USPTO serial 79207275
EP POWER EUROPE
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- —
- Examiner
- MEIER, SHARON A
- Law office
- TMO LAW OFFICE 112 - EXAMINING ATTORNEY ASSIGNED
What this means
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
Need help with EP POWER EUROPE?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | Electricity, electrical energy, including electricity and electrical energy generated from renewable sources; coal; natural gas; none of these products being meant to the nuclear energy industry | ACTIVE | — |
| 009 | Power installations (other than generators) for distributing electricity, gas and fluids; switchboxes (electricity); distribution boxes (electricity); switches; electricity conduits; none of these products being meant to the nuclear energy industry | ACTIVE | — |
| 035 | Purchase and sale of energy; import and export of electricity, gas, coal, solid, liquid and gaseous fuels; procurement and intermediary activities in the field of a trade with energy (electricity, heat, hot water, steam); none of these services being meant to the nuclear energy industry | ACTIVE | — |
| 036 | Financial services relating to the brokerage of energy and fuels; none of these services being meant to the nuclear energy industry | ACTIVE | — |
| 037 | Extraction and mining services; installation services, in particular maintenance, repair, construction, restoration and refurbishment of electrical equipment and distribution of electricity; none of these services being meant to the nuclear energy industry | ACTIVE | — |
| 039 | Storage, distribution, transport and supply of electricity, natural gas, heat, water, energy, fuels and illuminating materials; none of these services being meant to the nuclear energy industry | ACTIVE | — |
| 040 | Production of energy (electricity, heat, hot water, steam), treatment of the aforesaid substances; energy supply services included in this class, namely, the production of electricity and gas, processing and treatment of gas, natural resources and fuels for the production of energy, electricity, heat, water and steam; consultancy in the field of the aforesaid services; energy generation consultancy; none of these services being meant to the nuclear energy industry | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by EP Power Europe, a.s.
- Other trademarks in Class 004
- Other trademarks in Class 009
- Other trademarks in Class 035
- Other trademarks in Class 036
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Similar marks named EP POWER EUROPE
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 15, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Mar 1, 2019 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 30, 2019 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 30, 2019 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Nov 2, 2018 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Oct 17, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 17, 2018 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Apr 30, 2018 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Apr 26, 2018 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jan 30, 2018 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jan 30, 2018 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jul 21, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 4, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 4, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 1, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 31, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 17, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 13, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| May 13, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 11, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |