USPTO serial 79199143
DATA ALLIGATOR
Reviewed by CopyMark Law Group
Reg. 5352591Status 709
- Filing date
- Status date
- Registration date
- Dec 12, 2017
- Examiner
- MARESCA, MEREDITH Z
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with DATA ALLIGATOR?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Caldwell A. Camero
Caldwell A. Camero Fluke Corporation6920 Seaway Blvd.Everett, WA 98203UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Sensors and sensor assemblies for measuring, testing and monitoring the alignment of machines, parts of machines and shafts; optical sensors; laser-optical sensors; electric and electro-optical sensors; vibration meters; vibration measuring equipment; gradient indicators; measuring instruments, namely, protractors; weighing, measuring, signalling, testing and checking apparatuses and instruments for measuring, testing, monitoring and interpreting the alignment of machines, parts of machines and shafts, namely, optical, laser-optical and electro-optical sensors and sensor assemblies, therefor, optical sensors, laser-optical sensors, electric and electro-optical sensors, vibration meters, vibration measuring equipment, gradient indicators and protractors being measuring instruments; computer software and computer application software for desktop computers, computer servers and mainframes, handheld computers, mobile phones, and tablet computers, namely, software for capturing, testing, monitoring, interpreting and analysis of data, measurements and sensor signals; data processing apparatus; computer hardware and computer peripheral devices; electronic apparatuses and computers for capturing, interpreting and analysis of data, measurements and sensor signals; automatic and electronic and electric control devices for controlling sensors and for measuring, signalling, testing and checking other electronic measuring apparatuses and instruments | SECTION 71 - CANCELLED | — |
| 037 | Installation, maintenance and repair of machines, namely, agricultural, earthmoving and construction machines, oil and gas extraction and mining equipment, oil, water and petrol pumps for use in motors and engines, hydraulic pumps, rotary, gas, electric, and air compressors and roof fans, electric fans, ceiling fans, industrial robots, generators of electricity, moving and handling equipment, machines and machine tools for treatment of materials and for manufacturing, engines, powertrains and generic machine parts, dispensing machines; installation, maintenance and repair of sensors; installation, maintenance and repair of apparatuses, instruments and equipment for measuring, testing, monitoring and interpreting the alignment of machines, parts of machines and shafts, namely, sensors and sensor assemblies, optical sensors, laser-optical sensors, electric and electro-optical sensors, vibration meters, vibration measuring equipment, gradient indicators and protractors being measuring instruments | SECTION 71 - CANCELLED | — |
| 042 | Industrial analysis and scientific research services in the field of measuring, testing, monitoring and interpreting the alignment of machines, parts of machines and shafts; technological analysis services in the field of engineering as it relates to measuring, testing, monitoring and interpreting the alignment of machines, parts of machines and shafts; product quality testing; quality control for others; material testing; engineering services in the field of measuring, testing, monitoring and interpreting the alignment of machines, parts of machines and shafts; technical project studies in the field of engineering as it relates to measuring, testing, monitoring and interpreting the alignment of machines, parts of machines and shafts; measurement evaluations in the field of measuring, testing, monitoring and interpreting the alignment of machines, parts of machines and shafts; engineering and industrial analysis and evaluation of technical data, signals and measured data in the field of alignment measuring and calibration for machines and parts of machines and shafts, all for scientific research purposes; data-acquisition and collection for calibration and coordinate-measurement purposes; surveying and engineering; technical engineering; design and development of computer hardware and software; design of computer software application programs for data processing apparatuses, computers, laptops, telephones, mobile telephones and smartphones; application service provider services (ASP), namely, hosting computer software applications for others; software as a service (SAAS), featuring software for calibration and coordinate-measurement purposes in the field of alignment of machines, parts of machines and shafts application software rental | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Prüftechnik Dieter Busch Aktiengesellschaft
- Other trademarks owned by Prüftechnik Dieter Busch Aktiengesellschaft
- Other trademarks owned by Prüftechnik Dieter Busch GmbH
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named DATA ALLIGATOR
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 31, 2025 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| May 12, 2025 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| May 12, 2025 | INPC | INVALIDATION PROCESSED | — |
| Feb 28, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 28, 2024 | C71T | CANCELLED SECTION 71 | — |
| Dec 12, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 20, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 1, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 1, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jul 16, 2020 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jun 26, 2020 | CORV | REVIEW OF CORRESPONDENCE COMPLETE - ADDRESS UPDATED | — |
| Jun 24, 2020 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jun 24, 2020 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 24, 2020 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jun 24, 2020 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 24, 2020 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 24, 2020 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| May 19, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 26, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 26, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 12, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 12, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 26, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 26, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 6, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 14, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 14, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 14, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 14, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 14, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 8, 2017 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 8, 2017 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 8, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 25, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 24, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 24, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 24, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 18, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 23, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 23, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 21, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 18, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 17, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 17, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 17, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 12, 2017 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Dec 29, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |