USPTO serial 79212196
VERWATER
Reviewed by CopyMark Law Group
Reg. 5420635Status 709
- Filing date
- Status date
- Registration date
- Mar 13, 2018
- Examiner
- MURRAY, GEORGE WILLIAM
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with VERWATER?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 035 | Business management; business administration; office administrative services; Administrative processing of purchase orders; distribution services, namely, wholesaling store services featuring pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, buildings, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations; business mediation for third parties of contracts and providing business information and advice in relation to the sales, purchase, import and export of pipes, tanks, storage tanks, panels, industrial plants, petrochemical plants, transportable buildings, building materials, storage systems, movable units whether or not mounted, machines, mortar materials and equipment, excavators, automated welding apparatus, blast robots, and water cutting equipment, valves, fittings, pressure and vacuum valves and terminators, instrumentation, thermometers, manometers and transmitters, foam and water systems, fire extinguishing systems; providing business information, including commercial information for consumers relating to prices and availability; commercial information for consumers relating to delivery; consultancy and information regarding the aforesaid services; business organizational and business economical advice also in the context of the purchase of the above-mentioned goods; business advice as well as business management relating to shutdowns and turnarounds of industrial and technical installations, tank terminals and refineries; business management relating to shutdown; information and consultancy relating to the aforesaid services, also provided via electronic networks, including the Internet | SECTION 71 - CANCELLED | — |
| 037 | Construction, repair, installation, overhaul and cleaning services of petrochemical plants, pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, buildings, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations for the purpose of flow technology, power transmission and bearings, sealing and rubber technology, pneumatics, mechanical and electrical power transmission, linear drive technology and motion control, hoisting and lifting technology, business facilities, transport and internal transport, welding and machining technology, on-shore and off-shore business, the flooring industry, the construction of pipelines, sealing industry, food industry, refining industry, marine industry, transportation industry and the construction of infrastructures; repair services of pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, buildings, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations; storage tanks cleaning services; installation services, specifically installation of pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, buildings, valves and fittings, pressure and vacuum valves and terminators, foam and water installations; overhaul services relating to pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, buildings, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations; the aforesaid services also in relation to pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, buildings, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations; assisting and providing advice with respect to repair, installation, overhaul and maintenance of refineries, tank terminals, tanks, storage tanks, panels, industrial plants, petrochemical plants, transportable buildings, building materials, storage systems, movable units whether or not mounted, machines and industrial and petrochemical facilities; building and construction of pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, buildings, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations; excavation of land; excavation of soil prior to soil remediation; repainting; painting services; providing building information; supervision of building construction and construction of pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, buildings, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations; supervision of demolition of pipelines refineries, tank terminals and buildings; information and consultancy relating to the aforesaid services, also provided via electronic networks, including the Internet; Demolition of pipelines refineries, tank terminals, buildings | SECTION 71 - CANCELLED | — |
| 039 | Transporting of goods; storage of goods; transshipment of goods; transport, transshipment and storage of products; transportation services in the nature of jacking and moving of tanks, containers, vessels, storage tanks and oil storage tanks; transport through pipelines; transport, transshipment and storage of liquids; information and consultancy relating to the aforesaid services, also provided via electronic networks, including the Internet; providing information about delivery | SECTION 71 - CANCELLED | — |
| 040 | Material treatment, in particular purification of soils, waste treatment and soil remediation; metal treatment; tube and sheet laser cutting, folding, punching, bending, rolling, welding, milling, turning, polishing and preserving; treatment and processing of materials by matting, polishing, sanding, blasting and sandblasting; treatment and processing of metal surfaces; information and consultancy relating to the aforesaid services; custom manufacturing of pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations; decontamination of hazardous materials; supervision of demolition of tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, valves and fittings, pressure and vacuum valves and terminators, calibration instruments and foam and water installations; Demolition of tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, valves and fittings, pressure and vacuum valves and terminators, calibration instruments and, foam and water installations | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services, namely, scientific research, analysis, testing in the field of construction, repair, installation, overhaul, maintenance, cleaning, painting, repainting, building, construction and demolition and research and design relating thereto; engineering services, namely, engineering in the fields of construction, repair, installation, overhaul, maintenance, cleaning, painting, repainting, building, construction and demolition of of pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations; industrial analysis and research services of new products and services for others; design and development of computer hardware and software; technological consulting services to enable automation; computer programming; design and consultancy relating thereto with respect to premanufacturing and assembly as well as providing technological advice with respect to manufacturing, installation and use of pipelines, refineries, tank terminals, tanks, storage tanks, panels, industrial plants, petrochemical plants, transportable buildings, building materials, storage systems, movable units whether or not mounted, machines, mortar materials and equipment, excavators, automated welding apparatus, blast robots, and water cutting equipment, valves, fittings, pressure and vacuum valves and terminators, instrumentation, thermometers, manometers and transmitters, foam and water systems; technical project planning and advice relating thereto with respect to building and construction development; provision of technical expert reports by engineers and laboratory in the field of pipelines refineries, tank terminals, tanks, storage tanks, containers, pipes, panels, electrical installations, electro-technical installations, machines, buildings, valves and fittings, pressure and vacuum valves and terminators, calibration instruments, foam and water installations; quality control services in the nature of preparation of quality testing standards, certification criteria and assessment guidelines in the field of construction, repair, installation, overhaul, maintenance, cleaning, painting, repainting, building, construction and demolition services; issuing certificates for quality control purposes in the field of construction, repair, installation, overhaul, maintenance, cleaning, painting, repainting, building, construction and demolition services; quality control, monitoring and assurance services; information and consultancy relating to the aforesaid services, also provided via electronic networks, including the Internet | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Tank Bidco B.V.
- Other trademarks owned by Tank Bidco B.V.
- Other trademarks owned by Tank Bidco B.V.
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named VERWATER
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 12, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 24, 2025 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 3, 2025 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Oct 3, 2025 | INPC | INVALIDATION PROCESSED | — |
| May 27, 2025 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 27, 2024 | C71T | CANCELLED SECTION 71 | — |
| Aug 16, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 13, 2023 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jul 20, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 18, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 18, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 13, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 13, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 26, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 26, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 22, 2017 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 6, 2017 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 6, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 6, 2017 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Nov 20, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 20, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 20, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 20, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 20, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 3, 2017 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 3, 2017 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 3, 2017 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 3, 2017 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 20, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 19, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 19, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 14, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 11, 2017 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 8, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 1, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 1, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 31, 2017 | ALIE | ASSIGNED TO LIE | — |
| Aug 18, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 12, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 24, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 24, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 21, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 18, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 17, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 17, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 17, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 13, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |