USPTO serial 79210723
Serial No. 79210723
Reviewed by CopyMark Law Group
Reg. 5393593Status 709
- Filing date
- Status date
- Registration date
- Feb 6, 2018
- Examiner
- EISNACH, MICHAEL PATRICK
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with Serial No. 79210723?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal materials for building or construction, namely, metal partitions; prefabricated building assembly kits of metal; metal moulds for forming cement products in the nature of cement posts for building; metal hardware, namely, nuts, bolts, washers; industrial packaging containers of metal; joinery fittings of metal; safe deposit boxes; towel dispensers of metal | SECTION 71 - CANCELLED | — |
| 009 | Photographic apparatus and instruments, namely, cameras; cinematographic apparatus, namely, cinematographic projectors; optical machines and apparatus, namely, optical fibers, optical character readers, optical disk drives; telecommunication machines and apparatus, namely, computers, wireless transmitters and receivers, mobile phones; electron microscopes; computer programs for use in IoT enabled devices for managing, operating and connecting Internet of Things (IoT) enabled devices; electronic door closing control systems comprised of digital door locks; electronic circuits and CD-ROMs recorded with automatic performance programs for electronic musical instruments; electronic publications, downloadable, namely, books, magazines, manuals featuring Internet of Things (IoT) enabled devices; electronic lock assemblies | SECTION 71 - CANCELLED | — |
| 019 | Prefabricated building assembly kits of wood; building timber; building glass; stone sculptures; sculptures of marble; sculptures of concrete | SECTION 71 - CANCELLED | — |
| 020 | Curtain fittings, namely, hooks, rails, rings, rods; metal-substitute plastic fasteners for windows; non-electric locks not of metal; cushions; Japanese floor cushions (zabuton); mattress cushions; furniture; indoor blinds; blinds of reed, rattan or bamboo (sudare); bead curtains for decoration; interior window shades; benches; industrial packaging containers of wood, bamboo and plastics | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Kamarq Holdings Pte. Ltd.
- Other trademarks owned by Kamarq Holdings Pte. Ltd.
- Other trademarks owned by Kamarq Holdings Pte. Ltd.
- Other trademarks in Class 006
- Other trademarks in Class 009
- Other trademarks in Class 019
- Other trademarks in Class 020
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 22, 2025 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 5, 2025 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 5, 2025 | INPC | INVALIDATION PROCESSED | — |
| Apr 23, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 6, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 23, 2024 | C71T | CANCELLED SECTION 71 | — |
| Feb 6, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jun 15, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 11, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 11, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| May 6, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Feb 6, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 21, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Nov 21, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Nov 1, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Oct 3, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 28, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 28, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 28, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 28, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 7, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 7, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 6, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 6, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 4, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 15, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 15, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 8, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 7, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 4, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 30, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 30, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 29, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |