Drawing for IQ-CHAIN

USPTO serial 79207344

IQ-CHAIN

Reviewed by CopyMark Law Group

Reg. 5440492Status 708Registered
Filing date
Status date
Registration date
Apr 10, 2018
Examiner
MICHELI, ANGELA M
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with IQ-CHAIN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Melanie I. Rauch

Melanie I. Rauch Setter Roche Smith & Shellenberger LLP1860 Blake StreetSuite 500Denver, CO 80202

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; wrought common metals and alloys of metal; shelter structures and transportable buildings of metal; metal cable trays used in building construction; metal cladding for construction and building; construction elements made of metal, namely, fabricated metal components for building foundations; construction elements made of metal, namely, shores; building elements of metal in the form of doors, gates, fire resistant doors, windows, window shutters and frameworks; metal profiles and tubes for metal doors; tubes of metal; tubes of steel; corrugated pipes made of metal; assembled structural parts, namely, building wall framework, mouldings and profiles made of metal; sheet metal; sheet metal in the form of stop tubes, thermally insulated tubes and profiles; door and window fittings made of metal; door frames and window frames made of metal; profiles and tubes for door frames and window frames made of metal; skirting boards and covering strips made of metal; posts and trellis posts of metal; plant holders and climbing supports for plants made of metal; climbing supports for plants made of metal for fruit-growing and viticulture; fences of metal; wire fences; game fences and game enclosures made of metal; latticework of metal; non-electric wires of common metal; wire nets and wire mesh made of metal; wire nets and wire mesh made of metal as hail protection; metal hardware, namely, nuts, pulleys, springs, washers, nails, drawer pulls, knobs; metal turnbuckles; metallic profiles for racks; metallic racks and metallic shelves therefor used for commercial storage and not for use as furniture; joists and screws of metal for connecting racks; metal storage shelters and metal doors therefor; assembled structural parts, mouldings and profiles made of metal and sheet metal in the form of crash barriers, guard rails, guide barriers, guiding walls, sliding walls, protective walls, noise barriers and screen walls for roads; vertical crash barriers of metal for roads and other traffic areas; surveying equipment, namely, metal street boundary markers for topographical use; non-luminous and non-mechanical metal signs; metal bollards; vehicle crash barriers made of metal for roads; marking nails and marking studs made of steel for marking roadwaysACTIVE—
008[ Hand-operated implements and tools for treatment of materials, and for construction, repair and maintenance, namely wrenches, saws, cutting tools, hand drills, sanders; hand-operated fastening and joining tools, namely, screwdrivers, hammers, riveting tools, clamps, staple guns; screw wrenches ]SECTION 71 - CANCELLED—
042Engineering services; planning of buildings and infrastructure systems for buildings; planning and layout design services for cleanroom environments, interior spaces of retail business establishments; urban design planning services; industrial design servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 5, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jan 22, 2026XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Jan 22, 2026XXCRGENERIC MADRID TRANSACTION CREATED—
Jul 26, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 26, 2024NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Nov 26, 2024C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Nov 25, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Apr 10, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Apr 10, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 30, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 30, 2022ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Nov 30, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 30, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 24, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 30, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 30, 2018FIMPFINAL DISPOSITION PROCESSED—
Jul 10, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 10, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 23, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jan 23, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 19, 2018GPNXNOTIFICATION PROCESSED BY IB—
Jan 3, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 3, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jan 3, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Dec 11, 2017ALIEASSIGNED TO LIE—
Nov 30, 2017CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 30, 2017XAECEXAMINER'S AMENDMENT ENTERED—
Nov 30, 2017GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 30, 2017GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 30, 2017CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 8, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 8, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 8, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 24, 2017RFNPREFUSAL PROCESSED BY IB—
Jun 3, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 3, 2017RFRRREFUSAL PROCESSED BY MPU—
May 20, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 19, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 19, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
May 15, 2017DOCKASSIGNED TO EXAMINER—
May 15, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 11, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance