USPTO serial 79212994
ECOPLUME
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Dec 3, 2019
- Examiner
- O'BRIEN, JENNIFER LYNN
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with ECOPLUME?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Baggerwerken Decloedt En Zoon N.V.
B-8400 Oostende, BE
Other trademarks owned by Baggerwerken Decloedt En Zoon N.V.
Baggerwerken Decloedt En Zoon N.V.
B-8400 Oostende, BE
Other trademarks owned by Baggerwerken Decloedt En Zoon N.V.
Baggerwerken Decloedt En Zoon N.V.
B-8400 Oostende, BE
Other trademarks owned by Baggerwerken Decloedt En Zoon N.V.
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Burton S. Ehrlich
Burton S. Ehrlich LADAS & PARRY LLP224 S. Michigan Ave.Suite 1600Chicago, IL 60605Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Scientific, nautical, surveying, weighing, measuring, signalling, checking, supervision apparatus and instruments relating to hydraulic engineering works, dredging technologies and land reclamation activities, namely, apparatus and instruments for the measuring and registration of the reaction of the environment on the activities of dredging, surveying instruments; apparatus for recording, transmission or reproduction of sound or images, namely, sonars and echosounders; computer software for analyzing sea-beds; computer software for providing measurement of soil, particularly apparatus and instruments for bottom research during the dredging process; artificial intelligence (A.I.) software to control the dredging operations; electric, electronic, computer, control and monitoring equipment for dredging installations and apparatus, namely, programmable electronic controllers and electronic apparatus for the remote control of industrial operations | SECTION 71 - CANCELLED | — |
| 037 | Dredging and land reclamation; construction of harbours and underwater harbour construction; marine construction, namely, deepening and extension of ports and waterways; maintenance of dredging machines; maintenance and repair of dredging equipment and vessels; marine construction preparation and supervision service relating to dredging and land reclamation operations; sand wave dredging in open sea; construction services, namely, construction of and supervising of road, water and tunnel construction works; dredging, namely, foundation and embankment dredging works for barrage constructions; marine construction, namely, coast and bank construction of and strengthening construction works; construction, repair and installation of offshore structures, namely, decommissioning or rejuvenation of offshore structures; construction services, namely, trenching, backfilling and landfall construction for installation of pipelines; drilling of wells; construction supervision, namely, supervision of installation of hydraulic equipment; extraction of marine gravel and sand for the construction industry; construction services, namely, building of artificial islands and peninsulas; construction of water-retaining dykes | SECTION 71 - CANCELLED | — |
| 040 | Rehabilitation, replenishment and nourishment of beaches in the field of coastal reinforcement in the nature of environmental remediation services, namely, treatment of soil and water; treatment of contaminated soil and sludge; oil well treatment in the nature of treatment of oil spills, namely, oil recovery; sanitation of grounds in the field of coastal reinforcement in the nature of environmental remediation services, namely, treatment of soil, waste and water | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services, namely, evaluating, reporting, survey and research in the fields of hydraulic engineering works, dredging technologies and land reclamation activities; scientific and technological researches in the field of environmental dredging; hydraulic engineering services, namely, evaluations, estimates, research, survey and reports relating to dredging and land reclamation activities; technical consultancy services in the field of environmental science, engineering services and design for others in the field of environmental engineering, namely, relating to dredging, land reclamation activities and auxiliary works; scientific research in the field of soil remediation and sludge treatment; research and development of computer programs and software in the field of dredging technologies and land reclamation activities | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Baggerwerken Decloedt En Zoon N.V.
- Other trademarks owned by Baggerwerken Decloedt En Zoon N.V.
- Other trademarks owned by Baggerwerken Decloedt En Zoon N.V.
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named ECOPLUME
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 19, 2026 | C71T | CANCELLED SECTION 71 | — |
| Apr 2, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 3, 2024 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Aug 18, 2023 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 6, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 10, 2020 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 21, 2020 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 21, 2020 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 3, 2020 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 3, 2019 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 19, 2019 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Sep 17, 2019 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Sep 17, 2019 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 28, 2019 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Aug 28, 2019 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Aug 28, 2019 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Aug 9, 2019 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 1, 2019 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jul 12, 2019 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 12, 2019 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 12, 2019 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 12, 2019 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 12, 2019 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 12, 2019 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 11, 2019 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 3, 2019 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Dec 31, 2018 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Dec 26, 2018 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 26, 2018 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 10, 2018 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 10, 2018 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 10, 2018 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Dec 10, 2018 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Dec 10, 2018 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 21, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 21, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 21, 2018 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Oct 2, 2018 | GNS1 | NOTIFICATION OF SUBSEQUENT FINAL EMAILED | — |
| Oct 2, 2018 | GNCF | CONTINUATION OF FINAL REFUSAL E-MAILED | — |
| Oct 2, 2018 | CNCF | ACTION CONTINUING A FINAL - COMPLETED | — |
| Sep 11, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 10, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 10, 2018 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 9, 2018 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 9, 2018 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 9, 2018 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Feb 12, 2018 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 12, 2018 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 9, 2018 | ALIE | ASSIGNED TO LIE | — |
| Feb 1, 2018 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 1, 2018 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 1, 2018 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 25, 2017 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 4, 2017 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 4, 2017 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 4, 2017 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 3, 2017 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 1, 2017 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 26, 2017 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 26, 2017 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 20, 2017 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |