Drawing for INBA

USPTO serial 79216240

INBA

Reviewed by CopyMark Law Group

Reg. 5505493Status 707Registered
Filing date
Status date
Registration date
Jul 3, 2018
Examiner
FREEMAN, BREANNA SHALEISE
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with INBA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey H. Handelsman

Jeffrey H. Handelsman Greenblum & Bernstein, P.L.C.1950 Roland Clarke PlaceReston, VA 20191-1411United States

Goods and services

ClassDescriptionStatusFirst use
007[ Machines and machine tools, namely, casting machines, steel working machines and metalworking machine tools; electric motors and engines not for land vehicles for use in the steel working industry; machine coupling and transmission components not for land vehicles, namely, transmission gears for machines and bearings for transmission shafts, being parts of machines; foundry machines, namely, casting machines; ore-treating machines; industrial manipulator machines, namely, manipulators for forging presses and for forging machines; metalworking machines; electromechanical apparatus and valves, namely, spherical valves and butterfly valves being parts of metalworking machines; apparatus and installations for granulation, namely, granulation machines for use in the steel working industry; filtering apparatus and installations for materials, namely, machine used for process filtration in the steel working industry; compressed air machines, namely, compressed air pumps, pneumatic motors and pneumatic cylinder actuators; conveyor belts; engine timing components, namely, driving chains other than for land vehicles; transmission chains, other than for land vehicles, namely, transmission gears for machines; control mechanisms for machines, engines and motors, namely, hydraulic and pneumatic linear actuators for machines; hydraulic and pneumatic controls for machines, motors and engines, namely, hydraulic and pneumatic door closers and openers; hydraulic and pneumatic devices for granulation of cinders and slag, namely, granulating machines; parts of machines, namely, heat exchangers in the nature of radiators for motors and engines; ignition parts for internal combustion engines, namely, condensers; pumps, namely, piston type pumps for cooling engines; centrifugal pumps; filters for steel working machines ]SECTION 71 - CANCELLED—
011[ Heating, drying, ventilation and water distribution apparatus, namely, industrial dryers for heating and dehumidifying, heat exchangers not being part of machines, multiple hearth furnaces; drying drums, namely, kilns; water conduit installations, namely, water purification settling tanks; water distribution installations, namely, water purification settling tanks; water supply installations, namely, water purification settling tanks; ] water cooling installations, namely, water cooling towers that feature cooling fans; water and gas filtering units for industrial use; pressurized water tanks, namely, hot water tanks; water cooling apparatus, namely, pipe heat exchangers not being part of machines that feature cooling fans [ ; air filters for industrial iron-and-steel metallurgy installations; coolers for liquids, namely, pipe heat exchangers not being part of machines that feature cooling fans; cooling apparatus and installations, namely, pipe heat exchangers not being part of machines that feature cooling fans; steam accumulators ]ACTIVE—
037[ Construction of blast furnaces; repair of blast furnaces; installation of blast furnaces; installation, maintenance and repair of hardfacing apparatus for surface treatment, namely, installation, maintenance and repair of oxygen converters for steel production and granulation tanks; ] construction supervision and managementACTIVE—
040[ Treatment of materials, namely, treatment of metal or steel; information concerning treatment of materials; material treatment services, namely, granulation of slag of blast furnaces and of copper matte of copper production units ] material treatment services, namely, filtration of slag of blast furnaces and of copper matte of copper production units; material treatment services, namely, granulation and filtration of blast furnace slag and converter slagACTIVE—
042[ Scientific research in the steelmaking industry; design and development of computers and software for others; legal services; building consultancy, namely planning of buildings and infrastructure systems for buildings; construction drafting; technical project studies, namely, conducting of scientific feasibility studies; technical advice about steel, namely, provision of scientific information, advice and consultancy in relation to steelmaking; ] conducting engineering surveys [ ; engineering; mechanical research; scientific research services in the field of iron-and-steel metallurgy; scientific, technical and mechanical research in the field of granulation of materials, iron-and steel metallurgy and non-ferrous metallurgy ]ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 15, 2026INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Aug 30, 2026XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Aug 29, 2026XXCRGENERIC MADRID TRANSACTION CREATED—
Jan 17, 2026INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 17, 2025NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 17, 202571.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
May 17, 2025NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 17, 202571.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
May 17, 2025NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 17, 202571.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
May 17, 2025NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
May 17, 2025CORVREVIEW OF CORRESPONDENCE COMPLETE - INFORMATION MADE OF RECORD—
May 17, 202571.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
May 5, 2025APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 14, 2025RNWLINTERNATIONAL REGISTRATION RENEWED—
Jan 3, 2025ES71TEAS SECTION 71 RECEIVED—
Jul 3, 2023REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jan 4, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Nov 2, 2018FINVFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 12, 2018FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 12, 2018FIMPFINAL DISPOSITION PROCESSED—
Oct 3, 2018FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 3, 2018R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 17, 2018NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 17, 2018PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 28, 2018NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 15, 2018CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 30, 2018TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 29, 2018CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 29, 2018TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 18, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 18, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 27, 2017RFNTREFUSAL PROCESSED BY IB—
Sep 26, 2017RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 26, 2017RFRRREFUSAL PROCESSED BY MPU—
Sep 21, 2017RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 20, 2017CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 20, 2017DOCKASSIGNED TO EXAMINER—
Sep 19, 2017MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 14, 2017NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 12, 2017LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Sep 7, 2017SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance