Drawing for MARTI

USPTO serial 79210672

MARTI

Reviewed by CopyMark Law Group

Reg. 5494488Status 708Registered
Filing date
Status date
Registration date
Jun 19, 2018
Examiner
O'BRIEN, JENNIFER LYNN
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with MARTI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steven J. Solomon

Steven J. Solomon Tucker Ellis LLP950 Main Avenue, Suite 1100Cleveland, OH 44113United States

Goods and services

ClassDescriptionStatusFirst use
001[ Chemicals for use in industry, particularly additives used in the construction industry; construction chemistry products, namely, chemical agents for the protection, stabilization or improvement of structures and materials in the building industry, civil engineering and underground works sectors; chemicals used in science; unprocessed synthetic resins, unprocessed plastics; adhesives used in industry, particularly for the building industry and the construction of plants and facilities ]SECTION 71 - CANCELLED—
006[ Common metals and their alloys, unwrought or semi-wrought; metal building materials, namely, building panels of metal, building boards of metal, brackets of metal for building, ceiling boards and floor boards, fascia; reinforcement steel; metallic pipes and tubes other than parts of machines, particularly bore hole tubing, metal reinforcement materials and sheet piles for building purposes; prefabricated elements for permanent or temporary steel structures, namely, prefabricated metal platforms and prefabricated metal buildings; transportable buildings of metal; metallic materials for railway tracks; non-electric metal cables and wires of common metal; material of irons and steels and small items of metal hardware, namely, springs, washers, nuts, pulleys, brackets for general use; goods of steel, particularly anchors, steel anchor plates and steel accessories, namely, steel rebars, rods and mesh, all for the execution of rock supporting works and the centering and the fixing of drill bits and welded or shaped steel for construction purposes; ores of metal ]SECTION 71 - CANCELLED—
007[ Machinery and machine tools, namely, machines and machine tools for the cutting and forming of materials, drilling machines, powered machines for cutting or shaping or finishing metals or other materials, metalworking machine tools; mechanically operated tools being parts of machines, particularly drill bits and button bits, namely, power drill bits for construction purposes; ] motors [ and engines ] except for land vehicles; machine coupling and transmission components except for land vehicles; transporting equipment, namely, [ pneumatic transporters, lifting installations for the transport of persons and goods, and ] structural components of [ the aforesaid transporting equipment and of ] conveyor belts [ ; lifting devices, namely, mechanical and hydraulic lifts, cranes and elevators including elevator gears for heavy loads in the construction industry ]ACTIVE—
009[ Scientific, surveying, optical, weighing, measuring, signaling and checking apparatus and instruments, namely, surveying machines and instruments, optical inspection apparatus, weighing apparatus and instruments, level measuring machines as well as telemetry apparatus for recording, transmission or reproduction of data with respect to surveying and monitoring weights, displacements, pressures and tensions in structures, and for measuring and monitoring dumping sites, soils and sub-soils; electronic monitoring and regulating installations for construction and building sites, namely, energy meters for tracking and monitoring energy usage, voltage regulators, illumination regulators; control systems for construction machinery and plants, particularly for conveyor belts and transporting equipment as well as for processing plants for constructional materials, namely, electronic control systems for engines, electronic control systems for machines; apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, namely, switch cabinets; data processing equipment and computers as well as their peripherals and software for use in displaying telemetry data, all in the construction field; telecommunication networks and their peripherals, particularly for building sites, namely, telecommunications and data networking hardware in the nature of telecommunication exchangers, multiplexers, cables, switches and base stations; fire extinguishing apparatus; protective devices for emergency exits and for personal protection, namely, protection masks, protective spectacles, protective clothing especially made for use in processing plants for protection against accident or injury, clothing for protection against accidents, protective gloves for industrial use, protective helmets; installations and devices for locating persons, namely, electronic devices for locating and tracking people using global positioning systems or cellular communication networks; computer hardware and software as well as their peripherals for checking of personal admittance to and security of buildings and other places of public access, as well as of construction sites, particularly apparatus for personal identification ]SECTION 71 - CANCELLED—
017[ Rubber, raw or semi-worked, gutta-percha, gum, raw or semi-worked, asbestos, mica; plastics in extruded form for use in further manufacture; packing materials, water proofing materials and insulating materials, particularly waterproofing sheets in the nature of waterproof packings for the building industry; non metallic flexible pipes; waterproofing for the building industry, civil engineering and for underground works, namely, waterproof sealants; joint compounds, namely pipe joint compounds, wallboard joint compounds, and drywall joint compounds; substances for insulating and protecting buildings, namely, monuments, masonry and constructions, against moisture ]SECTION 71 - CANCELLED—
019[ Non-metallic elements of construction and building materials, particularly concrete; building timber; building glass; prefabricated concrete elements, namely, concrete pipes, concrete panels, concrete blocks, concrete walls, concrete beams, concrete floors; concrete piles; non-metallic reinforcements for building purposes; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; non-metallic monuments ]SECTION 71 - CANCELLED—
035[ Business management, business administration services and providing office functions, particularly for joint ventures in the construction industry ]SECTION 71 - CANCELLED—
037Building construction and general contractor services, particularly the carrying out and technical construction supervision, co-ordination and monitoring of ongoing construction works and of construction works relating to projects in [ the building industry, civil engineering, ] foundation works, underground structures and engineering works as well as the construction of plants and facilities, [ and in the field of geo-technology; ] repair and installation services as well as the maintenance and upkeep of structures and installations; [ rental of construction machines and apparatus, namely, conveyor belts, transport installations, processing plant for construction materials and construction site equipment; Waste cleaning services, namely, technological sanitation of dumping grounds, soils and sub-soils, especially of contaminated soils and sites needing rehabilitation; ] construction consulting services relating to projects in the construction industry, civil engineering, underground structures and engineering worksACTIVE—
038[ Telecommunication, namely, providing access to telecommunication networks for construction sites ]SECTION 71 - CANCELLED—
042Engineering design services, namely, development in the nature of construction drafting, project definition, planning of foundation works and underground structures and infrastructure systems therefor, technical appraisal relating to projects in [ the construction industry, ] civil engineering, foundation works, underground structures and engineering works; Engineering drawing services, namely, drawing up of expert reports in the field of [ the construction industry, ] civil engineering, foundation works and underground structures; scientific and technological services, namely, [ research and ] design services in the field of construction, civil engineering, foundation works and underground structures; [ industrial design services, namely, analysis and research services in the field of [ construction, ] civil engineering, foundation works and underground structures; ] design and development of computer hardware and software in the field of the construction industryACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 23, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Feb 11, 2026XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Feb 11, 2026XXCRGENERIC MADRID TRANSACTION CREATED—
Jul 26, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 26, 2024NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Nov 26, 2024C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Nov 18, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
May 8, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 8, 2024ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
May 8, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 8, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
May 8, 2024CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
May 8, 2024COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Apr 3, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Jun 19, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Nov 21, 2019RNWLINTERNATIONAL REGISTRATION RENEWED—
Oct 12, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 22, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 22, 2018FIMPFINAL DISPOSITION PROCESSED—
Sep 19, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 19, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 15, 2018CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Apr 19, 2018RINXUSPTO CORRECTION PROCESSED BY IB—
Apr 19, 2018CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Apr 13, 2018GPNXNOTIFICATION PROCESSED BY IB—
Apr 3, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 3, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 23, 2018RINXUSPTO CORRECTION PROCESSED BY IB—
Mar 23, 2018RINXUSPTO CORRECTION PROCESSED BY IB—
Mar 14, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 14, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 14, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Feb 27, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 23, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Feb 23, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 23, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 23, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 24, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 23, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 23, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 4, 2017CRSNCORRECTION SENT TO IB—
Oct 4, 2017CRCRCORRECTION CREATED FOR IB—
Sep 6, 2017CRSNCORRECTION SENT TO IB—
Sep 6, 2017CRCRCORRECTION CREATED FOR IB—
Aug 25, 2017RFNTREFUSAL PROCESSED BY IB—
Aug 9, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 9, 2017RFRRREFUSAL PROCESSED BY MPU—
Aug 8, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 7, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 31, 2017DOCKASSIGNED TO EXAMINER—
Jun 30, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Jun 26, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 22, 2017SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance