USPTO serial 79199144
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Holby M. Abern
Holby M. Abern Neal, Gerber & Eisenberg LLP225 West Randolph StreetSuite 2800Chicago, IL 60606| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Electric motors and engines, except for land vehicles; machine coupling and transmission components, except for land vehicles; elevators, namely, inclined elevators, structural parts thereof, and accessories therefor¸ namely, electric motors, elevator belts, elevator gears, elevator doors, elevator chains being parts of machines | ACTIVE | — |
| 009 | Electrical, electronic and computer equipment for ropeways and railways in the nature of electric and electronic control systems to manage the power, movement and functions of elevators, ropeways, tramways, funicular railways, and industrial ropeways; software for controlling ropeways and railways | ACTIVE | — |
| 012 | Cable transport apparatus and installations¸ namely, cable cars, shuttle cars, elevated tramways, automatic tramways, ski lifts, chair lifts, gondola lifts, telpher cars, light railway cars, funicular railcars, gondola cable car lifts, chair lifts, aerial cableway cars, ski tow bars, cable railway cars, cableway cars, air-cushion vehicles; ropeways, namely, ropeway cars, industrial ropeways for transport of persons or loads; ski lifts, chair lifts, gondola lifts, cable cars, tramways; ground ropeways in the nature of funiculars, shuttle trains, tramways, underground railway carriages; private and public rail transportation systems, namely, elevated tramways, automatic tramways; railway rolling stock, structural parts and fittings of the aforesaid goods | ACTIVE | — |
| 037 | maintenance and repair of aerial ropeway apparatus and installations, ground ropeway apparatus and installations and public rail transportation apparatus and installations, all of the foregoing being machines, vehicles and equipment; Construction, namely installation of aerial ropeway installations, ground ropeway installations and public rail transportation installations, comprised of cable cars, shuttle cars, elevated tramways, automatic tramways, ski lifts, chair lifts, gondola lifts, telpher cars, light railway cars, funicular railcars, gondola cable car lifts, chair lifts, aerial cableway cars, ski tow bars, cable railway cars, cableway cars, air-cushion vehicles, ropeway cars, industrial ropeways for transport of persons or loads, funiculars, shuttle trains, tramways, underground railway carriages; construction consultation relating to the installation of aerial ropeway apparatus and installations, ground ropeway installations and public rail transportation apparatus and installations, comprised of cable cars, shuttle cars, elevated tramways, automatic tramways, ski lifts, chair lifts, gondola lifts, telpher cars, light railway cars, funicular railcars, gondola cable car lifts, chair lifts, aerial cableway cars, ski tow bars, cable railway cars, cableway cars, air-cushion vehicles, ropeway cars, industrial ropeways for transport of persons or loads, funiculars, shuttle trains, tramways, underground railway carriages | ACTIVE | — |
| 039 | Arrangement and operation of transportation of people; arranging, operating and providing transport by cable transport systems; cable-car transport; consultancy services for private and public transportation by cable-cars, ropeway, ski lifts, chair lifts, gondola lifts, tramways, ground ropeway, funiculars; professional consultancy relating to the arrangement and operation of transportation by cable-cars, ropeway, ski lifts, chair lifts, gondola lifts, tramways, ground ropeway, funiculars | ACTIVE | — |
| 042 | Technical engineering; technical research, conducting project studies in the nature of new technology feasibility studies, transportation and transit planning, and design, developing and testing of new products and technologies, all relating to the construction of cable transport apparatus and installations, ropeways, rail transportation systems; technical consultancy in the field of design and development of cable transport apparatus and installations, ropeways, rail transportation systems; construction planning of aerial ropeway systems, ground ropeway systems and public rail transportation systems | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 4, 2025 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 4, 2025 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 4, 2025 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 28, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 10, 2025 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Feb 10, 2025 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Feb 10, 2025 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 19, 2024 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Apr 10, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Aug 24, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 30, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 30, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 10, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 10, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 23, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 23, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 19, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 3, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 3, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 3, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 11, 2017 | ALIE | ASSIGNED TO LIE | — |
| Nov 29, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 29, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 28, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 28, 2017 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Aug 10, 2017 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 10, 2017 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 10, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 12, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 11, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 11, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 20, 2017 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 20, 2017 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 3, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 17, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 17, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 10, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 9, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 7, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 3, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 3, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 29, 2016 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |