USPTO serial 79201600
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Martin R. Geissler
Martin R. Geissler MUNCY, GEISSLER, OLDS & LOWE, P.C.125 S. Royal St.Alexandria, VA 22314United States| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electrotechnical, electronic, optoelectronic and acoustic equipment, apparatus and installations composed thereof for monitoring, controlling and regulating water supply and drainage, treatment, availability, distribution, removal and heating of drinking and commercial water, namely, electronic water filter controllers, electrical integrated control systems for use in the field of waste water treatment and drinking fountains, sensors for measuring concentrations of chemicals in water, water testing instrumentation for monitoring and detecting contamination; equipment and apparatus for monitoring, measuring, controlling and regulating pressure, temperature and flow rate quantities of water in water conduit installations, containers and sanitary installations, namely, water meters, temperature sensors, thermostats, flow monitors and flow control valves; temperature controlling apparatus being thermostats, and thermostat batteries; individual structural parts and replacement parts for all of the aforesaid goods | ACTIVE | — |
| 011 | Apparatus for water supply and sanitary purposes, including for kitchens, namely, water purification and filtration apparatus and faucets; sanitary fittings, fixtures and fittings, namely, cocks, traps, valves, faucets, faucet sprayers and taps, for water supply, water heating, bath, shower, washing, dish-washing, bidet and toilet installations and for the water intake and drainage of such installations, the aforesaid fixtures and fittings, including digital and touch-controlled fittings, namely, valves, faucets, mixer faucets for water pipes, escutcheons, faucet sprayers, taps, mixer taps for hot and cold water; hot/cold water mixer fittings, namely, mixer faucets and mixer taps; water run-off and overflow fittings, namely, spouts traps, valves; taps for washstands, tubs, showers and bidets; showers, hand showers and overhead showers; shower fittings, namely, shower control valves, massage showers, showers, spray nozzles and spray heads for the aforesaid goods; holders, tubes and tube connections for the aforesaid showers, namely, plumbing valves being parts of shower plumbing installations, shower faucet extensions, shower trays, plumbing couplers and flexible pipes being parts of shower plumbing installations; shower columns being parts of showers; complete shower and wash cubicles, shower trays, shower basins, shower cubicles, shower systems comprised primarily of shower surrounds, shower panels, showerheads and components thereof; shower apparatus, namely, shower and bath installations; shower apparatus, namely, shower and bath cubicles; electronically controlled self-closing shower-taps, including the aforesaid water supply and sanitary fittings being thermostat and non-contact controlled fittings, namely, shower mixers, mixer faucets for water pipes; taps for sink units; water mixers, namely, mixer faucets for water pipes, mixer taps for water pipes; mixing valves, namely, shower mixing valves, shower control valves, manually-operated plumbing valves, tub control valves; pressure-reducing taps; plumbing shutter valves; sanitary fittings, namely, water inlets and outlets in the nature of faucets, plumbing valves; water inlets and outlets being sanitary fittings; water softening apparatus and installations; sanitary furnishings, namely, wash basins, [ laundry dryers, ] bathtubs, [ bath tubs for sitz baths; ] replacement parts and fittings for all the aforesaid goods; pressure regulators and pipe parts for sanitary installations | ACTIVE | — |
| 020 | Furniture of metal, plastic and glass for the kitchen, bathroom and washroom; [ medicine cabinets and sanitary cabinets; dressing tables; ] mirrors and mirrored cabinets for baths and washrooms; mirrors in conjunction with lighting namely, mirrors enhanced by electric lights; bathroom and shaving mirrors; individual structural and replacement parts for all the aforesaid goods | ACTIVE | — |
| 021 | Washroom and bathroom accessories, namely, towel holders, bath tub handles, soap dispensers, soap dishes, soap holders, toothbrush mugs, holders for toothbrush mugs and toilet paper, units for storing toilet utensils, namely, toilet brush sets consisting of toilet brushes, toilet brush holders, toilet paper holders; toilet brush fittings, namely, toilet brush holders; [ small household polishing apparatus, namely, polishing cloths; and portable containers for household purposes of metal, plastic and wood not of precious metal or coated therewith; ] beverage glassware, porcelain and earthenware, namely, mugs, beverage glassware, soap holders, soap dishes, and soap dispensers; individual structural and replacement parts for all the aforesaid goods | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 25, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Oct 24, 2025 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 3, 2025 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Oct 3, 2025 | INPC | INVALIDATION PROCESSED | — |
| May 26, 2025 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 27, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 26, 2024 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 26, 2024 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Sep 23, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 21, 2024 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Feb 6, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Apr 11, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 15, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 15, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 15, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 6, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 6, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 21, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 21, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 1, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 12, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 11, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Oct 11, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Oct 11, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Oct 11, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 14, 2017 | GPRN | NOTIFICATION OF PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Sep 14, 2017 | GPRA | PRIORITY ACTION E-MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Sep 14, 2017 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Aug 23, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 23, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 23, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 23, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 17, 2017 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 17, 2017 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 17, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 23, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 22, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 22, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 11, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Feb 22, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Feb 22, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Feb 21, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Feb 20, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Feb 19, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 17, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 17, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 16, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |