USPTO serial 79196642
STONEKIT
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Feb 13, 2018
- Examiner
- MURRAY, DAVID T
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with STONEKIT?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
STONEKIT, Société à Responsabilité Limitée
HERIMONCOURT, FR
Other trademarks owned by STONEKIT, Société à Responsabilité Limitée
STONEKIT, Société à Responsabilité Limitée
HERIMONCOURT, FR
Other trademarks owned by STONEKIT, Société à Responsabilité Limitée
STONEKIT, Société à Responsabilité Limitée
HERIMONCOURT, FR
Other trademarks owned by STONEKIT, Société à Responsabilité Limitée
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
C. ANDREW IM
C. ANDREW IM IM IP LAW2146 ORCHARD MIST STLAS VEGAS, NV 89135-1562UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building materials of metal, namely, metal wall panels; transportable buildings of metal; non-electric cables and wires of common metal; buildings, non-transportable, of metal; gabions of metal; decorative metal gabions; metal gabions for landscaping; modular metal gabions; metal wire gabions for landscaping that are filled with pebbles, stones, wood, glass, plants; metal cages for landscaping that are filled with pebbles, stones, wood, glass, plants; metal gabions for retaining walls; metal retaining walls formed of metal gabions; metal anti-noise wall panels combined with plants and minerals; metal pergolas and metal wall panels that are filled with stones, plants; wire mesh wall panels; metal wall panels used as decorations and acoustic screens; metal display columns, namely, pre-fabricated metal architectural columns; monuments of non-precious metal; works of art of common metal; statues or figurines of common metal; metal storm water dry wells consisting of metal gabions; metal facades for building construction purposes; fences of metal; gabion fences of steel wire | SECTION 71 - CANCELLED | — |
| 019 | Building materials not of metal, namely, non-metal wall panels; non-metallic transportable buildings; monuments not of metal; buildings, non-transportable, not of metal; non-metallic cages for landscaping purposes that are filled with pebbles, stones, wood, glass, plants; non-metallic gabions; non-metallic gabions for retaining walls that are filled with plants and minerals; non-metallic gabions for anti-noise walls that are filled with plants and minerals; non-metal pergolas and non-metal wall panels that are filled with stones, plants; non-metallic display columns, namely, display wood columns, display concrete columns; monuments not of metal; non-metallic facades for construction purposes; fences, not of metal; non-metallic lattice panels; scaffolding, not of metal; building glass; insulating glass for buildings; concrete; cement; works of art made of stone, concrete or marble; statues or figurines of stone, concrete or marble; stained-glass windows; lumber; manufactured timber; construction material, namely, stone; stone roofing tiles; paving blocks, not of metal | SECTION 71 - CANCELLED | — |
| 020 | Metal or non-metal street furniture, namely, benches, seats, flower-stands; furniture, namely, non-metallic screens | SECTION 71 - CANCELLED | — |
| 037 | Building construction; building construction information; construction consultancy; supervision, namely, management of construction work in the field of modular gabions; construction of retaining walls, partition walls, river banks, embankments; installation of works of art in buildings; building construction services, namely, reinforcement of walls in buildings, river banks, embankments; masonry; plastering; installation of building insulation; building demolition services; rental of construction equipment | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by STONEKIT, Société à Responsabilité Limitée
- Other trademarks owned by STONEKIT, Société à Responsabilité Limitée
- Other trademarks owned by STONEKIT, Société à Responsabilité Limitée
- Other trademarks in Class 006
- Other trademarks in Class 019
- Other trademarks in Class 020
- Other trademarks in Class 037
- Similar marks named STONEKIT
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 14, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 3, 2025 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 14, 2025 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Aug 14, 2025 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Apr 30, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 30, 2024 | C71T | CANCELLED SECTION 71 | — |
| Feb 13, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Aug 3, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 22, 2018 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| May 22, 2018 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| May 13, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 13, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 7, 2018 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Sep 7, 2017 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Aug 29, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 29, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 9, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 26, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 26, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jul 26, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jul 26, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jul 26, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 18, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 18, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 16, 2017 | ALIE | ASSIGNED TO LIE | — |
| Jun 6, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 6, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 24, 2016 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 8, 2016 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 8, 2016 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 2, 2016 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 29, 2016 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 28, 2016 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 28, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 28, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 24, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |