Drawing for C2C

USPTO serial 79209180

C2C

Reviewed by CopyMark Law Group

Reg. 5699741Status 709
Filing date
Status date
Registration date
Mar 19, 2019
Examiner
MESSICK, TABITHA LEE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with C2C?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Gary W. Donohue

Gary W. Donohue Dinsmore & Shohl LLP755 West Big Beaver RoadSuite 1900Troy, MI 48084

Goods and services

ClassDescriptionStatusFirst use
007Chemical machinery, namely, industrial steel making machinery and steel mills for the manufacture of steel; Chemical machinery, namely, steel converters for decarburizing pig iron by means of blowing refines oxygen; Chemical machinery, namely, ladle treatment equipment in the nature of injection systems to inject reagents to molten steel, vacuum treatment for carbon deoxidation, dedusting and alloying systems, for ladle furnaces to be used in steelworks and steelmills; Chemical machinery, namely, vacuum treatment equipment for metallurgical vacuum treatment of molten steel using steel converters; Chemical machinery, namely, continuous slab casting machines or ingot casting machines; gas turbine power and steam turbine power electricity generation equipment consisting primarily of generators, low-pressure and high-pressure turbines, not for land vehicles; coal cutting mill machines; electrolysis machinery, namely, an electrolysis chamber to separate water into hydrogen and oxygen for increasing efficiency for use in internal combustion engines, turbines and air turbines, not for land vehiclesSECTION 71 - CANCELLED—
011Hot blast furnaces for pig iron production, for industrial purposes; gas pipeline systems, namely, switchable separators for the cleaning and purification of gases, smelting gases, coke-oven gases, blast furnace top gases, converter gases, process gases, as well as mixed gases and utility gases composed from the specified gases which occur in pig iron production, crude steel production, and/or coke production; machinery for hydrogen production, namely, hydrogen generators; machinery for ammonia synthesis and urea synthesis, namely, electrochemical gas generator for producing ammonia and urea, and gas purification machines for chemical liquefaction and separation for the transformation and production of the basic chemical compounds ammonia and urea; thermal oxidizers for industrial air pollution control, namely, machinery for converting carbon monoxide proportions of a smelting gas by means of a water-gas shift reaction or a steam reforming with water vapor or a partial oxidation with air and/or oxygen; separators for the cleaning and purification of gases, namely, machinery for separating process gases in a gas mixture by means of a pressure swing adsorption; gas purification machines, namely, machinery for gas purification and gas conditioning of utility gases, and facilities consisting thereof, for yielding, treatment, recovery, and/or production of chemical products from industrial exhaust gas emissions and/or synthesis gases, which contain the components of the respective end product, particularly of ammonia, methanol, or other hydrocarbon compounds, as well as biotechnological facilities for fermenting synthesis gases; emission control systems consisting primarily of machinery and apparatus for reducing and processing gases that are harmful to the climate in steel production in particular in integrated steel mills; coke-oven machinery for producing coke and raw gas from coal by means of a distillation process, consisting primarily of industrial ovens for coke making with oven roofs for filling coke-oven batteries with coal and coke extinguisher equipment for quickly extinguishing and cooling produced coke; water cooling towers for gas turbine power plants and steam turbine power plants for electricity generationSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 29, 2026NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 1, 2026CHLDCHANGE OF OWNER RECEIVED FROM IB—
Aug 27, 2026RNWLINTERNATIONAL REGISTRATION RENEWED—
Jun 3, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 3, 2025C71TCANCELLED SECTION 71—
Aug 7, 2025CHLDCHANGE OF OWNER RECEIVED FROM IB—
Apr 4, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 4, 2024ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Apr 4, 2024EWORTEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED—
Apr 4, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 4, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Apr 4, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 4, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Mar 19, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jul 26, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 10, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 10, 2019FIMPFINAL DISPOSITION PROCESSED—
Jun 19, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 19, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 10, 2019ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Jan 10, 2019CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Jan 9, 2019APETASSIGNED TO PETITION STAFF—
Dec 14, 2018EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Nov 23, 2018OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Nov 7, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 7, 2018OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Nov 1, 2018ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Oct 2, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 2, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 28, 2018GPNXNOTIFICATION PROCESSED BY IB—
Sep 12, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 12, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 12, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 27, 2018ALIEASSIGNED TO LIE—
Aug 16, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 16, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Aug 16, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 16, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 16, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 11, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 10, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 10, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 11, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 11, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 11, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 18, 2017TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 18, 2017CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 18, 2017TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 29, 2017ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 29, 2017REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 8, 2017RFNTREFUSAL PROCESSED BY IB—
Jun 19, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 19, 2017RFRRREFUSAL PROCESSED BY MPU—
Jun 12, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 11, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 10, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 6, 2017DOCKASSIGNED TO EXAMINER—
Jun 6, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 1, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance