USPTO serial 79210443
MAEDAKOSEN
Reviewed by CopyMark Law Group
Reg. 5415161Status 707Registered
- Filing date
- Status date
- Registration date
- Mar 6, 2018
- Examiner
- NGUYEN, NICOLE A
- Law office
- —
What this means
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
Need help with MAEDAKOSEN?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mark D. Passler
Mark D. Passler Blank Rome222 Lakeview Avenue, 14th FloorWest Palm Beach, FL 33401United StatesGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 017 | [ Floating anti-pollution barriers; floating booms for oil containment or coastal restoration; chemical fibers, not for textile use, namely, chemical fibers for use in the reinforcement of plastics; synthetic fibers, not for textile use, namely, synthetic fibers for use in the reinforcement of plastics; regenerated fibers, namely, cellulose; aramid fibers, not for textile use, namely, aramid fibers for use in the reinforcement of plastics; rock wool; carbon fibers not for textile use; chemical fiber yarn and thread not for textile use; insulating gloves; rubber cords and laces; industrial packaging containers of rubber; rubber stoppers for industrial packaging containers; semi-worked synthetic plastic as semi-finished products in the form of bars, blocks, boards, pellets, rods, tubes, foils, foams, fibers, films and sheets; raw or semi-worked rubber; soundproofing materials of rock wool not for building purposes ] | SECTION 71 - CANCELLED | — |
| 019 | [ Non-metallic minerals for building or construction; ceramic building materials, bricks and refractory products, namely, ceramic tiles, ceramic pavers, ceramic blocks, ceramic bricks for use in refractory furnaces, ceramic piles, ceramic moldings, ceramic columns for use as building materials, ceramic domes, ceramic panels, ceramic poles for use as building materials, ceramic posts, ceramic protective sealing coatings sold as an integral component of ceramic building materials, ceramic rails, ceramic slabs for building, nonmetal reinforcements for concrete and wood building construction, namely, ceramic rods, ceramic plates and ceramic bars, ceramic door frames, all for flooring, walls, ceiling, facing, facade, mosaic panels, and sanitary building purposes; ] plastic materials for use in civil engineering, namely, plastic materials for reinforcement, drainage, namely, plastic in bars, blocks, pellets, rods, sheets, tubes or extruded form for general industrial or manufacturing use; synthetic resin materials for exclusive use in civil engineering, namely, synthetic-resin reinforcing material not of metal for building purposes, synthetic-resin adhesive mortar for building purposes, synthetic-resin agricultural nets for erosion control, synthetic-resin fences; textiles materials for use in civil engineering, namely, nonwoven textiles made of synthetic fibers for use in the building industry as protective layers, textile reinforcing materials not of metal for building, textile revetments for erosion control, textiles sandbags; [ concrete materials for use in civil engineering, namely, concrete reinforcing materials not of metal for building, concrete walls, concrete revetment for erosion control, concrete surface protective materials in the nature of concrete panels; asphalt, and asphalt building or construction materials, namely, asphalt fences, asphalt guardrail, asphalt pergolas not primarily of metal, exterior asphalt louvers as building materials, asphalt decks, asphalt floor boards, asphalt guard fence; rubber building or construction materials, namely, rubber fences, rubber guardrail, rubber pergolas, rubber louvers, rubber decks, rubber floor boards, rubber guard fences; building materials made of linoleum for fixing to existing walls or floors, namely, tiles for walls or floors; ] plastic building materials, namely, plastic fences, plastic guardrail, plastic pergolas, exterior plastic louvers as building materials, plastic decks, non-metal floors comprised primarily of plastic for office buildings, outdoor use, plastic guard fences, plastic brackets for building; [ epoxy grout; grout; decorative boards for building made mainly of synthetic resin; synthetic resin window sashes; synthetic resin floor tiles; synthetic resin floor boards; dedicated synthetic building materials for walls or wall materials exclusively for building use in the nature of wall panels not of metal; fabrics for use in civil engineering, namely, geotextiles; buildings, not of metal, namely, gazebos, sheds; erosion control mats integrating plants seeds; cement and its products, namely, cement fences, cement guardrail, cement pergolas, exterior cement louvers as building materials, cement decks, cement floor boards, cement guard fences; building timber; building glass; ] non-metal artificial fish reefs; [ non-metal molds for forming cement products, namely, cement posts and cement walls; unworked or partly worked non-metallic mineral materials for building or construction ] | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by MAEDA KOSEN CO., LTD.
- Other trademarks owned by MAEDA KOSEN CO., LTD.
- Other trademarks owned by MAEDA KOSEN CO., LTD.
- Other trademarks in Class 017
- Other trademarks in Class 019
- Similar marks named MAEDAKOSEN
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 29, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Apr 29, 2026 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Apr 29, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 29, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 12, 2026 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| May 2, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 17, 2024 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 8, 2024 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Aug 8, 2024 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Jul 31, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 30, 2023 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Nov 30, 2023 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Nov 29, 2023 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Apr 26, 2023 | PRAM | POST REGISTRATION ACTION MAILED - SEC. 7 | — |
| Apr 25, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 6, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jan 1, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 3, 2022 | ES7R | TEAS SECTION 7 REQUEST RECEIVED | — |
| Jul 14, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 12, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 12, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 6, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 6, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 15, 2018 | LIME | LIMITATION FROM THE IB - REQUEST EXAM REVIEW | — |
| Feb 2, 2018 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Dec 19, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 15, 2017 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 12, 2017 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 12, 2017 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 29, 2017 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Nov 29, 2017 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 29, 2017 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 15, 2017 | ALIE | ASSIGNED TO LIE | — |
| Nov 7, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 17, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 17, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 17, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 28, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 12, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 12, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 4, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 3, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 1, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 27, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 27, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 23, 2017 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jun 22, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |