USPTO serial 79200629
GRG
Reviewed by CopyMark Law Group
Reg. 5639921Status 709
- Filing date
- Status date
- Registration date
- Jan 1, 2019
- Examiner
- BLAZICH, JOAN MICHELE
- Law office
- POST REGISTRATION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with GRG?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
US
DE
DE
Lebach, DE
DE
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Transportation machines and transportation apparatus, namely, conveyor belts, transportation robots, namely, robots for transporting work pieces and product components in production processes, gantries, namely, gantry cranes, roller conveyors and chutes being parts of machines; handling apparatus, namely, handling robots, namely, robots for handling work pieces and product components in production processes; machine tools for machining cylinder heads: clamping devices for use in cutting machine tools, namely, clamps for use in precision clamping of work pieces and cutting tools on cutting machine tools: gas, laser and electric welding machines, robots for welding; welding installations, namely, machine tools for use in welding and cutting work pieces comprising gas, laser and electric welding machines and industrial robots for welding: electrically operated horizontal conveyors and vertical conveyors for moving, parking and positioning land vehicles, namely, electrically operated roller conveyors, elevators and lifting platforms; machine tools for the manufacturing and processing of cutlery, hand tools and machine knives, namely, grinding machines, polishing machines and sharpening machines | SECTION 71 - CANCELLED | — |
| 009 | Measuring, signaling and checking apparatus and instruments, namely, electronic instruments for use in remote inspection and measurements of industrial components, signal conditioning and communication apparatus for industrial process control, integrated circuits incorporating algorithms for use in industrial process control, technical measuring and checking apparatus and instruments for measuring and checking acceleration, speed, position, distance, weight, pressure, force, torque, temperature, current and voltage, electronic motor controllers electronic pneumatic and hydraulic controllers for industrial process control, electronic control circuits for use with power converters, electronic apparatus for the remote control of industrial operations, electric control devices for energy management, electronic control systems for machines; electrical switch cabinets for industrial process control; industrial electronic controls incorporating industrial process control software | SECTION 71 - CANCELLED | — |
| 037 | Machinery installation, repair and maintenance services for storage racks of metal, storage towers of metal, transportation machines, transportation apparatus, handling apparatus, machine tools for machining cylinder heads, clamping devices for cutting machine tools, welding machines, robots for welding, welding installations, mechanical and electromechanical apparatus and devices, namely, for mechanical and electromechanical apparatus for automatic vehicle parking machine tools for the manufacturing and processing of cutlery, hand tools and machine knives, namely, for grinding machines, polishing machines and sharpening machines | SECTION 71 - CANCELLED | — |
| 042 | Engineering services, namely, technical design and planning of storage racks of metal, storage towers of metal, transportation machines, transportation apparatus, handling apparatus machine tools for machining cylinder heads, clamping devices for cutting machine tools, welding machines, robots for welding, welding installations, mechanical and electro mechanical apparatus and devices, namely, of mechanical and electromechanical apparatus for automatic vehicle parking, machine tools for the manufacturing and processing of cutlery, hand tools and machine knives, namely, of grinding machines polishing machines and sharpening machines; engineering services, namely, technical design and planning of electrical control cabinets; development of software for control and closed-loop control of machine tools, transportation machines, transportation apparatus, handling apparatus, mechanical and electromechanical apparatus and devices | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by GRG America LLC
- Other trademarks owned by Global Retool Group GmbH
- Other trademarks owned by GRG Europe GmbH
- Other trademarks owned by Global Retool Group GmbH
- Other trademarks owned by Global Retool Group GmbH
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named GRG
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 23, 2026 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Mar 19, 2026 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Mar 18, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jul 18, 2025 | C71T | CANCELLED SECTION 71 | — |
| Jun 16, 2020 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Apr 29, 2020 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 29, 2019 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Aug 16, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 14, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 3, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 26, 2019 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 26, 2019 | ES7R | TEAS SECTION 7 REQUEST RECEIVED | — |
| Apr 11, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 11, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 9, 2019 | PRAN | POST REGISTRATION ACTION MAILED NO RESPONSE REQUIRED | — |
| Apr 1, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 11, 2019 | PAPER RECEIVED | — | |
| Mar 1, 2019 | FAXX | FAX RECEIVED | — |
| Jan 1, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 9, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 16, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 26, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 26, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 26, 2018 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 12, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 10, 2018 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Sep 7, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 7, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 13, 2018 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 27, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 27, 2018 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 7, 2018 | RDX2 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED MAILED | — |
| Feb 6, 2018 | RRDX | ACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED | — |
| Jan 25, 2018 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jan 25, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 24, 2018 | PAPER RECEIVED | — | |
| Jan 22, 2018 | RDX2 | ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED MAILED | — |
| Jan 19, 2018 | RRDX | ACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED | — |
| Jan 17, 2018 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jan 17, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 12, 2018 | FAXX | FAX RECEIVED | — |
| Sep 7, 2017 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 6, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 15, 2017 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Aug 15, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 11, 2017 | ALIE | ASSIGNED TO LIE | — |
| Jul 18, 2017 | PAPER RECEIVED | — | |
| Jul 6, 2017 | FAXX | FAX RECEIVED | — |
| Feb 24, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 6, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 6, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 3, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 2, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 31, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jan 27, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jan 27, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jan 26, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |