USPTO serial 79198880
LET'S BUILD CONFIDENCE
Reviewed by CopyMark Law Group
Reg. 5483043Status 404
- Filing date
- Status date
- Registration date
- Jun 5, 2018
- Examiner
- SIRIGNANO, EMMA MARIE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with LET'S BUILD CONFIDENCE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Robert A. Becker
Robert A. Becker Fross Zelnick Lehrman & Zissu, P.C.4 Times Square, 17th FloorNew York, NY 10036UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Pipes and tubes of metal; metal waste pipes, metal gutters, metal roof guttering and inspection chambers being metallic drain traps and metal rings therefor; metallic foils, metal plates and metal wire mesh for the installation of floors, heating elements and snow and ice removal systems | SECTION 71 - CANCELLED | — |
| 007 | Machine tools for installation of tap water systems, floor and radiator heating systems, cooling systems, district heating systems, sewer systems, drainage systems and liquid waste management systems, namely, band saws and electric butt welding machines; metalworking machines | SECTION 71 - CANCELLED | — |
| 008 | Hand-operated plumbing snakes, pipe wrenches, rigid and rod hand benders for use on pipes and conduits, wire crimpers, wrenches and pliers | SECTION 71 - CANCELLED | — |
| 009 | Thermostats and wireless remote temperature and humidity monitors for building maintenance; electrical apparatus and instruments, namely, electronic controls and switches for controlling indoor climate in commercial and residential buildings; software for the design and calculation of heating, ventilation, and air conditioning in buildings and water supply systems; software for the control of indoor climate in commercial and residential buildings | SECTION 71 - CANCELLED | — |
| 011 | Underfloor and in wall mounted heating and cooling systems for residential and commercial buildings, composed primarily of tubes, pipes, heat meters, valves, environment controllers and manifolds through which water circulates, all sold as a unit; district heating systems for residential and commercial buildings, composed primarily of tubes, pipes, heat meters, valves, environment controllers and manifolds through which water circulates, all sold as a unit; dripper irrigation systems and sustainable onsite water recycling and wastewater treatment systems, composed primarily of pipes, tubes, sewer pipes, valves, filters and regulators; tap water supply and distribution systems in the nature of water purification installations, composed primarily of pipes, tubes, valves, filters and regulators; drainage systems in the nature of water conditioning units, composed primarily of pipes, tubes, sewer pipes, valves, filters and regulators; sewerage systems and sanitary piping in the nature of sewage purification installations composed primarily of tubes, pipes, valves, controllers and regulators; apparatus for heating and ventilating, namely, air-conditioning units, ceiling fans, electric fans, electric heating fans, electric fan heaters, fans for air-conditioning, ventilating fans for commercial and industrial use | SECTION 71 - CANCELLED | — |
| 017 | Flexible tubes of plastic, not of metal; insulating material for pipes and under floor heating; rings of rubber for use as pipe connection seals; insulating material for pipes and floors; insulating materials, namely, insulating plates pressed together in semi-finished form, insulating tape for installing floor and heating element systems; flexible plastic pipes and plastic hoses for use in snow and ice removal systems; flexible pipes, not of metal | SECTION 71 - CANCELLED | — |
| 019 | Non-metallic rigid pipes for building; non-metal sewer pipes for building purposes; non-metallic gutter pipes, ducts, rigid filtering tubes used to prevent storm water runoff pollutants from entering sewer systems and gutters; non-metal sewer pipes, namely, riser pipes for supervision; installation panels and sheets of plastic and wood for under floor heating, namely, floor panels and boards of composite materials, plastic and wood; rigid plastic pipes and tubes, namely, plastic water pipes; installation panels and sheets of plastic for under floor heating, namely, assembly panels and plates of plastic for floor heating, namely, floor panels not of metal | SECTION 71 - CANCELLED | — |
| 037 | Installation, repair and maintenance of installations for sanitary installations and sanitation equipment; advisory services relating to the installation, service, maintenance and renovation of installations for sanitary installations and sanitation equipment; servicing and installation of drainage and irrigation systems, wastewater handling systems, wastewater treatment systems | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Uponor Innovation AB
- Other trademarks owned by Uponor Innovation AB
- Other trademarks owned by Uponor Innovation AB
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 008
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 037
- Similar marks named LET'S BUILD CONFIDENCE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 19, 2026 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Mar 19, 2026 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Oct 24, 2025 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 19, 2025 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Sep 19, 2025 | INPC | INVALIDATION PROCESSED | — |
| Aug 20, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 20, 2024 | C71T | CANCELLED SECTION 71 | — |
| Apr 26, 2024 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 5, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 11, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 6, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 17, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 17, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 5, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 8, 2018 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 5, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 23, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 23, 2018 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 20, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 20, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 16, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Feb 28, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 28, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 28, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 9, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 9, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 9, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 9, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 9, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 8, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 8, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 8, 2018 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Nov 16, 2017 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Aug 9, 2017 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 8, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 18, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 17, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 17, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 3, 2017 | RFNP | REFUSAL PROCESSED BY IB | — |
| Jan 17, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 17, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 10, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 9, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 3, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 28, 2016 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 28, 2016 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 22, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |