USPTO serial 79206901
GREEN PIN
Reviewed by CopyMark Law Group
Reg. 5440465Status 706Registered
- Filing date
- Status date
- Registration date
- Apr 10, 2018
- Examiner
- O'BRIEN, JENNIFER LYNN
- Law office
- Historical data usage
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with GREEN PIN?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Roberto Ledesma
Roberto Ledesma Law Office of Roberto LedesmaP.O. Box 230692New York, NY 10023United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Goods made of common metal, namely, shackles for lifting and rigging and thimbles, namely, Rope thimbles of metal, Cable thimbles of metal; clips for wire ropes and rigging screws, all of common metal; wire rope riggings; cables and cable joints of metal, non-electric; Metal chains, except for vehicles; Belts of metal for handling loads, namely, hoisting belts; Non-electrical cables and wires of common metal; Metal pipe couplings and joints, namely, swivels; Metal hooks; Metal tightening screws; anchors; Metal bolts; eyebolts; Metal screws; Metal nuts; nails; Metal turnbuckles; Metal turnbuckles cable clamps; load stretchers in the nature of cable stretchers and cincture stretchers of metal and metal plate clamps; Metal rivets; links, namely, tension links of metal; link assemblies, namely, Pre-fabricated metal building assembly kits, tension links of metal; Tension links of metal, namely, chain repair links; Sleeves, namely, Cable junction sleeves of metal, Metal junction sleeves for non-electric cables; Metal pipe couplings and joints, namely, pivots; Metal load binders in the nature of lever type load binders, ratchet type load binders and spring type load binders; Straps of metal for load handling and harnesses of metal for handling loads; identification tags of metal; metal blocks, namely, wire rope blocks for lifting and rigging; galvanized malleable iron blocks in the nature of wire rope blocks for lifting and rigging; snatch blocks in the nature of wire rope blocks for lifting and rigging; cargo blocks in the nature of Cargo slings of metal, Wire rope fittings of metal, namely, metal sockets | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 19, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Nov 26, 2024 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Nov 26, 2024 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Nov 18, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 2, 2024 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Apr 10, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 23, 2019 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Nov 1, 2019 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Aug 24, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 31, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 30, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 10, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 10, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 23, 2018 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 23, 2018 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 19, 2018 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jan 3, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 3, 2018 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 3, 2018 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 11, 2017 | ALIE | ASSIGNED TO LIE | — |
| Nov 30, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 30, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 30, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 30, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 30, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 1, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 31, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 31, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 8, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 17, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 16, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 9, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 8, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 31, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| May 13, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 9, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 5, 2017 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| May 4, 2017 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |