Drawing for LET'S BUILD CONFIDENCE

USPTO serial 79198880

LET'S BUILD CONFIDENCE

Reviewed by CopyMark Law Group

Reg. 5483043Status 404
Filing date
Status date
Registration date
Jun 5, 2018
Examiner
SIRIGNANO, EMMA MARIE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LET'S BUILD CONFIDENCE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Robert A. Becker

Robert A. Becker Fross Zelnick Lehrman & Zissu, P.C.4 Times Square, 17th FloorNew York, NY 10036UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Pipes and tubes of metal; metal waste pipes, metal gutters, metal roof guttering and inspection chambers being metallic drain traps and metal rings therefor; metallic foils, metal plates and metal wire mesh for the installation of floors, heating elements and snow and ice removal systemsSECTION 71 - CANCELLED—
007Machine tools for installation of tap water systems, floor and radiator heating systems, cooling systems, district heating systems, sewer systems, drainage systems and liquid waste management systems, namely, band saws and electric butt welding machines; metalworking machinesSECTION 71 - CANCELLED—
008Hand-operated plumbing snakes, pipe wrenches, rigid and rod hand benders for use on pipes and conduits, wire crimpers, wrenches and pliersSECTION 71 - CANCELLED—
009Thermostats and wireless remote temperature and humidity monitors for building maintenance; electrical apparatus and instruments, namely, electronic controls and switches for controlling indoor climate in commercial and residential buildings; software for the design and calculation of heating, ventilation, and air conditioning in buildings and water supply systems; software for the control of indoor climate in commercial and residential buildingsSECTION 71 - CANCELLED—
011Underfloor and in wall mounted heating and cooling systems for residential and commercial buildings, composed primarily of tubes, pipes, heat meters, valves, environment controllers and manifolds through which water circulates, all sold as a unit; district heating systems for residential and commercial buildings, composed primarily of tubes, pipes, heat meters, valves, environment controllers and manifolds through which water circulates, all sold as a unit; dripper irrigation systems and sustainable onsite water recycling and wastewater treatment systems, composed primarily of pipes, tubes, sewer pipes, valves, filters and regulators; tap water supply and distribution systems in the nature of water purification installations, composed primarily of pipes, tubes, valves, filters and regulators; drainage systems in the nature of water conditioning units, composed primarily of pipes, tubes, sewer pipes, valves, filters and regulators; sewerage systems and sanitary piping in the nature of sewage purification installations composed primarily of tubes, pipes, valves, controllers and regulators; apparatus for heating and ventilating, namely, air-conditioning units, ceiling fans, electric fans, electric heating fans, electric fan heaters, fans for air-conditioning, ventilating fans for commercial and industrial useSECTION 71 - CANCELLED—
017Flexible tubes of plastic, not of metal; insulating material for pipes and under floor heating; rings of rubber for use as pipe connection seals; insulating material for pipes and floors; insulating materials, namely, insulating plates pressed together in semi-finished form, insulating tape for installing floor and heating element systems; flexible plastic pipes and plastic hoses for use in snow and ice removal systems; flexible pipes, not of metalSECTION 71 - CANCELLED—
019Non-metallic rigid pipes for building; non-metal sewer pipes for building purposes; non-metallic gutter pipes, ducts, rigid filtering tubes used to prevent storm water runoff pollutants from entering sewer systems and gutters; non-metal sewer pipes, namely, riser pipes for supervision; installation panels and sheets of plastic and wood for under floor heating, namely, floor panels and boards of composite materials, plastic and wood; rigid plastic pipes and tubes, namely, plastic water pipes; installation panels and sheets of plastic for under floor heating, namely, assembly panels and plates of plastic for floor heating, namely, floor panels not of metalSECTION 71 - CANCELLED—
037Installation, repair and maintenance of installations for sanitary installations and sanitation equipment; advisory services relating to the installation, service, maintenance and renovation of installations for sanitary installations and sanitation equipment; servicing and installation of drainage and irrigation systems, wastewater handling systems, wastewater treatment systemsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 19, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Mar 19, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Oct 24, 2025INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Sep 19, 2025INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Sep 19, 2025INPCINVALIDATION PROCESSED—
Aug 20, 2025INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 20, 2024C71TCANCELLED SECTION 71—
Apr 26, 2024ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jun 5, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 11, 2022NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 6, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 17, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 17, 2018FIMPFINAL DISPOSITION PROCESSED—
Sep 5, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 8, 2018OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 5, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 23, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 23, 2018OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Mar 20, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 20, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 16, 2018GPNXNOTIFICATION PROCESSED BY IB—
Feb 28, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Feb 28, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 28, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 9, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 9, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Feb 9, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 9, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 9, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 8, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 8, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 8, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Nov 16, 2017ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 9, 2017CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 8, 2017CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 18, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 17, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 17, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 3, 2017RFNPREFUSAL PROCESSED BY IB—
Jan 17, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 17, 2017RFRRREFUSAL PROCESSED BY MPU—
Jan 10, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 9, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 28, 2016DOCKASSIGNED TO EXAMINER—
Dec 28, 2016NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 22, 2016REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance