USPTO serial 79212488
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Nicholas D. Wells
Nicholas D. Wells Legends Law Group, PLLC330 N. Main St.Kaysville, UT 84037UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building materials of metal, namely, building wall framing made primarily of metal, door frames, window frames, screws, anchors; Transportable metal constructions and construction elements made of metal, namely, shores, supports, braces, beams; containers of metal for storage and transport of goods; portable metal buildings; prefabricated constructions of metal, namely, prefabricated metal buildings; prefabricated houses of metal; Common metals in foil form | SECTION 70 - CANCELLED | — |
| 017 | Building insulation; mineral wool for use as a building insulator; semi-processed artificial materials for use in industry, namely, polyurethane film or polyurethane foam sheeting for use as building insulation | SECTION 70 - CANCELLED | — |
| 019 | Non-metallic building slabs of mineral wool, organic and inorganic fibers, expanded and foamed inorganic materials, concrete and slate; non-metal roofing; non-metallic prefabricated constructions and houses, namely, prefabricated non-metal buildings; Non-metal windows and doors; Non-metal floor panels, namely, floor panels made of PVC, ceramics, stone, and polyester | SECTION 70 - CANCELLED | — |
| 037 | Preparatory services for construction or assembly of buildings, namely, services in the nature of demolition of houses and buildings, construction site cleaning, excavation services, and demolition blasting of rocks in site; site preparation, namely, installing fencing, planning and laying out of residential communities, and foundation contractor services; site drainage, namely, drainage pipe installation; site drilling, namely, metal drilling and perforation; site leveling, namely, excavation services; installation of siding; services of assembling of housing units, namely, steel structure construction works and installation of frames, roofs, facades and walls; installation of building insulation; services for construction or assembly, namely, masonry, installing floor tile, roofing, and carpentry; mounting of facades on buildings; building construction services, namely, mounting of construction elements, namely, frames for buildings, roofs and walls; painting; mounting of wall coverings, namely, wallpapering services; installing floor covering, namely, floors made of organic and inorganic materials, namely, PVC, ceramics, stone and polyester; mounting of glass and mirrors, namely, installation of glass and mirrors; steam cleaning, namely, steaming of facades, roofs and carpet cleaning; sanding of build floor surfaces, namely, floor sanding; cleaning of building exterior surfaces; construction services, namely, planning, laying out and custom construction of residential and commercial communities | SECTION 70 - CANCELLED | — |
| 042 | Engineering; Technology consultation in the field of civil engineering, computer project management, fire resistant solutions, and building design of commercial buildings and houses; Site testing services, namely, testing of materials at construction sites | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 18, 2021 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 15, 2021 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Dec 5, 2020 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 30, 2019 | RINX | USPTO CORRECTION PROCESSED BY IB | — |
| Oct 15, 2019 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jul 27, 2019 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jul 27, 2019 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jun 19, 2018 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Jun 1, 2018 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 19, 2018 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 12, 2018 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Apr 12, 2018 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 2, 2018 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 25, 2018 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 2, 2018 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 8, 2017 | RHRD | RESTRICTION OF HOLDER'S RIGHT OF DISPOSAL RECEIVED | — |
| Nov 17, 2017 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 17, 2017 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 17, 2017 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 4, 2017 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Oct 4, 2017 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 27, 2017 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 7, 2017 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 5, 2017 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 4, 2017 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 4, 2017 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 1, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 1, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 1, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 28, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 27, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 25, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 19, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 19, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 14, 2017 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jul 13, 2017 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |