Drawing for C PAOLO CASTELLI

USPTO serial 79205502

C PAOLO CASTELLI

Reviewed by CopyMark Law Group

Reg. 5592333Status 709
Filing date
Status date
Registration date
Oct 30, 2018
Examiner
BUCHANAN WILL, NORA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with C PAOLO CASTELLI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

R. Neil Sudol

R. Neil Sudol CoSud Intellectual Property Solutions, P714 Colorado AvenueBridgeport, CT 06605

Goods and services

ClassDescriptionStatusFirst use
011Lighting apparatus for residential use, chandeliers, lamps, table lamps, wall lights, floor lamps, ceiling lamps, arc lamps, lightbulbs, ceiling lights; bathtubs, sinksSECTION 71 - CANCELLED—
020Furniture and interior furnishings, namely, chests of drawers, dressers, bedside cabinets, dressing mirrors, wardrobes, beds, cupboards, tables, chairs, armchairs, sofas, console tables, writing desks, desks, bookcases, furniture for televisions, furniture for hold telephones, mirrors; non-metal portable staircases; Venetian blinds, wooden blinds, panel curtains, indoor blinds, slatted wood blinds, bamboo curtainsSECTION 71 - CANCELLED—
037Building, construction and demolition; consultancy regarding building construction; consultancy in the field of civil engineering relating to the construction of public works and buildings; construction of property; construction of public works; on site building project management; building inspection in the course of building construction; application of surface coatings; bricklaying; laying of cables; pipeline laying; pipe laying; laying and construction of pipelines; installation of road surfaces; plant maintenance; maintenance of property; renovation and restoration of buildings; plumbing and gas and water installation; installation and repair of heating installations and air conditioning installations; installation of kitchens cabinets and kitchen appliances; installation of plumbing sanitary apparatus and installation of bathroom fixtures; installation and maintenance of electric installations, maintenance of alarm installationsSECTION 71 - CANCELLED—
042Urban planning and design of interior decoration, architectural design for interior decoration, design in relation to interior decoration, professional consultancy relating to the design of interior and exterior decoration, furniture design for interior decoration; interior and exterior design services, design of curtainsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 10, 2026INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Aug 18, 2026INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Aug 18, 2026INPCINVALIDATION PROCESSED—
Feb 19, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 16, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 16, 2025C71TCANCELLED SECTION 71—
Oct 30, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Mar 1, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 9, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 9, 2019FIMPFINAL DISPOSITION PROCESSED—
Jan 30, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 30, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 12, 2018OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Sep 26, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 26, 2018OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Aug 14, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 14, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 10, 2018GPNXNOTIFICATION PROCESSED BY IB—
Jul 25, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 25, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 25, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 6, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 3, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 2, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 2, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 11, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 11, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 11, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 1, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 31, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 31, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 27, 2017RFNTREFUSAL PROCESSED BY IB—
May 8, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 8, 2017RFRRREFUSAL PROCESSED BY MPU—
May 2, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 30, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 29, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 27, 2017DOCKASSIGNED TO EXAMINER—
Apr 27, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 20, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance