Drawing for TECNOSTRUTTURE

USPTO serial 79213952

TECNOSTRUTTURE

Reviewed by CopyMark Law Group

Reg. 5494580Status 707Registered
Filing date
Status date
Registration date
Jun 19, 2018
Examiner
RICHARDSON, JENNIFER D
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with TECNOSTRUTTURE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christopher M. Scherer

Christopher M. Scherer Godfrey & Kahn, S.C.833 E. Michigan St.Suite 1800Milwaukee, WI 53202

Goods and services

ClassDescriptionStatusFirst use
006[ Common metals and their alloys; buildings, transportable, of metal; pipes and tubes of metal; steel, unwrought or semi-wrought; aluminium; copper rings, namely, ring-shaped fittings of copper; screw rings of metal; angle irons of metal; lintels of metal; reinforcing materials, of metal, for concrete; reinforcing materials of metal for building; laths of metal; masts of metal; winding spools of metal, non-mechanical, for flexible hoses; platforms, prefabricated, of metal; wash down spray nozzles of metal for commercial and industrial use; kits for building prefabricated houses of metal; shuttering of metal for concrete; cables of metal, non-electric; collars of metal for fastening pipes; pillars of metal for buildings; advertisement columns of metal; roof coverings of metal; roofing of metal; cornices of metal; portable steel buildings; transportable buildings of metal; nuts of metal; tinplate; chrome iron; iron, unwrought or semi-wrought; molybdenum iron; silicon iron; titanium iron; tungsten iron; steel wire; aluminium wire; copper wire, not insulated; wire of common metal alloys, except fuse wire; wire of common metal; thread of metal for tying-up purposes; soldering wire of metal; iron wire; barbed wire; cast steel; cast iron, unwrought or semi-wrought; cable joints of metal, non- electric; elbows of metal for pipes; duckboards of metal; scaffolding of metal; cask stands of metal; sheets and door kick plates of metal; steel sheets; slabs of metal for building; paving blocks of metal; bindings of metal, namely, binding screws; steel alloys; alloys of common metal; building materials of metal, namely, building panels of metal, building boards of metal, and metal partitions for building; refractory construction materials of metal; brackets of metal for building; common metals, unwrought or semi-wrought; mullions of metal; sheet piles of metal; steel masts; posts of metal; building boards of metal; metal anchor plates; metal shims; gates of metal; joists of metal; junctions of metal for pipes; cladding of metal for construction and building; wall claddings of metal for building; wall linings of metal for building; ceilings of metal; props of metal, namely, metal pipe supports; foundry molds of metal; wrapping or binding bands of metal; framework of metal for building; wall plugs of metal; frames of metal for building; stretchers for iron bands, namely, metal tension links; trellis of metal; beams of metal; pipework of metal; steel pipes; branching pipes of metal; gutter pipes of metal; drain pipes of metal; clips of metal for cables and pipes; all the afore-mentioned goods not for chimneys or fireplaces ]SECTION 71 - CANCELLED—
019[ Building materials, not of metal, namely, fly ash, semi-worked woods and concrete poles; rigid pipes, not of metal, for building; roof flashing, not of metal; angle irons, not of metal; lintels, not of metal; scaffolding, not of metal; reinforcing materials, not of metal, for building; concrete; reeds for building, namely, non-metal posts for building; kits for building prefabricated houses, not of metal; shuttering, not of metal, for concrete; cement; asbestos cement; magnesia cement; cement for blast furnaces; cement for furnaces; advertisement columns, not of metal; roofing, not of metal; roofing, not of metal, incorporating solar cells; roof coverings, not of metal; buildings, transportable, not of metal; prefabricated buildings, not of metal; concrete building elements, namely, concrete walls for building; cement slabs; paving blocks, not of metal; mortar for building; refractory construction materials, not of metal; materials for making and coating roads, namely, road asphalt, tar-based asphalt sealants; road coating materials, namely, tar coatings for use on pavements; decorative moldings, not of metal, for use in building construction; framework, not of metal, for building; sheet piles, not of metal; cement posts; posts, not of metal; building panels, not of metal; props, not of metal, namely, plastic pipe supports; gates, not of metal; joists, not of metal; cladding, not of metal, for building; wainscotting, not of metal; wall claddings, not of metal, for building; ceilings, not of metal; slabs, not of metal for building; beams, not of metal; non-metal hips for roofing; scantlings, namely, building timber for carpentry; gutter pipes, not of metal; drain pipes, not of metal; sandstone pipes; branching pipes, not of metal ]SECTION 71 - CANCELLED—
037[ Construction of buildings; repair of buildings; installation services of metallic and non-metallic building materials, namely, metal beams and building insulation; construction consultancy; rustproofing; excluding construction, repair, maintenance, installation services in relation to chimneys, fireplaces and ventilation installations and apparatus ]SECTION 71 - CANCELLED—
042Updating of computer software; [ computer system analysis; interior design; electronic data storage; material testing; conducting technical project studies, namely, feasibility studies in the field of environmental engineering; ] architectural consultancy; [ computer software consultancy; ] computer software design; engineering; surveying; computer system design; construction drafting [ ; computer programming; research and development of new products for others; technical research in the field of aeronautics; technical writing; architectural services ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 2, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jun 5, 2026INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jun 5, 2026INPCINVALIDATION PROCESSED—
Nov 12, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Aug 26, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 26, 2025ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS—
Aug 26, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 26, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 26, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Aug 26, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Mar 12, 2025NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Mar 12, 202571.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Mar 11, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 22, 2024ES71TEAS SECTION 71 RECEIVED—
Jun 19, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Oct 19, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 27, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 27, 2018FIMPFINAL DISPOSITION PROCESSED—
Sep 19, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 19, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 13, 2018GPNXNOTIFICATION PROCESSED BY IB—
Apr 3, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 3, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 28, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 28, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 14, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Feb 23, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 23, 2018XAECEXAMINER'S AMENDMENT ENTERED—
Feb 23, 2018GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 23, 2018GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 23, 2018CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 14, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 14, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 2, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 2, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 2, 2018ALIEASSIGNED TO LIE—
Jan 25, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 8, 2017RFNTREFUSAL PROCESSED BY IB—
Aug 24, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 24, 2017RFRRREFUSAL PROCESSED BY MPU—
Aug 23, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 22, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 19, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 15, 2017DOCKASSIGNED TO EXAMINER—
Aug 15, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 10, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance