USPTO serial 79205502
C PAOLO CASTELLI
Reviewed by CopyMark Law Group
Reg. 5592333Status 709
- Filing date
- Status date
- Registration date
- Oct 30, 2018
- Examiner
- BUCHANAN WILL, NORA
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with C PAOLO CASTELLI?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
R. Neil Sudol
R. Neil Sudol CoSud Intellectual Property Solutions, P714 Colorado AvenueBridgeport, CT 06605Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Lighting apparatus for residential use, chandeliers, lamps, table lamps, wall lights, floor lamps, ceiling lamps, arc lamps, lightbulbs, ceiling lights; bathtubs, sinks | SECTION 71 - CANCELLED | — |
| 020 | Furniture and interior furnishings, namely, chests of drawers, dressers, bedside cabinets, dressing mirrors, wardrobes, beds, cupboards, tables, chairs, armchairs, sofas, console tables, writing desks, desks, bookcases, furniture for televisions, furniture for hold telephones, mirrors; non-metal portable staircases; Venetian blinds, wooden blinds, panel curtains, indoor blinds, slatted wood blinds, bamboo curtains | SECTION 71 - CANCELLED | — |
| 037 | Building, construction and demolition; consultancy regarding building construction; consultancy in the field of civil engineering relating to the construction of public works and buildings; construction of property; construction of public works; on site building project management; building inspection in the course of building construction; application of surface coatings; bricklaying; laying of cables; pipeline laying; pipe laying; laying and construction of pipelines; installation of road surfaces; plant maintenance; maintenance of property; renovation and restoration of buildings; plumbing and gas and water installation; installation and repair of heating installations and air conditioning installations; installation of kitchens cabinets and kitchen appliances; installation of plumbing sanitary apparatus and installation of bathroom fixtures; installation and maintenance of electric installations, maintenance of alarm installations | SECTION 71 - CANCELLED | — |
| 042 | Urban planning and design of interior decoration, architectural design for interior decoration, design in relation to interior decoration, professional consultancy relating to the design of interior and exterior decoration, furniture design for interior decoration; interior and exterior design services, design of curtains | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by PAOLO CASTELLI S.P.A.
- Other trademarks owned by PAOLO CASTELLI S.P.A.
- Other trademarks owned by PAOLO CASTELLI S.P.A.
- Other trademarks in Class 011
- Other trademarks in Class 020
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named C PAOLO CASTELLI
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 10, 2026 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 18, 2026 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 18, 2026 | INPC | INVALIDATION PROCESSED | — |
| Feb 19, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 16, 2026 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 16, 2025 | C71T | CANCELLED SECTION 71 | — |
| Oct 30, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Mar 1, 2019 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 9, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 9, 2019 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 30, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 30, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 12, 2018 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 26, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 26, 2018 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Aug 14, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 14, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 10, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 25, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 25, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 25, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 6, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 3, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 2, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 2, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 11, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 11, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 11, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 1, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 31, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 31, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 27, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 8, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 8, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 2, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 30, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 29, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 27, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 27, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 20, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |