Drawing for SOLARTIME

USPTO serial 79196674

SOLARTIME

Reviewed by CopyMark Law Group

Reg. 5293479Status 404
Filing date
Status date
Registration date
Sep 26, 2017
Examiner
EBAUGH, MICHAEL
Law office
Historical data usage

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SOLARTIME?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Grady K. Bergen

Grady K. Bergen Griggs Bergen LLP5001 Spring Valley RoadSuite 1175EDallas, TX 75244

Goods and services

ClassDescriptionStatusFirst use
009[ Electrical adapters; batteries, electric batteries; solar batteries; solar batteries for domestic use; solar batteries for industrial use; solar-powered rechargeable batteries; electronic sensors for measuring solar radiation; electronic entry systems comprised of microprocessors, electronic signal receiver and keyfob with electronic signal transponder; photovoltaic inverters for production of electricity; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; portable solar panels for generating electricity; ducts, namely, electrical ducts; photovoltaic installations for generating electricity; electrical cells and batteries; calibrated photovoltaic reference cells; photovoltaic cells; solar energy collectors for electricity generation; photovoltaic solar modules, namely, for production of electricity; photovoltaic modules; solar cells; solar cells for electricity generation; solar wafers; solar panels for the production of electricity; portable solar panels for the production of electricity; photovoltaic apparatus for converting solar radiation to electrical energy, namely, photovoltaic thermal module; electricity storage apparatus, namely, solar batteries and batteries; photovoltaic apparatus and installations for generating solar electricity, namely, solar thermal and electric receivers; ] battery boxes [ ; junction boxes; electric fuse boxes; terminal boxes for electric conductors ]SECTION 70 - CANCELLED—
011[ Heating elements; solar energy powered heating installations; solar thermal collectors for heating and water heating; evacuated heat pipe for solar collectors being heat exchangers; solar powered lamps; supports adapted for use with solar heating tubes; solar water heaters; thermal solar collectors; sunlight collecting apparatus for heating purposes; thermal storage instruments for storing solar energy for heating, namely, water tanks for heat storage; heating installations; heating units for residential and industrial purposes ]SECTION 71 - CANCELLED—
036Consultancy concerning financing of energy projects; financial consultancy in the energy sectorSECTION 70 - CANCELLED—
037Installation of solar heating systems; installation of solar powered systems; installation of photovoltaic cells and modules; installation of power generating apparatus; maintenance, repair and reconditioning of photovoltaic apparatus and installations; installation and maintenance of solar thermal installations; installation and maintenance of photovoltaic installations; maintenance and repair of energy generating installationsSECTION 70 - CANCELLED—
040Production of energy by power plants; energy production; generation of power; leasing of energy generating equipment; generation of electricity from solar energy; rental of power-generating equipment; production of electrical power from renewable sourcesSECTION 70 - CANCELLED—
042Technological analysis relating to energy and power needs of others; energy auditing; research in the field of energy; certification services, namely, analysis and evaluation of the energy efficiency of buildings; consultancy in the field of energy-saving; technological consultancy in the fields of energy production and use; advisory services relating to the use of energy, namely, technical consulting in the field of energy use; design and development of software for control, regulation and monitoring of solar energy systems; professional consultancy relating to energy efficiency in buildings, namely, technical consulting in the field of energy efficiency in buildings [ ; programming of energy management software for others; computer programming for the energy ]SECTION 70 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 29, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Oct 29, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Sep 26, 2026REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Feb 26, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Dec 31, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Dec 31, 2025XXCRGENERIC MADRID TRANSACTION CREATED—
Jul 7, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 7, 2024NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Nov 7, 2024C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Nov 4, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 11, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Sep 26, 2022REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 9, 2021DCPNCHANGE OF OWNER RECEIVED FROM IB—
Feb 16, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jan 17, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jan 17, 2018FIMPFINAL DISPOSITION PROCESSED—
Dec 26, 2017FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 26, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 11, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 11, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 21, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 6, 2017PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 22, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 18, 2017XAECEXAMINER'S AMENDMENT ENTERED—
May 18, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 18, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
May 18, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 28, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 28, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 20, 2017ALIEASSIGNED TO LIE—
Apr 6, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 28, 2017ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 28, 2017REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 24, 2016RFNTREFUSAL PROCESSED BY IB—
Dec 6, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 6, 2016RFRRREFUSAL PROCESSED BY MPU—
Dec 6, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 5, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 3, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 29, 2016DOCKASSIGNED TO EXAMINER—
Nov 29, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 24, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance