USPTO serial 79208046
M METKA
Reviewed by CopyMark Law Group
Reg. 5314426Status 709
- Filing date
- Status date
- Registration date
- Oct 24, 2017
- Examiner
- IM, JEAN H
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with M METKA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Pipe muffs of metal, ducts of metal for ventilating and air conditioning installations, ducts of metal, for central heating installations; ducts and pipes of metal for central heating installations; pipes of metal, for central heating installations, tanks of metal, namely storage tanks of metal; reservoirs of metal, reinforcing materials of metal for concrete; foundry chill molds of metal, tiles of metal for building, binding screws of metal for cables, non-electric; cables of metal, non-electric; clips of metal for cables and pipes; platforms, prefabricated, of metal, silos of metal, soldering wire of metal, wall claddings of metal for building, water-pipes of metal, lintels of metal, rails of metal, metal railway turntables, railway sleepers of metal; railroad ties of metal, street gutters of metal, portable and modular buildings of metal; buildings transportable, of metal; building boards of metal; building panels of metal | SECTION 71 - CANCELLED | — |
| 007 | Compressed air engines not for land vehicles, compressed air machines, compressed air pumps, air condensers, wind turbines, cranes being lifting and hoisting apparatus, generators of electricity, pumps being parts of machines, engines and motors; pumps being machines, electric pumps; thermic lances being machines for heating and melting steel, torque converters other than for land vehicles, catalytic converters, fittings for engine boilers, namely steam boilers; integral component parts for steam engine boilers, pressure reducers being parts of machines, pressure regulators being parts of machines, couplings other than for land vehicles, turbines other than for land vehicles, hydraulic turbines | SECTION 71 - CANCELLED | — |
| 037 | Machinery installation, maintenance and repair, factory construction, burner maintenance and repair, road paving, building and factory construction information, masonry, laying of cable, underwater construction, motor vehicle maintenance and repair | SECTION 71 - CANCELLED | — |
| 042 | Technical project engineering studies, mechanical research, styling in the nature of industrial design, construction drafting, technical engineering research, surveying, industrial design | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by "METKA INDUSTRIAL-CONSTRUCTION SOCIETE ANONYME" with the distinctive title "METKA"
- Other trademarks owned by "METKA INDUSTRIAL-CONSTRUCTION SOCIETE ANONYME" with the distinctive title "METKA"
- Other trademarks owned by "MYTILINEOS SOCIETE ANONYME- GROUP OF COMPANIES" and the distinctive title "MYTILINEOS HOLDINGS S.A."
- Other trademarks owned by "METKA INDUSTRIAL-CONSTRUCTION SOCIETE ANONYME" with the distinctive title "METKA"
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named M METKA
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 8, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 31, 2025 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 30, 2025 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Mar 29, 2025 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Jan 11, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 10, 2024 | C71T | CANCELLED SECTION 71 | — |
| Jun 14, 2018 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Mar 30, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 29, 2018 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Jan 29, 2018 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Jan 24, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 24, 2017 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 8, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 19, 2017 | NPUB | NOTICE OF PUBLICATION | — |
| Jul 1, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jun 29, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 28, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 28, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 28, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 14, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jun 14, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jun 2, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jun 1, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 30, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 26, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| May 26, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 25, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |