Drawing for KROMATIX

USPTO serial 79210903

KROMATIX

Reviewed by CopyMark Law Group

Reg. 5461339Status 707Registered
Filing date
Status date
Registration date
May 8, 2018
Examiner
GOODSAID, IRA
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with KROMATIX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Gregory B. Coy

Gregory B. Coy Taft Stettinius & Hollister, LLPOne Indiana Square, Suite 3500Indianapolis, IN 46204United States

Goods and services

ClassDescriptionStatusFirst use
009[Electrical cells and batteries;] solar panels for the production of electricity [; solar cells; solar batteries; optical cables and scanners; signal processors; electricity distribution consoles; electric accumulators; electrical conductors; electric switches; electric transformers; voltage regulators; electronic controllers used to reduce power consumption; electricity limiters; electrical conductors, reactors, transformers and transducers; photovoltaic cells and modules; glass covered with an electrical conductor]ACTIVE—
011[Lighting fixtures; heating boilers, elements and installations; steam generators; cooking ovens; refrigerators; refrigerated shipping containers; drying apparatus for use in heating, ventilation systems, air conditioning systems and refrigeration systems; ventilating louvers; water purifying apparatus; heat accumulators; solar collectors; solar collectors for heating; solar-powered cooling units; air conditioning apparatus and installations; water filtering apparatus; water softening apparatus and installations; water purification installations; filters for drinking water; water sterilizers; solar furnaces; water purifying apparatus and machines; air-conditioning, air cooling and ventilation apparatus and instruments]SECTION 71 - CANCELLED—
019[Reinforcing materials, not of metal, for building; non-metallic transportable buildings;] building glass; insulated glass; modified sheet glass for building; laminated flat glass for building; window glass for building; decorative glass for building; colored sheet glass for building; glass tiles other than for roofing; [alabaster glass;] glass blocks for building [; non-metal structures for mounting solar panels]ACTIVE—
037[Building construction; repair and installation services, namely, the installation of heating, cooling and environmental control systems primarily using solar energy, renewable energy resources and rainwater; installation of solar energy systems and alternative energy products for residential and commercial use; installation, maintenance and repair of buildings, glass used in building, glass block, heat accumulators, solar collectors, solar-powered cooling units, [air conditioning apparatus and installations, water filtering and softening apparatus and installations, filters for drinking water, solar furnaces, water purifying apparatus and machines,] photovoltaic cells and modules and glass covered with an electrical conductor; construction, maintenance and repair of installations for the distribution and production of electricity and energy]SECTION 71 - CANCELLED—
042[Scientific and technological services, namely, research and design of electricity and energy production and distribution products; technology planning and consulting in the field of solar energy, specifically specializing in substrates primarily of ceramic, silicon and non-metals for electrical or thermal insulation of solar cells, photovoltaic cells, and solar collectors; design of solar photovoltaic systems; engineering surveying; engineering services, particularly technical project planning and design engineering of installations for the production and distribution of energy; construction drafting; engineering services relating to energy supply systems; consulting services in the fields of energy measurement to improve energy efficiency; energy auditing and advising in conjunction therewith; quality control for others; research in the field of energy]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 16, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jul 14, 2026INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 25, 2026INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jun 25, 2026INPCINVALIDATION PROCESSED—
May 16, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 16, 202671.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
May 13, 2026EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Nov 30, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 14, 2025PR71POST REGISTRATION ACTION MAILED - SEC.71—
Oct 9, 2025LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Sep 30, 2025EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Mar 31, 2025PR71POST REGISTRATION ACTION MAILED - SEC.71—
Mar 11, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 7, 2025CHLDCHANGE OF OWNER RECEIVED FROM IB—
Dec 20, 2024RHRDRESTRICTION OF HOLDER'S RIGHT OF DISPOSAL RECEIVED—
Oct 21, 2024ES71TEAS SECTION 71 RECEIVED—
Apr 28, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 27, 2024LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jan 1, 2024RHRDRESTRICTION OF HOLDER'S RIGHT OF DISPOSAL RECEIVED—
May 8, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 21, 2022INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Nov 29, 2022INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 14, 2022LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Apr 1, 2022ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED—
Mar 29, 2022COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Mar 19, 2022ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Dec 25, 2021LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Jun 26, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 27, 2020CHLDCHANGE OF OWNER RECEIVED FROM IB—
Sep 15, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 22, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 22, 2018FIMPFINAL DISPOSITION PROCESSED—
Aug 8, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
May 8, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 20, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Feb 20, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 31, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jan 15, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 15, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Jan 15, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 15, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 15, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 12, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 12, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 12, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 28, 2017RFNTREFUSAL PROCESSED BY IB—
Jul 13, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 12, 2017RFRRREFUSAL PROCESSED BY MPU—
Jul 7, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 4, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 3, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 3, 2017DOCKASSIGNED TO EXAMINER—
Jul 3, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jun 29, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance