USPTO serial 79209496
SENSIA ARENA
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- May 12, 2020
- Examiner
- GUTTADAURO, JULIE MARIE
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with SENSIA ARENA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*
Plus Government fees of $850
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Martin R. Geissler
Martin R. Geissler Muncy, Geissler, Olds & Lowe, P.C.4000 Legato RoadSuite 310Fairfax, VA 22033Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Electrotechnical, electronic, optoelectronic and acoustic equipment, apparatus and installations composed thereof for monitoring, controlling and regulating water supply and drainage, treatment, availability, distribution, removal and heating of drinking and commercial water; equipment and apparatus for monitoring, measuring, controlling and regulating pressure, temperature and flow rate quantities of water in water conduit installations, containers and sanitary installations; thermostats, electrical power devices, namely, taps, thermostat components and assemblies for cold water and hot water mixer valves, parts and fittings therefor; downloadable mobile applications for operating toilets, water taps, lightning and public address (PA) systems; electronic devices for monitoring and transmitting health data; downloadable mobile applications for health monitoring, sensors for moisture, flooding, leak monitoring, water control and water quality; fire sprinklers; downloadable cloud-based network monitoring software; computer hardware; apparatus and equipment for recording, reproduction or modification of sound, images and data; sound, data for shower toilet systems recorded in electronic, optical and magnetic form; microprocessors; integrated circuits; downloadable and recorded computer programs for use in database management in the field of toilet systems; apparatus and instruments for recording, processing, receiving, reproducing, transmitting, modifying, compressing, decompressing, radio transmission, merging and editing of data; downloadable and recorded computer software programs being algorithms for the compression and decompression of data; component parts for all the aforesaid goods | ACTIVE | — |
| 011 | Apparatus for regulating water supply and sanitary purposes, including for the kitchen, namely, metered valves; sanitary fittings, fixtures and fittings for water supply, water heating, bath, shower, washing, dish-washing, bidet and toilet installations and for the water intake and drainage of such installations, the aforesaid fixtures and fittings, including digital and touch-controlled , namely, toilet control valves, shower sprayers; hot and cold water mixer fittings, namely, mixer faucets for shower toilets; water run-off and overflow fittings , namely, toilet overflows; taps being faucets for washstands, tubs, showers and bidets; showers, hand showers and overhead showers, shower fittings in the nature of shower escutcheons, shower heads, shower faucets, shower control valves, shower mixing valves, shower drains, shower arms massage showers, spray nozzles and spray shower heads for the aforesaid goods; shower head holders; tubes being flexible pipes being parts of shower plumbing installations and tube connections in the nature of toilet control valves for the aforesaid showers; shower panels; complete shower and bath wash cubicles, shower trays, shower basins, shower cubicles, shower systems comprised primarily of shower heads, hand shower, and wall mount; shower apparatus in the nature of shower rail sets;, shower and bath installations in the nature of wall holder for hand shower, shower rails; shower and bath cubicles, electronically controlled self-closing shower-taps; the aforesaid water supply and sanitary fittings being thermostat and non-contact controlled fittings , namely, faucets and drain sockets; taps for sink units; water shower mixers being plumbing fixtures; sanitary plumbing fittings, namely, shower mixing valves, regulating valves, shut-off valves and water inlets and outlets in the nature of water faucets; water softening apparatus and installations; sanitary furnishings, namely, wash-hand basins being parts of sanitary installations, sinks, bath tubs, bath tubs for sitz baths; parts and fittings for all the aforesaid goods; installations and apparatus for regulating water supply and sanitary purposes; water closets; toilet bowls; toilet bowls with integrated water jets; flushing devices for toilets and urinals; water cisterns; urinals; valves being parts of sanitary installations; bidets; toilet seats; multiple function toilets with integrated devices for washing, drying and deodorising of the user and heating of the toilet seat; toilets with integrated shower functions, adjustable in position, water temperature and water pressure; toilets with sterilizing functions; disinfectant dispensers for toilets; sanitary covers for toilet seats in the nature of plastic; toilet cisterns; flush levers for toilets; ball taps being parts of water closet tanks, level controlling valves in tanks, parts of water closet tanks, toilet stool units, toilet stool units with a washing warm water squirter; toilets incorporating cisterns; toilet seats; toilet seat lids; driers, namely, warm air dryers, air cleaning units; showers; electric night lights; parts and fittings for the aforesaid goods | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 24, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| May 12, 2025 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 27, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 3, 2020 | FINV | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 12, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 12, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 12, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 10, 2020 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 12, 2020 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 25, 2020 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 25, 2020 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 5, 2020 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 5, 2020 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 5, 2020 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 22, 2020 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 17, 2020 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 16, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 16, 2020 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 22, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 22, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 22, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 15, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 14, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 14, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 11, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 30, 2018 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Nov 14, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 14, 2018 | GEAN | NOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Nov 14, 2018 | GEAP | EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Nov 14, 2018 | EPEN | COMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION AUTOMATIC ENTRY | — |
| Nov 14, 2018 | CPEA | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED | — |
| Nov 14, 2018 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 25, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 24, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 24, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 9, 2018 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 9, 2018 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 9, 2018 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 9, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 8, 2018 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 8, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 8, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 20, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 11, 2017 | RFNP | REFUSAL PROCESSED BY IB | — |
| Jul 21, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 21, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 17, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 16, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 16, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 12, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 12, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 8, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |