Drawing for OWACLIQ

USPTO serial 79197262

OWACLIQ

Reviewed by CopyMark Law Group

Reg. 5440344Status 706Registered
Filing date
Status date
Registration date
Apr 10, 2018
Examiner
O'BRIEN, JENNIFER LYNN
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with OWACLIQ?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James C. Watson

James C. Watson Traskbritt, P.C.230 South 500 East, #300Salt Lake City, UT 84102United States

Goods and services

ClassDescriptionStatusFirst use
006Construction materials, namely, ceiling [ and partition wall ] systems of metal for the construction sector and components of metal therefor, consisting predominantly of suspension devices in the nature of metal cable wire or steel wire rope, support strips in the nature of all-purpose metal straps, metal support straps or ceiling supports of metal, metal clamps in the nature of clamping strips and profile strips for arranging devices on and in walls, ceilings and other surfaces, cross-connectors in the nature of tension links of metal, structural joint connectors of metal or metal pipe connectors, springs in the nature of metal hardware, hooks, dowels, wires of common metal, wire rope [ , and ceiling and wall panels ] ; Frames of metal for building, namely, frame structures of metal for building; spacers being building elements made of metal in the nature of metal spacer brackets and metal spacer profiles for arranging devices on and in walls, ceilings and other surfaces; building structures of metal, namely, building wall framing made primarily of metal; retaining, fixing devices of metal for walls and ceilings, namely, metal expansion joints, suspension clamps, cross connectors in the nature of tension links of metal, structural joint connectors of metal or metal pipe connectors, hooks, plugs, dowels, wires and wire ropes; [ internal wall cladding of metal for building; ] ironmongery of metal for building, namely, metal angle plates, perforated metal plates, metal support strips in the nature of all-purpose metal straps, metal support straps or ceiling supports of metal, metal clamps in the nature of metal clamping strips and metal profile strips for arranging devices on and in walls, ceilings and other surfaces; metal clips for general use; profiles made of metal in the nature of metal profiles for arranging devices on and in walls, ceilings and other surfaces; structural frames of metal for building; metal rails; supporting structure of metal for ceilings in the nature of ceiling supports of metal; pre-fabricated metal constructions, namely, pre-fabricated frames of metal for building for suspended ceiling systems; [ ceiling and wall panels of metal; Building panels of metal, namely, acoustic panels of metal for ceilings and walls; Building panels of metal, namely, fireproof panels of metal; Aluminum-coated ceiling and wall elements, namely, aluminum coated ceiling and wall panels; Ceiling elements in the nature of metal ceiling panels and metal ceiling tiles; ] ceiling components in the nature of ceiling supports of metal [ and metal coverings for ceilings ] ; [ Ceiling cladding of metal for building; Wall elements in the nature of wall panels of metal and wall linings of metal for building; Wall components in the nature of metal wall tiles; Wall cladding of metal for building; Wall panels of metal for building, namely, partition walls and room dividers of metal; ] Metal suspended ceiling systems comprising metal framework; Ceilings of metal in the nature of metal framework [ and metal ceiling panels supported by said metal framework ] ; all of the aforesaid goods consisting wholly or predominantly of metal, optionally in combination with non-metallic materials; all the aforesaid goods being in particular for the fitting-out of buildingsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 12, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jan 31, 2026INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Jan 13, 2026INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jan 13, 2026INPCINVALIDATION PROCESSED—
Aug 12, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 20, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 12, 2024NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Dec 12, 202471AGREGISTERED-SEC.71 ACCEPTED—
Dec 10, 2024EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Nov 20, 2024PR71POST REGISTRATION ACTION MAILED - SEC.71—
Nov 18, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 28, 2024ES71TEAS SECTION 71 RECEIVED—
Mar 27, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 24, 2021CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Mar 24, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 24, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 24, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 24, 2021COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Aug 24, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 28, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 28, 2018FIMPFINAL DISPOSITION PROCESSED—
Jul 10, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 10, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 23, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 19, 2018GPNXNOTIFICATION PROCESSED BY IB—
Jan 3, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 3, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 3, 2018NPUBNOTICE OF PUBLICATION—
Dec 14, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 21, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 21, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 21, 2017MAILPAPER RECEIVED—
Sep 29, 2017RFNPREFUSAL PROCESSED BY IB—
Aug 18, 2017CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 25, 2017ACECAMENDMENT FROM APPLICANT ENTERED—
Jul 25, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 20, 2017ALIEASSIGNED TO LIE—
Jun 14, 2017MAILPAPER RECEIVED—
Feb 24, 2017RFNTREFUSAL PROCESSED BY IB—
Feb 7, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 6, 2017RFRRREFUSAL PROCESSED BY MPU—
Feb 4, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 3, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 26, 2017DOCKASSIGNED TO EXAMINER—
Dec 9, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 5, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 1, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance