USPTO serial 79200040
GROUPE SNEF
Reviewed by CopyMark Law Group
Reg. 5343323Status 709
- Filing date
- Status date
- Registration date
- Nov 28, 2017
- Examiner
- RIRIE, VERNA BETH
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with GROUPE SNEF?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Hope V. Shovein
Hope V. Shovein Brooks Kushman P.C.1000 Town Center, 22nd FloorSouthfield, MI 48075UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction consultation; construction management supervision; construction, maintenance, repair and renovation of buildings; interior design of buildings; maintenance and repair of installations in buildings; building sanitation services; asbestos extraction; installation, maintenance and repair of urban furniture; installation, maintenance and repair of electrical power installations; laying of cables; restoration, repair and maintenance of electric wiring; repair of electric lines; installation, maintenance and repair of HVAC systems for heating, ventilation and air conditioning; heating equipment installation and repair; air-conditioning apparatus installation and repair; installation, maintenance and repair of de-smoking apparatus; plumbing; installation, maintenance and repair of water and gas ducts; installation and repair of electricity generating apparatus; electrical generating machinery installation, maintenance and repair; installation, maintenance and repair of computer hardware and telecommunication apparatus; installation, maintenance and repair of computers; installation, maintenance and repair of telecommunication networking hardware; installation, maintenance and repair of factory automation equipment; installation, maintenance and repair of automatic control systems for industrial manufacturing machines and automated installations; installation, maintenance and repair of intelligent environmental control systems for buildings; installation, maintenance and repair of audiovisual equipment; installation, maintenance and repair of lighting instrumentation systems; installation, maintenance and repair of security and safety equipment; installation, repair and maintenance of floor control systems; installation, maintenance and repair of fire detection systems; installation, maintenance and repair of video surveillance systems; installation, maintenance and repair of equipment for automatic doors; door and window installation; installation, maintenance and repair of lighting systems; industrial wastewater fluid pumping services; installation, maintenance and repair of industrial factory sites; construction, maintenance and repair of apparatus and installations for generating power; installation, maintenance and repair of photovoltaic installations; demolition of buildings; dismantling of installations previously active in the field of nuclear energy; installation, maintenance and repair of devices for radiation protection; information and advice relating to the aforesaid services | SECTION 71 - CANCELLED | — |
| 042 | Scientific research; technological research and analysis services in the field of renewable energy; industrial research and analysis services in the field of energy; technical research, data analysis and mechanical research all in the field of electricity; research and technical project studies for the development of new products in the field of industrial automation processes; research and development of new products for others; computer system design services; architectural services; construction drafting; engineering; civil engineering; electrical engineering services; technical engineering; mechanical engineering; engineering services relating to the design of electronic systems; engineering services relating to robotics; computer engineering services; engineering services relating to information technology; telecommunications engineering; engineering services in the field of energy technology; nuclear engineering services; energy-related audits; design and development of computer hardware; programming for computers; software design and development; installation of computer software; rental of computer software; maintenance of computer software; software updating; consulting services in the field of cloud computing; computer system analyses; design and development of electronic data security systems; conversion of computer programs and data, other than physical conversion; conversion of data or documents from physical to electronic media; computer-aided graphic design; industrial design; computer simulation and modeling services; digital mapping services; research relating to computerized automation of industrial procedures; engineering research in the field of instrumentation; technological consultancy services in the field of information technology and telecommunication technology; software consultancy; consultancy relating to computer security | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SNEF SA
- Other trademarks owned by SNEF SA
- Other trademarks owned by SNEF SA
- Other trademarks owned by SNEF SA
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named GROUPE SNEF
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 19, 2026 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| May 17, 2025 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 30, 2025 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Apr 30, 2025 | INPC | INVALIDATION PROCESSED | — |
| Feb 14, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 14, 2024 | C71T | CANCELLED SECTION 71 | — |
| Nov 28, 2022 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Oct 15, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 17, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 4, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 14, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 14, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Feb 28, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 28, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 12, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 12, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 23, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 28, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 28, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 27, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 27, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 18, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 30, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 30, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 27, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 26, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 17, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 13, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 13, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 12, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |