Drawing for CT TURBO

USPTO serial 79214584

CT TURBO

Reviewed by CopyMark Law Group

Reg. 5629942Status 709
Filing date
Status date
Registration date
Dec 18, 2018
Examiner
GLASSER, CARYN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with CT TURBO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Compressors for heat pumps; turbines for other than land vehicles, current generators, DC generators, AC generators, electricity generators, electric generators, motors and engines except for land vehicles, having magnetic bearings and rotating systems composed thereofSECTION 71 - CANCELLED—
009Electronic control or regulating apparatus, in particular controls and regulators for heat pumps; power-electronic devices, apparatuses and instruments for switching, converting, regulating and controlling electricity, namely, power switches, differential switches, electric current switches, electric switches, electrical switches, current converters, electronic currency converters, electric power converters, dc/ac power converters, electric converters, direct current converters, voltage regulators, static voltage regulators, voltage regulators for electric power, electrical controlling devices, power controllers, electronic control systems for engines, apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current, namely batteries, electric controlling devices, electric control panelsSECTION 71 - CANCELLED—
011Heating, vapor generating, cooling, drying and ventilating devices, namely, heat pumps, evaporators for heat pumps, condensers for heat pumps and installations for thermal energy efficiency, storage of energy and conversion of energy composed of the aforementioned goodsSECTION 71 - CANCELLED—
037Maintenance of technical installations in the field of energy, in particular installations for the purpose of heating, vapor generation, cooling, drying, ventilation, storage of energy and conversion of energySECTION 71 - CANCELLED—
042Development of new products, new technology for technical installations in the field of energy, in particular installations for the purpose of heating, vapor generation, cooling, drying, ventilation, storage of energy and conversion of energySECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 4, 2026INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 4, 2025C71TCANCELLED SECTION 71—
May 5, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 15, 2024CHLDCHANGE OF OWNER RECEIVED FROM IB—
Dec 18, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 12, 2019FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 22, 2019FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 22, 2019FIMPFINAL DISPOSITION PROCESSED—
Mar 18, 2019FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 18, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 2, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 2, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 29, 2018GPNXNOTIFICATION PROCESSED BY IB—
Sep 12, 2018OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 12, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Sep 12, 2018OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 25, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 25, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 24, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 24, 2018ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 26, 2018GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 26, 2018GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 26, 2018CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 12, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 12, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 9, 2018ALIEASSIGNED TO LIE—
Feb 26, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 15, 2017RFNTREFUSAL PROCESSED BY IB—
Aug 28, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 28, 2017RFRRREFUSAL PROCESSED BY MPU—
Aug 25, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 25, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Aug 24, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 21, 2017DOCKASSIGNED TO EXAMINER—
Aug 21, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Aug 17, 2017REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance