Drawing for FLEXISMOKE

USPTO serial 79212340

FLEXISMOKE

Reviewed by CopyMark Law Group

Reg. 5677179Status 709
Filing date
Status date
Registration date
Feb 19, 2019
Examiner
KEELEY, ALISON REBECCA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with FLEXISMOKE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Michelle P. Ciotola

George A. Pelletier Jr. CANTOR COLBURN LLP20 CHURCH STREET FLOOR 22HARTFORD, CT 06103UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, namely, Insulated copper wire, Electric switches, Electric transformers, Electric accumulators, Voltage regulators for electric power; apparatus for recording, transmission or reproduction of sound or images; blank magnetic data carriers, blank recording discs, namely, blank recordable optical discs and blank computer discs; blank compact discs, and blank DVDs; mechanisms for coin-operated apparatus; cash registers, calculating machines, data processing equipment, computers; computer operating software for climate control systems; computer software for opening and closing windows and window shades; computer software for remote control apparatus for air conditioning installations; computer software for remote control apparatus for opening and closing doors; fire- extinguishing apparatus; remote control apparatus for climate control systems and for opening and closing windows and window shades; remote control apparatus for air conditioning installations; remote control apparatus for opening and closing doors; detectors, namely, motion detectors, electronic glass break detectors, smoke detectors, radon detectors, carbon monoxide detectors, carbon dioxide detectors, gas detectors, duct detectors, and filling level detectors; temperature sensors; smoke detectors; hygrometers; carbon dioxide detectors; electric wires and cables; electric locks; acoustic alarms; burglar alarms; fire detectors; fire alarms; electronic control apparatus for pneumatic machines, namely, pneumatic actuators and pyrotechnic gas generators; electric and electronic apparatus and instruments for measuring, control and supervision, namely, remote control apparatus and instruments for the opening and closing of glass panels, opening and closing doors and windows and valves; sensors, namely, sensors for measuring time, rain, moisture, temperature, CO2, wind and sun sensors for the activating of window and door instruments and apparatus; equipment and panels for electronic supervision and operation of said apparatus and instruments, namely, touch panels; electric operating equipment and apparatus, namely, electronic control systems for the regulation and control of interior and exterior screenings for windows, namely, regulation and control of window sunscreens; apparatus, in the nature of computer terminals, interactive touchscreen terminals, wireless transmitter for sending information to a cell phone and tablets and software for monitoring, controlling, transmitting, processing and receiving data concerning ventilation and air conditioning; apparatus in the nature of terminals, interactive touch screen terminals, wireless transmitter for sending information to a cell phone and software for monitoring, controlling, transmitting, processing and receiving data concerning opening and closing of windows, doors, roof vents, ventilators, fans and smoke ventilation systems; electronic touch sensitive control panels; electric sockets, electrical plugs and other electric contactsSECTION 71 - CANCELLED—
011Apparatus for lighting, namely, lighting installations; heating installations, steam generating installations, refrigerating installations; drying apparatus for use in heating, ventilation systems, air conditioning systems and refrigeration systems; air ventilating apparatus for HVAC systems; apparatus for regulating water supply and sanitary purposes, namely, heating and cooling valve actuators in the nature of thermostatic valves; HVAC systems comprising primarily of HVAC units, coils as parts of HVAC installations, fans for HVAC units, refrigerator condensers, furnaces, heat exchangers not being parts of machines, fabric air dispersion ducts for distributing and dispensing air as part of a HVAC system and also containing thermostats, ventilating ducts of metal, condensing unit, refrigerant lines, motors, and parts and accessories therefor; apparatus for ventilating, namely, ventilating apparatus for HVAC systems, namely, ventilating ducts and dampers for commercial and industrial use; air conditioning installations; air filtering installations; ventilating installations for HVAC systems in the nature of air ventilation apparatus; ventilation air conditioning installations and apparatus, namely, air conditioning, air cooling and ventilation apparatus and instruments; fire ventilation installations and apparatus, namely, smoke and heat ventilation installationsSECTION 71 - CANCELLED—
037Construction consultation; roofing installation; glazing of windows; covering services, namely, roofing and insulating services, namely, installation of insulating materials; installing, mounting, maintenance and repair of windows and doors; maintenance and building of pipelines; building construction, repair and installation services relating to HVAC systems, namely, heating, ventilation and air conditioning systems apparatus for ventilating, air conditioning installations, air filtering installations, ventilating installations, air conditioning ventilation installations and apparatusSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 4, 2026INNTTOTAL INVALIDATION PROCESSED BY THE IB—
May 15, 2026INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 15, 2026INPCINVALIDATION PROCESSED—
May 5, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 5, 2025C71TCANCELLED SECTION 71—
Mar 6, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 19, 2024REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 28, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 6, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 6, 2019FIMPFINAL DISPOSITION PROCESSED—
May 19, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 19, 2019R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 5, 2019OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Dec 19, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 19, 2018OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Dec 4, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 4, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 30, 2018GPNXNOTIFICATION PROCESSED BY IB—
Nov 14, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 14, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Nov 14, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 27, 2018ALIEASSIGNED TO LIE—
Oct 17, 2018EXPTEXPARTE APPEAL TERMINATED—
Oct 15, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 15, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Oct 15, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 15, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 15, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 19, 2018EXPIEX PARTE APPEAL-INSTITUTED—
Sep 19, 2018JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Sep 19, 2018EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Sep 18, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 18, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 18, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 19, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 19, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 19, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jan 30, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 29, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 29, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 10, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 18, 2017RFNPREFUSAL PROCESSED BY IB—
Jul 28, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jul 28, 2017RFRRREFUSAL PROCESSED BY MPU—
Jul 22, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Jul 21, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jul 20, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 18, 2017DOCKASSIGNED TO EXAMINER—
Jul 18, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jul 13, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance