Drawing for Q

USPTO serial 79197711

Q

Reviewed by CopyMark Law Group

Reg. 5455560Status 404
Filing date
Status date
Registration date
May 1, 2018
Examiner
EINSTEIN, MATTHEW T
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with Q?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Kazuyo Morita

Kazuyo Morita Holland & Hart LLPP.O. Box 8749Attn: Trademark DocketingDenver, CO 80201

Goods and services

ClassDescriptionStatusFirst use
006metal materials for building or construction, namely, building boards of metal, building panels of metal, cladding of metal for construction and building, linings of metal for building purposes, metal reinforcement materials for building; metal reinforcement for beams used in buildings in the nature of through hole metal reinforcements; floor panels of metal; metal vibration dampers for building; elastic metal column bases used in the concrete covered elastic fixed column base method; metal reinforcement materials for column bases in steel structures in the nature of exposed fixed-base columns for improved seismic resiliency; metal reinforcement materials for beam-to-column connections in the nature of braces for improved seismic resiliency; metal pile-top connections for use in connecting steel beams for improved seismic resiliency; metal diaphragms for beam-to-column connections; metal chains for load handlingSECTION 71 - CANCELLED—
007transmissions for machines; transmission chains, other than for land vehicles; cam sprockets, other than for land vehicles; driving chains, other than for land vehicles; roller chains being part of machine elements not for land vehicles; machine elements not for land vehicles; shafts, axles or spindles not for land vehicles; shaft bearings being machine elements not for land vehicles; shaft couplings or connectors being machine elements not for land vehicles; shock absorbers being machine elements not for land vehicles; chain for scraping sludge machine elements; driving chains for wastewater and sewage treatment installations, other than for land vehicles; seismic control devices for buildings in the nature of passive hydraulic vibration control dampers through-hole steel beam reinforcements, exposed fixed column bases, column caps and column braces all to improve seismic reliency of steel structures in buildings; seismic isolation devices for buildings in the nature of passive hydraulic vibration dampers incorporated into steel structures to isolate and resist seismic movement; seismic control dampers for buildings which use hydraulic and oil hydraulic shock absorber technology; seismic isolation dampers for buildings which use hydraulic and oil hydraulic shock absorber technology; oil dampers made out of metal; conveyance instrument for machining center tools; chain conveyors; chains for parking structures parts of machines; escalator chains being parts of machines; elevator chains being parts of machinesSECTION 71 - CANCELLED—
009generating device powered by solar cells in the nature of photovoltaic solar modules; solar panels for the production of electricity; solar cell modules for power generationSECTION 71 - CANCELLED—
019building panels, not of metal; water-resistant roofing panels, not of metal; material exclusively for construction using mainly synthetic resins or materials made therefrom, namely, non-metal flooring materials, synthetic resins used in the manufacture of plastic moulding compounds, resins in extruded form for general industrial use , finish plasters made of coloured artificial resin, resins in bars, blocks, pellets, rods, sheets and tubes for general industrial use; building materials made of linoleum for fixing to existing walls or floors; plastic building materials, namely, plastic sheets, plastic drywall corner beads, plastic floor panels, plastic in bars, blocks, pellets, rods, sheets, tubes or extruded form for general industrial or manufacturing use, plastic rods and bars; base material for planting and growing plants, for building, namely multi-layer water conservation textiles; building materials, namely, vegetation mats for planting and growing plants, for buildingSECTION 71 - CANCELLED—
027carpet tilesSECTION 71 - CANCELLED—
037construction of buildings, steel supports for buildings, seismic-resilient buildings, steel columns using concrete-covered elastic fixed column bases, through hold reinforcements for steel beams used in buildings, exposed fixed-base columns, steel braces, vibration dampers for absorbing seismic movements, and installation of floor panels; installation, maintenance, and repair of seismic isolation devices and seismic control devices; installation, repair, or maintenance of solar generating apparatusSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 24, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Sep 24, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Jan 22, 2026INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jan 2, 2026INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jan 2, 2026INPCINVALIDATION PROCESSED—
Jul 15, 2025INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 15, 2024C71TCANCELLED SECTION 71—
May 1, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 4, 2020ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Sep 7, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 8, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 8, 2018FIMPFINAL DISPOSITION PROCESSED—
Aug 1, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 1, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 13, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 13, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 24, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 28, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 7, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 7, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 7, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 17, 2017GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2017GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 9, 2017ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 11, 2017PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 22, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 21, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 21, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 21, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 12, 2017RFNTREFUSAL PROCESSED BY IB—
Dec 23, 2016RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 22, 2016RFRRREFUSAL PROCESSED BY MPU—
Dec 20, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 20, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 19, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 16, 2016DOCKASSIGNED TO EXAMINER—
Dec 16, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 8, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance