USPTO serial 79201072
RAIL 4.0
Reviewed by CopyMark Law Group
Reg. 5393293Status 709
- Filing date
- Status date
- Registration date
- Feb 6, 2018
- Examiner
- LAM, HAI-LY HUYNH
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with RAIL 4.0?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Rhomberg Sersa Rail Holding GmbH
Bregenz, AT
Rhomberg Sersa Rail Holding GmbH
Bregenz, AT
Rhomberg Sersa Rail Holding GmbH
Bregenz, AT
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Kornelia Wayda
KORNELIA WAYDA INDUSTRIEBERATUNG MAIER AGGEWERBESTRASSE 10SISSACH, 4450SWITZERLANDGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys; metal building materials, namely, metal rails and steel rebars, rods, and mesh used for strengthening and reinforcing concrete structures; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery, namely, iron rebars, rods, and mesh used for strengthening and reinforcing concrete structures; small items of metal hardware, namely, bolts; pipes and tubes of metal; beams, rails and supporting structures being construction elements all of metal; metal fish plates in the nature of hardware for fastening rails; railway materials, namely, railway points | SECTION 71 - CANCELLED | — |
| 007 | Construction machinery and machine tools, namely, excavating machines; motors and engines except for land vehicles; machine coupling and transmission components except for land vehicles; machines, machine tools and equipment, namely, cranes and excavating machines all for railway construction, railway line construction, track construction and for laying rails; track construction machines, namely, mobile cranes and track laying machines being rail-laying machines | SECTION 71 - CANCELLED | — |
| 035 | Advertising services; business management; business administration; providing office functions; advertising and sales promotion in relation to railway construction, railway track construction and track laying; business consultancy and preparation of expert business opinions in the commercial and professional business sector, in particular in the field of railway construction, railway line construction, track construction and for laying rails; business advice, assistance and information relating to all the aforesaid; business advice, assistance and information, namely, providing on-line business information via cloud computing in relation to all the aforesaid services | SECTION 71 - CANCELLED | — |
| 037 | Installation of working and building platforms; construction of railways; railway track construction; construction of permanent ways for railways; repair, restoration, maintenance, renovation, modernisation and structural alteration work in the field of railway tracks; maintenance services in the field of railway tracks; assembly, repair, installation, restoration, maintenance and servicing of railway tracks and platforms; advice, information and consultancy services relating to all of the aforesaid services; advice, information and consultancy services, namely, providing on-line information via cloud computing in relation to all the aforesaid services; rental of railway track construction machines, railway laying machines and equipment for railway, railway line and railway track construction; railway line construction; repair, installation, overhaul, servicing and maintenance of railway lines, railway track systems and railway tracks and rails; information, advice and assistance relating to all the aforesaid services | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services, namely, scientific research in the field of railway tracks and new product research and design relating thereto; industrial analysis and research services in the field of engineering of railway tracks; design and development of computer hardware and software; technological advice and consultancy in the field of engineering of railway tracks; technological advice and consultancy, namely, consulting services in the field of cloud computing; engineering consultancy in the field of civil engineering relating to railway construction, rail traffic route construction and railway track construction; soil and building material investigations, namely, materials testing and analysing of soil and building materials; engineering consultancy, information and support in the field of technical project planning for rail traffic route construction, railway construction and railway track construction | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Rhomberg Sersa Rail Holding GmbH
- Other trademarks owned by Rhomberg Sersa Rail Holding GmbH
- Other trademarks owned by Rhomberg Sersa Rail Holding GmbH
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named RAIL 4.0
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 12, 2025 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 4, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 30, 2025 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jul 30, 2025 | INPC | INVALIDATION PROCESSED | — |
| Apr 23, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 23, 2024 | C71T | CANCELLED SECTION 71 | — |
| May 19, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 6, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jun 23, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 14, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 14, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 6, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 6, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 21, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 21, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 1, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 13, 2017 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 12, 2017 | ALIE | ASSIGNED TO LIE | — |
| Sep 29, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 25, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 25, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 25, 2017 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 19, 2017 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jul 19, 2017 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 19, 2017 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 29, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 28, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 28, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 28, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 4, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 15, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 15, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 14, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 14, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 13, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 8, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 8, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 2, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |