Drawing for VESTAS ACTIVE DAMPING

USPTO serial 79198331

VESTAS ACTIVE DAMPING

Reviewed by CopyMark Law Group

Reg. 5343245Status 709
Filing date
Status date
Registration date
Nov 28, 2017
Examiner
ROSENBLATT, ANNA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with VESTAS ACTIVE DAMPING?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Wind mills, wind power plants, wind turbines; wind-operated machines namely, wind-powered electricity generators; parts and accessories for the aforesaid goods; mill towers and masts, blades, blade hubs, mill housings, dampers, namely non-electrical side-side tower dampers, machine beds, rotation devices, yaw rings and gears, devices for setting the pitch of the wings, brakes and brake devices in the nature of brake linings, brake pads and block brakes, main shafts, universal joints, transmission devices in the nature of transmission gears, transmissions chains and transmissions shafts, clutches and electric generators and reserve power supply plants; side to side tower damper control systems for the purpose of reducing side-side movements of towers for wind turbines; structural parts and fittings for all the aforesaid goodsSECTION 71 - CANCELLED—
009Electrical, electronic and computer equipment for wind mills, wind power plants, wind turbines and other wind-operated machines namely control, operation, protection and surveillance equipment for wind turbines, wind power plants and wind mills as well as equipment for collecting and processing data from wind power plants and wind turbines; control and monitoring equipment in the nature of electrical controllers and electric monitors for automatically turning on or off the generator and for automatic starting after public power line break-downs and apparatus for overvoltage protection against strokes of lightning.; microprocessor equipment for controlling and monitoring constant voltage, frequency, phase conditions, rotor speed, efficiency and thickness of brake pads, temperature, wind direction and wind speed; accelerometer for measuring nacelle motions; electrical vibration sensors for installation in mill housings; electronical side-side tower dampers and side-side damper control systems, consisting of an accelerometer for measuring nacelle motions and watt-hour meters; computer hardware and computer software for operating, controlling and monitoring side-side tower dampers for wind turbines; parts and fittings for all the aforesaid goodsSECTION 71 - CANCELLED—
037Erection, construction, installation, maintenance and repair of wind mills, wind power plants, wind turbines and side-side tower dampers; advisory, consultancy and information services relating to all the aforesaid services and advisory and consultancy on construction of wind energy facilities, namely, site conditions and the effects of adding an active side-side tower damper to wind turbines being either existing turbines or turbines part of a project for a specific siteSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 16, 2025INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Apr 30, 2025INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 30, 2025INPCINVALIDATION PROCESSED—
Feb 14, 2025INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 14, 2024C71TCANCELLED SECTION 71—
Nov 28, 2022REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 27, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 13, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 13, 2018FIMPFINAL DISPOSITION PROCESSED—
Feb 28, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 28, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 12, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 12, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 23, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 28, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 28, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Jul 28, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 28, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 28, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 11, 2017TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 11, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 11, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 11, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 11, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 27, 2017RFNTREFUSAL PROCESSED BY IB—
Jan 11, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 11, 2017RFRRREFUSAL PROCESSED BY MPU—
Dec 29, 2016RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 28, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 27, 2016MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 21, 2016DOCKASSIGNED TO EXAMINER—
Dec 21, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 15, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance