Drawing for RATEC

USPTO serial 79214087

RATEC

Reviewed by CopyMark Law Group

Reg. 5516068Status 708Registered
Filing date
Status date
Registration date
Jul 17, 2018
Examiner
ELLINGER FATHY, JESSICA M
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with RATEC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Lawrence H. Binderow, Attorney at Law

Lawrence H. Binderow, Attorney at Law BINDEROW LAW OFFICES1330 Camino Del MarSuite 250Del Mar, CA 92014

Goods and services

ClassDescriptionStatusFirst use
006[ Common metals and their alloys, unwrought or semi-wrought; ] casting molds of metal for concrete; shuttering of metal for concrete; metal shuttering for concrete; battery molds of metal for concrete; shuttering of metal and systems composed thereof; girders of common metals for shuttering systems; shuttering adaptors of metal for fixing of shuttering elements; [ buildings and transportable buildings of metal ] * all of the above-referenced products being linked to the commercialization, including the production and sale of concrete, in particular precast concrete elements *ACTIVE—
007Rotary pumps; concrete pumps; [ concrete spraying machines; ] valves for pumps; pumps for concrete; [crane concrete distributors; concrete compactors; concrete finishing machines; concrete construction machines; surface finisher for concrete; ] concrete filling connectors for pumpsACTIVE—
009Magnets; [ magnets for industrial purposes; ] Magnets, namely, magnetic bars; magnets, namely, magnetic clamps for fixing of shuttering; magnets, namely, magnetic holders of metal for shuttering; magnets for shuttering systems; electrical box magnets; insert magnetsACTIVE—
037[Building construction services; installation of prefabricated concrete elements and demolition of building services; construction of prefabricated houses; general building contractor services relating to building for industry purposes; concreting, namely, concrete raising and concrete leveling services; construction of buildings and other structures; house building; concrete pumping services; providing information relating to building construction; construction consultation; building construction supervision * ; all of the above-referenced services being linked to the commercialization, including the production and sale of concrete, in particular precast concrete elements * ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 30, 2026TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 30, 2026ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 30, 2026REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 26, 2025INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Oct 18, 2025INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jul 10, 2025XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Jul 10, 2025XXCRGENERIC MADRID TRANSACTION CREATED—
Jun 3, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 11, 2025INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 3, 2024NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Oct 3, 2024C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Aug 15, 2024EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Aug 11, 2024PR75POST REGISTRATION ACTION MAILED - SEC. 71 & 15—
Jul 5, 2024ES75TEAS SECTION 71 & 15 RECEIVED—
Jul 17, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 24, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 19, 2021INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Feb 16, 2021INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 16, 2020LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Jun 2, 2020COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jun 2, 2020PLGLASSIGNED TO PARALEGAL—
Oct 4, 2019LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Dec 21, 2018FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 30, 2018XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Oct 30, 2018XXCRGENERIC MADRID TRANSACTION CREATED—
Oct 17, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 17, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 1, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 1, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 27, 2018GPNXNOTIFICATION PROCESSED BY IB—
Apr 11, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 11, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 11, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 23, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 21, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 21, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 18, 2018ALIEASSIGNED TO LIE—
Mar 6, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 29, 2017RFNTREFUSAL PROCESSED BY IB—
Sep 13, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 13, 2017RFRRREFUSAL PROCESSED BY MPU—
Sep 8, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 7, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 31, 2017DOCKASSIGNED TO EXAMINER—
Aug 19, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 15, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 10, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance