Drawing for IOT INTELLIGENCE OF TECHNOLOGY

USPTO serial 79212304

IOT INTELLIGENCE OF TECHNOLOGY

Reviewed by CopyMark Law Group

Reg. 5952158Status 709
Filing date
Status date
Registration date
Jan 7, 2020
Examiner
REID, CAILE MAUREEN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with IOT INTELLIGENCE OF TECHNOLOGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Sarah M. Stemer

Sarah M. Stemer Lerner Greenberg Stemer LLPPO Box 2480Hollywood, FL 33022UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Electric devices for monitoring, control and regulation of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations; electronic devices for recording, processing, storing and outputting data for monitoring, control and regulation of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations, and data processing computer software programs therefor; electric measuring, detecting and monitoring instruments and devices, namely, measuring devices for temperature, pressure, volume in the nature of coolant, in tank and closed loop, and refrigerant flow, and vibration, for monitoring, control and regulation of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations; electric sensors; data processing equipment; computer software for remote maintenance and early warning detection of repair and system optimization of heating, ventilating, air conditioning, and refrigerating apparatus and installations, and for monitoring and control of the recorded parameters for service and remote maintenance and derivation of corresponding measures thereof; software used for processing data; parts and accessories for all the aforesaid goods, included in this class, namely, pre-recorded USB flash drives, computer applications, and mobile devices featuring computer software for solutions in the nature of collecting and analyzing data in the field of heating, ventilating, air conditioning, and refrigerating apparatus and installationsSECTION 71 - CANCELLED—
011Air conditioning, heating, ventilating and refrigerating installations and apparatus, namely, process chiller cooling systems in the laser and plastics processing and packaging industries, cooling fan systems for MRI apparatus in the medical industry and heat pump systems for heating buildings; heat pump installations; refrigerating installations; parts and accessories for all the aforesaid goods, included in this class, namely, fans and filters for air conditioning apparatus, valves and boilers for heating systems, ventilation hoods and fansSECTION 71 - CANCELLED—
037Installation, maintenance, and repair of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations; installation, maintenance, and repair of devices for monitoring, control and regulation of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations; providing of information and data in relation to the maintenance, servicing and repair of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations; installation, maintenance, repair and implementation of computer hardware, namely, Remote Access Point (RAP); consultancy and information in relation to the aforesaid servicesSECTION 71 - CANCELLED—
042Engineering services; information technology (IT) consultancy services; scientific research and design; engineering services, namely, technical planning for the development, and system design of, and engineering services for use in conjunction with construction of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations, and parts therefor; engineering services, namely, technical planning for the monitoring, maintenance optimisation, control and regulation of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations, and parts therefor; design and development of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and refrigerating installations, and parts therefor; design and development of devices for monitoring, maintenance optimisation, control and regulation of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations, and parts therefor; development and programming of hardware for others; development of computer hardware and software for monitoring, maintenance optimisation, control and regulation of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations; software development, computer programming and implementation; design of computer software; maintenance and updating of computer software; scientific services, namely, scientific analysis and research in the field of internal system optimization and quality optimization of air conditioning, heating, ventilating and refrigerating installations and apparatus; recording, evaluation, processing and providing of engineering information and data in relation to the monitoring, maintenance optimisation, control and regulation of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations; recording, evaluation and processing of engineering technical information and data in relation to the maintenance, servicing and repair of heating, ventilating, air conditioning and refrigerating apparatus and installations, in particular heat pump installations and cooling installations; technical consultancy in the field of engineering, in connection with technical reliability, monitoring of technical installations, and monitoring and maintenance optimization of process cooling systems, in particular in relation to heating, ventilating, air conditioning and refrigerating apparatus and installations; consultancy and information in relation to the aforesaid servicesSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 24, 2026C71TCANCELLED SECTION 71—
Jan 7, 2025REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 15, 2020FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 8, 2020GPNXNOTIFICATION PROCESSED BY IB—
Apr 18, 2020FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 18, 2020FIMPFINAL DISPOSITION PROCESSED—
Apr 7, 2020FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 7, 2020R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 22, 2019NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 22, 2019PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 2, 2019OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Oct 2, 2019OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Oct 2, 2019NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 16, 2019PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 9, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 9, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 9, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 9, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 20, 2019GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 20, 2019GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 20, 2019CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Mar 8, 2019ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Mar 5, 2019PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Feb 16, 2019CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 15, 2019TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 14, 2019CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 14, 2019TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 5, 2019OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 19, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 19, 2018OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Sep 10, 2018GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Sep 10, 2018GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Sep 10, 2018CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Aug 3, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 3, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 3, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 3, 2018GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 3, 2018GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 3, 2018CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 1, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 1, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 30, 2018ALIEASSIGNED TO LIE—
Jan 17, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 17, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 17, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 12, 2017RFNTREFUSAL PROCESSED BY IB—
Jul 26, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 26, 2017RFRRREFUSAL PROCESSED BY MPU—
Jul 22, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 19, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 18, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 18, 2017DOCKASSIGNED TO EXAMINER—
Jul 18, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 13, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance