Drawing for WE OPEN THE WAY

USPTO serial 79203265

WE OPEN THE WAY

Reviewed by CopyMark Law Group

Reg. 5547737Status 706Registered
Filing date
Status date
Registration date
Aug 28, 2018
Examiner
TWOHIG, SHANNON MARIE
Law office
TMO LAW OFFICE 121

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with WE OPEN THE WAY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey H. Handelsman

Jeffrey H. Handelsman Greenblum & Bernstein, P.L.C.1950 Roland Clarke PlaceReston, VA 20191-1411United States

Goods and services

ClassDescriptionStatusFirst use
019Non-metallic building materials and products for construction, maintenance, coating, repair and renovation of buildings, civil engineering structures, roads, sidewalks, pavements, squares and other traffic and road surfaces and lanes and all public works, namely, ground stabilizers for road construction, binding agents for road maintenance, binding agents for road maintenance composed of vegetable raw materials, concrete and asphalt for construction, asphalt screed components, components of asphalt pavements, and coatings for photovoltaic surfaces; bitumen; polymeric emulsions of bitumen for road surfaces; bituminous coatings for roofing, buildings, facades, engineering structures, roads, pavements, roadways, parking lots and other such roads, road surfaces and traffic lanes; dyeable bituminous binding agents for roofing, buildings, facades, engineering structures, roads, pavements, roadways, parking lots and other such roads, road surfaces and traffic lanes; composite bituminous emulsion binding agents, namely, binding agents for road maintenance; tar, cement, and asphalt-based coatings for construction, maintenance, stabilization, repair, and renovation of roads, industrial floors, floors for sports purposes, landing and parking areas, and other such roads, road surfaces, traffic lanes, highways, and sidewalks; cement; lime and other hydraulic binders, namely, magnesium cement and lime-clay cement for road construction; mortars for building; concrete; ready-to-use concrete; curb filling concrete; dry mortar for building ; cement aggregates; coatings, coatings for facings, coatings for floor smoothing, namely, non-metal flooring materials for smoothing; bituminous coatings and binding agents for road construction, namely, magnesium cement and lime-clay cement for road construction, tars; non-metal linings and wall coverings for building, namely, siding plates and insulations for walls and ceilings, roofing, buildings, facades, engineering structures, roads, pavements, roadways, parking lots and other such roads, road surfaces and traffic lanes; non-metal cladding for construction and building; non-metal structural profiles being laminated prefabricated architectural and structural members for construction, maintenance, coating, repair and renovation of buildings, engineering structures for the production and storage of crude oil and natural gas, roads, pavement, roadways, and other such roads, road surfaces, traffic lanes and public works; non-metal frames for doors and windows; framework, namely, non-metal wall frames for building; non-metal structural chassis for building, namely, prefabricated frameworks for windows and structures for constructionACTIVE—
037Construction of roofing, buildings, facades, engineering structures for the production and storage of crude oil and natural gas, roads, pavements, roadways, parking lots and other such roads, road surfaces and traffic lanes; providing information pertaining to the construction of roofing, buildings, facades, engineering structures for the production and storage of crude oil and natural gas, roads, pavements, roadways, parking lots, and other such roads, road surfaces and traffic lanes; construction consultancy; building construction supervision; masonry; insulation services, namely, installation of building insulation; demolition of buildings; rental of construction equipment; installation, maintenance and repair of energy distribution machines and apparatus; installation, maintenance and repair of electrical apparatus and installations, lighting apparatus, heating apparatus, air-conditioning apparatus, electrical apparatus, photovoltaic panels, solar panels, wind turbines, boilers, furnaces, burners, apparatus for cooking, refrigeration, ventilation, air-conditioning, water distribution and sanitary installations; construction, maintenance, and repair of buildings, civil engineering structures for the production and storage of crude oil and natural gas, roofs, facades, roads, sidewalks, pavement, plazas, road and highway pavements, industrial floors and floors for sports purposes and other such traffic and road surfaces and lanes; construction and maintenance of installations for energy and electricity production and distribution; construction, maintenance and repair of solar thermal installations, electric power stations, nuclear, hydroelectric and hydraulic power plants, dams, wind farms, oil pipelines, gas pipelines, gas transportation conduits, power lines, oil installations, marine turbine farms, photovoltaic farms, tidal power plants, geothermal power plants and biomass power plants; providing information and advisory services relating to the installation, maintenance, renovation and repair of power generation equipment and installations; construction supervision, management of construction installation, servicing, maintenance and repair of apparatuses for the production, provision, and distribution of energy; installation, maintenance, renovation and repair of a system for the protection and security of property and individuals; servicing and repair services for energy and electricity installations for the production of energy and electricity, of and energy equipment and apparatus in the field of energy production; construction advice for the construction of installations for the production of energy and electricity, nuclear power plants, nuclear reactors, thermal power plants, hydroelectric power plants, hydraulic plants, dams, wind farms, oil pipelines, power lines, oil pipeline installations, marine turbine farms, photovoltaic farms, tidal plants, geothermal power plants and biomass power plantsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 3, 2026RNWLINTERNATIONAL REGISTRATION RENEWED—
Jul 9, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 30, 2024NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Dec 30, 202471AGREGISTERED-SEC.71 ACCEPTED—
Dec 27, 2024EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Dec 17, 2024PR71POST REGISTRATION ACTION MAILED - SEC.71—
Dec 16, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 17, 2024ES71TEAS SECTION 71 RECEIVED—
Aug 28, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 13, 2019ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Dec 28, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 8, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 8, 2018FIMPFINAL DISPOSITION PROCESSED—
Nov 28, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 7, 2018OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Aug 28, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 22, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 22, 2018OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Jul 19, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 12, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 12, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 8, 2018GPNXNOTIFICATION PROCESSED BY IB—
May 23, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 23, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
May 23, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 8, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 4, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 4, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 4, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Nov 4, 2017GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Nov 4, 2017GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 4, 2017CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 23, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 22, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 22, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 15, 2017RFNPREFUSAL PROCESSED BY IB—
Mar 24, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Mar 24, 2017RFRRREFUSAL PROCESSED BY MPU—
Mar 23, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Mar 22, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 21, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Mar 17, 2017DOCKASSIGNED TO EXAMINER—
Mar 17, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 16, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance