION CREATED—
Jul 7, 2025INPCINVALIDATION PROCESSED—
Apr 8, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 8, 2024NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Aug 8, 2024C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jul 30, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 10, 2023ES75TEAS SECTION 71 & 15 RECEIVED—
Nov 14, 2022REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 20, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 26, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 26, 2018FIMPFINAL DISPOSITION PROCESSED—
Feb 14, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 14, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 29, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 29, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 9, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 20, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 12, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Jul 12, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 12, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 12, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 23, 2017DOCKASSIGNED TO EXAMINER—
Jun 23, 2017DOCKASSIGNED TO EXAMINER—
Jun 22, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 22, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 15, 2017ALIEASSIGNED TO LIE—
May 23, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 11, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 17, 2016RFNTREFUSAL PROCESSED BY IB—
Nov 30, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 30, 2016RFRRREFUSAL PROCESSED BY MPU—
Nov 29, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 28, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 22, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 18, 2016DOCKASSIGNED TO EXAMINER—
Nov 18, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 17, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance