Drawing for GSP

USPTO serial 79202112

GSP

Reviewed by CopyMark Law Group

Reg. 5332115Status 709
Filing date
Status date
Registration date
Nov 14, 2017
Examiner
BODRI, KRISTIN MARIE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with GSP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Paul D. Bianco

Paul D. Bianco FLEIT GIBBONS GUTMAN BONGINI & BIANCO PL21355 East Dixie HighwaySuite 115Miami, FL 33180

Goods and services

ClassDescriptionStatusFirst use
006Gutter pipes of metal; building and construction materials and elements of metal, in particular metal clamps for use on walls and ceilings, and ceiling supports; building and construction materials and elements of metal, in particular explosion-resistant building elements, namely, facade panels of metal; building panels of metal; transportable buildings of metal; metallic mounting brackets for general use; heated facade elements of metal, namely, heated beams and ceiling supports of metal; bolts of metal; roof gutters of metal; windows of metal; windows of metal and installation hardware, namely, bolts; metal window frames; masts of metal; wall claddings of metal for building; frames of metal for building; mouldings of metal for cornices; metal pipes; metal ladders; steel sheets; transportable buildings of metal, namely, steel buildings; steel masts; steel pipes; poles of metal; lintels of metal for windows and doors; props of metal, namely, metal beams, metal supports for construction and building purposes; wainscoting of metal; metal roof trusses; framework of metal for building, in particular spatial frameworks of tubular rods; metal bars for further manufacture, namely, profile bars; chain hoists for lifting and rigging; metal wall, roofing, and ceiling panels; structural joint connectors of metal on for use on roofs, domes, ceilings, and building walls; scaffolding towers of metal, transportable buildings of metal, and staircases of metal; stair treads of metal; stringers as parts of staircases of metal; door frame casings of metal; latches of metal; door structures and elements of metal, namely, doors, door panels, door handles, door units, door frames, door fittings, door casings, door jambs, door knockers, door stops, and non-electric door closers; cladding of metal for building construction; non-electric cables and wires of common metal; metal hardware made of iron, namely, anchor plates; modular metallic buildings; metal building materials, namely, wall, ceiling, support and clamp profilesSECTION 71 - CANCELLED—
019Building glass; explosion-resistant building and constructional materials and construction elements, not of metal, in particular facade panels and glass panes; non-metal building boards, namely, fiber glass boards, floor boards, boards of wood, ceiling boards of wood, exterior boards, gypsum boards, fire-resistant boards for construction, water-resistant boards for construction, paper board for building, wall boards, sheathing boards, plaster boards, and plywood boards; transportable buildings, not of metal; roofing, not of metal, in particular filigree roof structures of glass; gutters, not of metal; windows, not of metal; non-metal window frames; window glass, for building; plate glass windows, for building; insulating glass for building; roof flashing, not of metal, for building; wall claddings, not of metal, for building; casement windows, not of metal; props, not of metal, namely, beams and supports for construction and building purposes; wainscoting, not of metal; joists, not of metal; framework for building, not of metal; stairways, not of metal for use in buildings, in particular staircases of glass; stair-treads, not of metal, in particular stair-treads of glass; stringers as parts of staircases, not of metal, in particular stringers of glass; door structures and elements, not of metal namely, doors, door panels, door units, door frames, door casings, and door jambs; surfacings, not of metal, for building, namely, wall claddings; wall linings, not of metal, for building, namely, plastic foils and textile membranes for wall linings; non-metallic rigid gutter pipes for building; asphalt, pitch and bitumen; transportable buildings and monuments, not of metal; non-metallic prefabricated building elements for on-site assembly, namely, wall, ceiling and facade panels; non-metallic prefabricated building components, namely, wall, ceiling and facade panels; non-metallic molds for forming wall, ceiling and facade panels for buildingSECTION 71 - CANCELLED—
037Building construction; building of exhibition stands and shops; building construction supervision; building construction management services; maintenance and repair of buildings; building construction consultancy; installing siding; construction of pre-fabricated buildings; installation of doors and windows; construction of prefabricated buildings and structures, namely, parts of buildings, glass elements for buildings, facade panels, glass panes, roof structures, windows, framework, staircases, door structures; installation of facade panels on building facadesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 31, 2025INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Apr 14, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Apr 14, 2025XXCRGENERIC MADRID TRANSACTION CREATED—
Jan 31, 2025INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 31, 2024C71TCANCELLED SECTION 71—
Nov 14, 2022REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 5, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 20, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 26, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 26, 2018FIMPFINAL DISPOSITION PROCESSED—
Feb 14, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 14, 2017R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 29, 2017NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 29, 2017PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 9, 2017NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 14, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 14, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Jul 14, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jul 14, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Jul 14, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 22, 2017CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jun 22, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 22, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 13, 2017ALIEASSIGNED TO LIE—
May 19, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 18, 2017RFNTREFUSAL PROCESSED BY IB—
Mar 3, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 2, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 2, 2017RFRRREFUSAL PROCESSED BY MPU—
Mar 1, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 28, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 27, 2017DOCKASSIGNED TO EXAMINER—
Feb 27, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 23, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance